IP Library › Granted Patent US 12,389,284
Granted Patent B2
US 12,389,284 · App. 17/789,827 · Granted Aug 12, 2025

Radio network node, user equipment (UE) and methods performed therein

Inventors: Oscar Ohlsson (Bromma, SE); Johan Rune (Lidingö, SE); Pontus Wallentin (Linköping, SE); Claes-Göran Persson (Mjölby, SE)
Assignee: Telefonaktiebolaget LM Ericsson (publ)
H04W36/0038H04L47/34H04W12/037H04W36/0005H04W36/0079H04W36/185H04W36/0055H04W36/0235
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,389,284
App. No.
17/789,827
Granted
Aug 12, 2025
Kind
B2
Abstract

Embodiments herein relate to for example a method performed by a radio network node for handling a communication of a user equipment, UE, in a wireless communication network. The radio network node transmits a handover command for handing over the UE, from a source cell to a target cell, wherein a security parameter for encrypting data communicated between the radio network node and the UE is retained during the handover. Furthermore, the radio network node maintains a sequence number status for reception and/or transmission of a signalling radio bearer of the UE during the handover from the source cell to the target cell, and/or at a fallback from the target cell to the source cell, when the UE triggers the fallback to the source cell.

Claims (39)

1. A method performed by a radio network node for handling a communication of a user equipment, UE, in a wireless communication network, the method comprising:

transmitting, to the UE, a handover command for handing over, in a make before break handover, the UE from a source cell to a target cell, wherein a security key for encrypting data communicated between the radio network node and the UE is retained during the make before break handover, and

maintaining, by the radio network node, a sequence number status for reception and/or transmission of a signalling radio bearer of the UE, wherein the maintaining is performed a) during the make before break handover from the source cell to the target cell, b) during a fallback from the target cell to the source cell, and c) when the UE triggers the fallback to the source cell, wherein maintaining the sequence number status comprises maintaining sequential incrementation of a Packet Data Convergence Protocol, PDCP, downlink or uplink, DL/UL, COUNT value for signalling radio bearer one, SRB1, at the make before break handover to the target cell and at fallback to the source cell of the UE.

2. The method according to claim 1 , wherein the sequence number status is a count number of a counter.

3. The method according to claim 1 , wherein the fallback is triggered in case of a handover failure in the target cell.

4. The method according to claim 1 , further comprising:

receiving a handover complete message from the UE on the signalling radio bearer in the target cell using sequence number n+1, where n is the sequence number of the last packet received on the signalling radio bearer in the source cell; and, in case the random access in the target cell fails and the UE triggers fallback to the source cell, maintaining sequence number status for the signalling radio bearer during the fallback of the UE from the target cell to the source cell.

5. The method according to claim 4 , further comprising:

receiving a fallback indication message on the signalling radio bearer in the source cell using packet sequence number n+2 or n+1 depending on if the handover complete message was transmitted by the UE in the source cell when the fallback was triggered.

6. A method performed by a user equipment, UE, for handling communication of the UE in a wireless communication network, the method comprising:

receiving, from a radio network node, a handover command for handing over the UE in a make before break handover, from a source cell to a target cell, wherein a security key used for encrypting data communicated between the wireless communication network and the UE, is retained during the make before break handover, and

maintaining, by the UE, a sequence number status for transmission of a signalling radio bearer of the UE, wherein the maintaining is performed a) during the make before break handover from the source cell to the target cell, b) during a fallback from the target cell to the source cell, and c) when the UE triggers the fallback to the source cell, wherein maintaining the sequence number status comprises maintaining sequential incrementation of a Packet Data Convergence Protocol, PDCP, uplink, UL, COUNT value for signalling radio bearer one, SRB1, at the make before break handover to the target cell and at fallback to the source cell of the UE.

