IP Library Granted Patent US 12,378,835
Granted Patent B2
US 12,378,835 · App. 18/456,859 · Granted Aug 5, 2025

Method and device for downhole treating gas wells

Inventors: Qiwei Wang (Dhahran, SA); Jairo Leal Jauregui (Udhailiyah, SA); Mauricio Armando Espinosa Galvis (Abqaiq, SA); Tao Chen (Dhahran, SA)
Assignee: Saudi Arabian Oil Company
E21B27/02
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,378,835
App. No.
18/456,859
Granted
Aug 5, 2025
Kind
B2
Abstract

A system and method are provided for adding chemicals to a produced fluid in a wellbore. An exemplary system includes a gauge hanger and a permeable container. The permeable container includes a solid cylindrical body, end caps placed at each end of the solid cylindrical body, and holes disposed proximate to each end of the permeable container, wherein the holes allow the produced fluid to flow through the permeable container from one end of the permeable container to the opposite end of the permeable container. The system further includes a well treatment chemical disposed in the permeable container.

Claims (40)

1. A method of adding chemicals to produced fluids in a wellbore, comprising:

placing a well treatment chemical in a permeable container, wherein the permeable container comprises:

a solid cylindrical body;

caps placed at each end of the solid cylindrical body; and

holes disposed proximate to each end of the permeable container, wherein a size of the holes, a number of the holes, or both are selected based, at least in part, on a concentration of hydrogen sulfide in the produced fluids; and

hanging the permeable container in a flow of the produced fluids, wherein the holes allow the produced fluid to flow through the permeable container from at one end of the permeable container to at an opposite end of the permeable container.

2. The method of claim 1 , wherein placing the well treatment chemical in the permeable container comprises filling the permeable container with an encapsulated corrosion inhibitor.

3. The method of claim 1 , comprising selecting a size of the holes disposed proximate to each end of the permeable container based, at least in part, on a target addition rate of the well treatment chemical.

4. The method of claim 1 , comprising selecting a location of the holes at each end of the permeable container based, at least in part, on a target addition rate of the well treatment chemical.

5. The method of claim 1 , comprising selecting a location of the holes at each end of the permeable container based, at least in part, on a flow rate of the produced fluids.

6. The method of claim 1 , comprising selecting a number of the holes disposed proximate to each end of the permeable container based, at least in part, on a target addition rate of the well treatment chemical.

7. The method of claim 1 , comprising selecting a size of the holes, a number the holes, or both, based, at least in part, on a concentration of carbon dioxide in the produced fluids.

8. The method of claim 1 , comprising suspending the permeable container in the wellbore using a gauge hanger.

9. The method of claim 1 , comprising suspending a second permeable container in the wellbore.

10. The method of claim 9 , comprising selecting a distance between the permeable container and the second permeable container based, at least in part, on the well treatment chemical used in each container.

11. The method of claim 9 , comprising:

placing a first type of chemical in the permeable container; and

placing a second type of chemical in the second permeable container.

12. The method of claim 11 , comprising:

placing an encapsulated corrosion inhibitor in the permeable container; and

placing an unencapsulated corrosion inhibitor in the second permeable container.

13. The method of claim 11 , comprising:

placing an encapsulated corrosion inhibitor in the permeable container; and

placing a kinetic hydrate inhibitor in the second permeable container.

14. A system for adding chemicals to a produced fluid in a wellbore, comprising:

a gauge hanger; and

a permeable container, wherein the permeable container comprises:

a solid cylindrical body;

end caps placed at each end of the solid cylindrical body; and

holes disposed proximate to each end of the permeable container, wherein the holes allow the produced fluid to flow through the permeable container from one end of the permeable container to the opposite end of the permeable container;

a well treatment chemical disposed in the permeable container; and

a second permeable container suspended from the permeable container by a cable.

15. The system of claim 14 , wherein the permeable container comprises the holes in the end caps, and wherein the holes are sized based, at least in part, on a flow rate of the produced fluid.

16. The system of claim 15 , wherein the permeable container comprises the holes in the solid cylindrical body proximate to the cap at each end of the solid cylindrical body.

17. The system of claim 14 , wherein a mesh screen is disposed over the holes.

18. The system of claim 14 , wherein the well treatment chemical comprises particles of an encapsulated corrosion inhibitor disposed in the permeable container.

19. The system of claim 14 , wherein the well treatment chemical comprises a kinetic hydrate inhibitor disposed in the permeable container.

20. The system of claim 14 , wherein a length of the cable is selected based, at least in part, on the well treatment chemical disposed in the permeable container and a second well treatment chemical disposed in the second permeable container.

21. The system of claim 14 , wherein a second well treatment chemical disposed in the second permeable container comprises a corrosion inhibitor.

22. The system of claim 14 , wherein a second well treatment chemical disposed in the second permeable container comprises a kinetic hydrate inhibitor.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 16, 2023
From: WANG, QIWEI; JAUREGUI, JAIRO LEAL; ESPINOSA GALVIS, MAURICIO ARMANDO; CHEN, TAO
To: SAUDI ARABIAN OIL COMPANY
Reel/Frame 065586/0438 →
Continuity (1)
Related Publication 20250075577A1 · Mar 6, 2025
References Cited (58)
US 2760584A · Rohrback · 1956 [cited by applicant]
US 4291763A · Singer · 1981 [cited by applicant]
US 4713184A · Zaid · 1987 [cited by applicant]
US 4923617A · Heilweil et al. · 1990 [cited by applicant]
US 5294371A · Clubley et al. · 1994 [cited by applicant]
US 5330004A · Williams et al. · 1994 [cited by applicant]
US 5403493A · Mouche · 1995 [cited by applicant]
US 6478089B2 · Alves et al. · 2002 [cited by applicant]
US 6655475B1 · Wald · 2003 [cited by applicant]
US 7196040B2 · Heath et al. · 2007 [cited by applicant]
US 7419937B2 · Rimmer et al. · 2008 [cited by applicant]
US 7556100B2 · Steiner · 2009 [cited by applicant]
US 8323417B2 · Fan et al. · 2012 [cited by applicant]
US 9447657B2 · Parker · 2016 [cited by applicant]
US 9890623B2 · Ghorbani et al. · 2018 [cited by applicant]
US 10280714B2 · Fouchard · 2019 [cited by applicant]
US 10421893B2 · Vo et al. · 2019 [cited by applicant]
US 10717918B2 · Fouchard et al. · 2020 [cited by applicant]
US 10865339B2 · Dreyer et al. · 2020 [cited by applicant]
US 11015069B2 · Xia et al. · 2021 [cited by applicant]
US 11142680B2 · Dreyer et al. · 2021 [cited by applicant]
US 20040084186A1 · Allison · 2004 [cited by applicant]
US 20070039739A1 · Wilson · 2007 [cited by examiner]
US 20090114247A1 · Brown et al. · 2009 [cited by applicant]
US 20110162841A1 · Wilson · 2011 [cited by applicant]
US 20110308625A1 · Stoisits · 2011 [cited by examiner]
US 20150233228A1 · Roth · 2015 [cited by applicant]
US 20180340114A1 · Fouchard et al. · 2018 [cited by applicant]
US 20200340334A1 · Jarratt · 2020 [cited by examiner]
US 20210010366A1 · Chen et al. · 2021 [cited by applicant]
US 20220397031A1 · Gomes · 2022 [cited by examiner]
US 20230167558A1 · Chen et al. · 2023 [cited by applicant]
US 20240141756A1 · Wang et al. · 2024 [cited by applicant]
Al-Tammar et al., “Downhole Corrosion/Scaling Operational Experience and Challenges in HP/HT Gas Condensate Producers,” Paper presented at the SPE International Oilfield Corrosion Conference and Exhibition, Aberdeen, Sc… [cited by applicant]
Al-Thuwaini et al., “Encapsulated Scale Inhibitor Treatment,” Paper SPE-37790-MS, presented at the SPE Middle East Oil Show, Bahrain, Mar. 1997, 5 pages. [cited by applicant]
Askari et al., “Downhole corrosion inhibitors for oil and gas production—a review,” Applied Surface Science Advances, Dec. 2021, 6, 23 pages. [cited by applicant]
Asrar et al., “Corrosion—The Longest War,” Oilfield Reviews, May 2016, 28(2):16 pages. [cited by applicant]
Bentiss, et al., “The Substituted 1,3,4-Oxadiazoles: A New Class of Corrosion In-hibitors of Mild Steel in Acidic Media,” Corrosion Science, 2000, 42:127-146, 20 pages. [cited by applicant]
Bhaduri et al., “Application of Solid Scale Inhibitor in Annular Space to Reduce Well Intervention Cost,” Paper SPE-189489-MS, 2018, 9 pages. [cited by applicant]
Bhaduri et al., “The Application of Solid Scale Inhibitor in Deepwater Completion to Reduce Well Intervention Costs,” NACE-2018-10534, 2018, 14 pages. [cited by applicant]
Bourne et al., “Effective Treatment of Subsea Wells with a Solid Scale Inhibitor System,” Paper SPE-60207-MS, Second International Symposium on Oilfield Scale held in Aberdeen, UK, Jan. 2000, 9 pages. [cited by applicant]