7. The method according to claim 6 , wherein the handover command instructs the UE to perform a Dual Active Protocol Stack, DAPS, handover from the source cell to the target cell and wherein the security key is retained during the make before break handover; and the sequence number status for a signalling radio bearer during the make before break handover from the source cell to the target cell is maintained; the method further comprising:

transmitting a handover complete message to wireless communication network on the signalling radio bearer in the target cell using sequence number n+1, where n is a sequence number of the last packet transmitted on the signalling radio bearer in the source cell.

8. The method according to claim 7 , wherein, in case fallback to the source cell is triggered due to handover failure in the target cell, the packet sequence number status is maintained for the signalling radio bearer during the fallback from the target cell to the source cell, and the method further comprising:

transmitting a fallback indication message on the signalling radio bearer in the source cell using packet sequence number n+2 or n+1 depending on if the handover complete message was transmitted in the target cell when the fallback was triggered.

9. The method according to claim 6 , wherein the sequence number status is a count number of a counter.

10. The method according to claim 6 , wherein the fallback is triggered in case of a handover failure in the target cell.

11. A radio network node for handling a communication of a user equipment, UE, in a wireless communication network, wherein the radio network node is configured to:

transmit, to the UE, a handover command for handing over, in a make before break handover, the UE from a source cell to a target cell, wherein a security key for encrypting data communicated between the radio network node and the UE is retained during the make before break handover, and

maintain, by the radio network node, a sequence number status for reception and/or transmission of a signalling radio bearer of the UE, wherein the maintaining is performed a) during the make before break handover from the source cell to the target cell, b) during and at a fallback from the target cell to the source cell, and c) when the UE triggers the fallback to the source cell, wherein the radio network node is configured to maintain the sequence number status by maintaining sequential incrementation of a Packet Data Convergence Protocol, PDCP, downlink or uplink, DL/UL, COUNT value for signalling radio bearer one, SRB1, at the make before break handover to the target cell and at fallback to the source cell of the UE.

12. The radio network node according to claim 11 , wherein the sequence number status is a count number of a counter.

13. The radio network node according to claim 11 , wherein the fallback is triggered in case of a handover failure in the target cell.

14. The radio network node according to claim 11 , wherein the radio network node is further configured to:

receive a handover complete message from the UE on the signalling radio bearer in the target cell using sequence number n+1, where n is the sequence number of the last packet received on the signalling radio bearer in the source cell; and, in case the random access in the target cell fails and the UE triggers fallback to the source cell, to maintain the sequence number status for the signalling radio bearer during the fallback of the UE from the target cell to the source cell.

15. The radio network node according to claim 11 , wherein the radio network node is further configured to:

receive a fallback indication message on the signalling radio bearer in the source cell using packet sequence number n+2 or n+1 depending on if the handover complete message was transmitted by the UE in the source cell when the fallback was triggered.

16. A user equipment, UE, for handling communication of the UE in a wireless communication network, wherein the UE is configured to:

receive, from a radio network node, a handover command for handing over the UE in a make before break handover, from a source cell to a target cell, wherein a security key used for encrypting data communicated between the wireless communication network and the UE, is retained during the make before break handover, and

maintain, by the UE, a sequence number status for transmission of a signalling radio bearer of the UE, wherein the maintaining is performed a) during the make before break handover from the source cell to the target cell, b) during a fallback from the target cell to the source cell, and c) when the UE triggers the fallback to the source cell, wherein the UE is configured to maintain the sequence number status by maintaining sequential incrementation of a Packet Data Convergence Protocol, PDCP, uplink, UL, COUNT value for signalling radio bearer one, SRB1, at the make before break handover to the target cell and at fallback to the source cell of the UE.

17. The UE according to claim 16 , wherein the handover command instructs the UE to perform a Dual Active Protocol Stack, DAPS, handover from the source cell to the target cell and wherein the security key is retained during the make before break handover; and the sequence number status for a signalling radio bearer during the make before break handover from the source cell to the target cell is maintained; wherein the UE is further configured to:

transmit a handover complete message to the radio network node on the signalling radio bearer in the target cell using sequence number n+1, where n is the sequence number of the last packet transmitted on the signalling radio bearer in the source cell.

18. The UE according to claim 17 , wherein, in case fallback to the source cell is triggered due to handover failure in the target cell, the sequence number status is maintained for the signalling radio bearer during the fallback from the target cell to the source cell, and the user equipment is further configured to:

transmit a fallback indication message on the signalling radio bearer in the source cell using sequence number status n+2 or n+1 depending on if the handover complete message was transmitted in the target cell when the fallback was triggered.

19. The UE according to claim 16 , wherein the sequence number status is a count number of a counter.

20. The UE according to claim 16 , wherein the fallback is triggered in case of a handover failure in the target cell.

21. A non-transitory computer-readable medium comprising instructions, which, when executed on at least one processor, cause the at least one processor to:

transmit, to a User Equipment, UE, a handover command for handing over, in a make before break handover, the UE from a source cell to a target cell, wherein a security key for encrypting data communicated between the radio network node and the UE is retained during the make before break handover, and

maintain, by the radio network node, a sequence number status for reception and/or transmission of a signalling radio bearer of the UE, wherein the maintaining is performed a) during the make before break handover from the source cell to the target cell, b) during a fallback from the target cell to the source cell, and c) when the UE triggers the fallback to the source cell, wherein the radio network node is configured to maintain the sequence number status by maintaining sequential incrementation of a Packet Data Convergence Protocol, PDCP, downlink or uplink, DL/UL, COUNT value for signalling radio bearer one, SRB1, at the make before break handover to the target cell and at fallback to the source cell of the UE.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 29, 2022
From: OHLSSON, OSCAR; RUNE, JOHAN; WALLENTIN, PONTUS; PERSSON, CLAES-GÖRAN
To: TELEFONAKTIEBOLAGET LM ERICSSON (PUBL)
Reel/Frame 060350/0254 →
Continuity (2)
Provisional Application 62975816 · Feb 13, 2020
Related Publication 20230053069A1 · Feb 16, 2023
References Cited (38)
US 20180367288A1 · Vrzic et al. · 2018 [cited by applicant]
US 20190037635A1 · Guo · 2019 [cited by examiner]
US 20190159065A1 · Kim · 2019 [cited by examiner]
US 20190223073A1 · Chen · 2019 [cited by examiner]
US 20190253945A1 · Paladugu · 2019 [cited by examiner]
US 20200314714A1 · Jung · 2020 [cited by examiner]
US 20210014764A1 · Zhang · 2021 [cited by examiner]
US 20210092654A1 · Kadiri · 2021 [cited by examiner]
US 20210105681A1 · Paladugu · 2021 [cited by examiner]
US 20210105688A1 · Paladugu · 2021 [cited by examiner]
US 20210136638A1 · Paladugu · 2021 [cited by examiner]
US 20220232374A1 · Yoo · 2022 [cited by examiner]
US 20220408323A1 · Ishii · 2022 [cited by examiner]
CN 101779493A · 2010 [cited by applicant]
CN 108886722A · 2018 [cited by applicant]
JP 2014042263A · 2014 [cited by applicant]
Author Unknown, “Technical Specification Group Radio Access Network; NR; Packet Data Convergence Protocol (PDCP) specification (Release 15),” Technical Specification 38.323, Version 15.6.0, Jun. 2019, 3GPP Organizationa… [cited by applicant]
Author Unknown, “Technical Specification Group Radio Access Network; NR; NR and NG-RAN Overall Description; Stage 2 (Release 16),” Technical Specification 38.300, Version 16.0.0, Dec. 2019, 3GPP Organizational Partners,… [cited by applicant]