Chen et al., “Saudi Arabia's Master Gas System—Its Overview and the Corrosion Control Programs,” SPE Annual Technical Conference and Exhibition, New Orleans, Louisiana, Paper No. SPE-11107-MS, Sep. 1982, 8 pages. [cited by applicant]
Duncan et al., “Foam Sticks Application to Increase Production and Encapsulated Inhibitors to Mitigate Corrosion & Scale Formation,” Paper SPE-156213-MS, SPE/PAPG Annual Technical Conference held in Islambad, Pakistan, … [cited by applicant]
Fingar et al., “Application of corrosion inhibitors for steels in acidic media for the oil and gas industry: A review,” Corrosion Science, Sep. 2014, 86:17-41, 25 pages. [cited by applicant]
Hsu et al., “Encapsulated Scale Inhibitor Treatments experience in the Ghawar Field, Saudi Arabia,” SPE-60209-MS, presented at the 2000 Second International Symposium on Oilfield Scale, Aberdeen, UK, Jan. 2000, 6 pages. [cited by applicant]
Jenkins, “The Challenges Associated with the Development and Application of Oil and Gas Corrosion Inhibitors,” SPE-169615-MS, SPE International Oilfield Corrosion Conference and Exhibition held in Aberdeen, Scotland, UK… [cited by applicant]
Kasnick, “Khuff Gas Production Experience,” Paper presented at the Middle East Oil Show, Bahrain, Mar. 1987, Paper No. SPE-15764-MS, Mar. 1987, 8 pages. [cited by applicant]
Leal et al., “Successful Long Duration Batch Treatment of Gas Well to Prevent Corrosion Challenges and Solutions,” Paper presented at the International Petroleum Technology Conference, Dhahran, Kingdom of Saudi Arabia, … [cited by applicant]
Leasure et al., “Effective Scale Prevention Using Chemically Infused Proppant—A Uinta Basin Case History,” SPE-173792-MS, presented at the SPE International Symposium on Oilfield Chemistry, The Woodlands, Texas, USA, Ap… [cited by applicant]
Mainier et al., Evaluation of Titanium in Hydrochloric Acid Solutions Containing Corrosion Inhibitors, IOSR Journal of Mechanical and Civil Engineering, Dec. 2013, 10(1):66-69, 4 pages. [cited by applicant]
Powell et al., “Encapsulated Scale Inhibitor for Use in Fracturing Treatments,” Paper SPE-30700-MS, presented at the SPE Annual Conference and Exhibition, Dallas, TX, USA, Oct. 1995, 7 pages. [cited by applicant]
Ruiz et al., “Application of Encapsulated Scale Inhibitors—Understanding the Field Success Factors,” Paper NACE-2017-9527, 2017, 16 pages. [cited by applicant]
Schenkel et al., “Production Optimization: Understanding and Solving Scale Formation in Mature Gas Wells,” SPE-201301-MS, presented at the SPE Annual Technical Conference & Exhibition, Denver, Colorado, USA, Oct. 2020, … [cited by applicant]
Szymczak et al., “Minimizing Environmental and Economic Risks with a Proppant-Sized Solid Scale Inhibitor Additive in the Bakken Formation,” SPE-159701-MS, Society of Petroleum Engineers, 2012, pages. [cited by applicant]
Turki, “Drilling and Production of Khuff Gas Wells, Saudi Arabia,” Paper presented at the SPE/IADC Drilling Conference, Amsterdam, Netherlands, Paper No. SPE-21975-MS, Mar. 1991, 10 pages. [cited by applicant]
Watson et al., “Foam Sticks Application to Increase Production and Encapsulated Inhibitors to Mitigate Corrosion & Scale Formation,” SPE-156213-MS, presented at the SPE/PAPG Annual Technical Conference, Islamabad, Pakis… [cited by applicant]
Weghorn et al., “Enhancing Chemical Efficiency Using Slow-Release Corrosion Inhibitors,” SPE-93169-MS, Spe International Symposium on Oilfield Chemistry in Houston, Texas, Feb. 2005, 5 pages. [cited by applicant]
Weghorn et al., “Field Evaluation of An Encapsulated Time-Release Corrosion Inhibitor,” NACE-07321, 2007, 10 pages. [cited by applicant]
Cited By (1)
US 12,716,308