Author Unknown, “Technical Specification Group Radio Access Network; NR; Radio Resource Control (RRC) protocol specification (Release 15),” Technical Specification 38.331, Version 15.8.0, Dec. 2019, 3GPP Organizational … [cited by applicant]
Ericsson, “Tdoc R2-2000125: Open issues at fallback to source cell at DAPS handover,” 3GPP TSG-RAN WG2 #109, Electronic Meeting, Feb. 24-Mar. 6, 2020, 8 pages. [cited by applicant]
Ericsson, “Tdoc R2-2000126: Daps handover without key change,” 3GPP TSG-RAN WG2 #109, Electronic Meeting, Feb. 24-Mar. 6, 2020, 9 pages. [cited by applicant]
Huawei, et al., “R2-1915351: Draft CR for 38.323 on supporting DAPS handover,” 3GPP TSG-RAN2 Meeting #108, Nov. 18-22, 2019, Reno, Nevada, 16 pages. [cited by applicant]
Huawei, et al., “R2-2001646: Running CR for 38.323 on supporting DAPS handover,” 3GPP TSG-RAN2 Meeting #109-e, Electronic Meeting, Feb. 24-Mar. 6, 2020, 12 pages. [cited by applicant]
Intel, “R2-2000461: Report of [108#66][LTE NR Mob] Open issues for LTE and NR mobility,” 3GPP TSG-RAN WG2 Meeting #109, Electronic Meeting, Feb. 24-Mar. 6, 2020, 100 pages. [cited by applicant]
Intel Corporation, “R2-2001271: Rrc running CR for introduction of NR mobility enhancement [108#34], ” 3GPP TSG-RAN WG2 Meeting #109, Electronic Meeting, Feb. 24-Mar. 6, 2020, 522 pages. [cited by applicant]
LG Electronics Inc., “R2-2001506: Handling of DAPS HO failure,” 3GPP TSG-RAN WG2 #109-e, Feb. 24-Mar. 6, 2020, Online, 4 pages. [cited by applicant]
MediaTek Inc., et al., “R2-1912966: Report of email discussion: [107#44][LTE and NR /feMOB] Discussion on PDCP details for RUDI HO,” 3GPP TSG-RAN WG2 #107bis, Oct. 14-18, 2019, Chongqing, China, 40 pages. [cited by applicant]
OPPO, “R2-1915154: SRB handling for DAPS handover,” 3GPP TSG-RAN WG2 Meeting #108, Nov. 18-22, 2019, Reno, Nevada, 4 pages. [cited by applicant]
International Search Report and Written Opinion for International Patent Application No. PCT/SE2021/050117, mailed May 7, 2021, 16 pages. [cited by applicant]
International Preliminary Report on Patentability for International Patent Application No. PCT/SE2021/050117, mailed May 23, 2022, 25 pages. [cited by applicant]
Huawei, et al., “R2-1915350: Draft CR for 36.323 on supporting DAPS handover,” 3GPP TSG-RAN2 Meeting #108, Reno, Nevada, Nov. 18-22, 2019, 22 pages. [cited by applicant]
Intel Corporation, “R2-1914840: DAPS failure handling,” 3GPP TSG RAN WG2 Meeting #108, Nov. 18-22, 2019, Reno, Nevada, 4 pages. [cited by applicant]
LG Electronics Inc., “R2-1915909: When to apply the target network configurations,” 3GPP TSG-RAN WG2 Meeting #108, Nov. 18-22, 2019, Reno, Nevada, 2 pages. [cited by applicant]
NEC, “R2-1915351: Remaining issues on the PDCP anchor relocation for DPAS based handover,” 3GPP TSG-RAN WG2 #108, Nov. 18-22, 2019, Reno, Nevada, 3 pages. [cited by applicant]
ZTE, “R2-1904255: Report of [105#57][LTE/feMOB] UE and network side impacts of single/dual protocol stacks,” 3GPP TSG RAN WG2 Meeting #105bis, Apr. 8-12, 2019, Xi'an, China, 34 pages. [cited by applicant]
First Office Action for Chinese Patent Application No. 202180009601.7, mailed Oct. 19, 2023, 10 pages. [cited by applicant]
Intention to Grant for European Patent Application No. 21707418.6, mailed Jun. 23, 2023, 8 pages. [cited by applicant]
Notice of Reasons for Refusal for Japanese Patent Application No. 2022-548527, mailed Oct. 19, 2023, 9 pages. [cited by applicant]