IP Library › Granted Patent US 12,395,983
Granted Patent B2
US 12,395,983 · App. 17/673,471 · Granted Aug 19, 2025

Uplink transmission resource determining method and apparatus

Inventors: Xiaomeng Chai (Shanghai, CN); Yiqun Wu (Shanghai, CN); Yi Wang (Shanghai, CN)
Assignee: Huawei Technologies Co., Ltd.
H04W72/1268H04W74/0833
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,395,983
App. No.
17/673,471
Granted
Aug 19, 2025
Kind
B2
Abstract

An uplink transmission resource determining method includes: receiving first system information sent by a network device, where the first system information includes a first physical uplink shared channel (PUSCH) resource configuration; determining whether a preset condition is met; receiving second system information sent by the network device when the preset condition is not met, where the second system information includes a second PUSCH resource configuration; and determining, based on the second PUSCH resource configuration, a parameter used for uplink transmission. In this way, a terminal may flexibly select the PUSCH resource configuration in the first system information or the PUSCH resource configuration in the second system information based on a requirement of the terminal. The second system information is received only when the preset condition is not met, to reduce information obtained by the terminal and reduce power consumption of the terminal.

Claims (56)

1. An uplink transmission resource determining method, comprising:

receiving, by a terminal, a first physical uplink shared channel (PUSCH) resource configuration from a network device, wherein the first PUSCH resource configuration corresponds to a first bandwidth part (BWP), wherein the first PUSCH resource configuration is for configuring one or more first PUSCH resources, wherein the first PUSCH resource configuration comprises a first value of a first parameter and at least one value of at least one second parameter, and wherein the first parameter is a physical random access channel (PRACH) parameter and the at least one second parameter comprises at least one PUSCH parameter;

receiving, by the terminal, a second PUSCH resource configuration from the network device, wherein the second PUSCH resource configuration corresponds to a second BWP, wherein the second PUSCH resource configuration is for configuring one or more second PUSCH resources, and wherein the second PUSCH resource configuration comprises a second value of the PRACH parameter and does not comprise any value of the at least one PUSCH parameter;

determining, by the terminal, the one or more second PUSCH resources based on the second value of the PRACH parameter of the second PUSCH resource configuration and the at least one value of the at least one PUSCH parameter of the first PUSCH resource configuration; and

performing, by the terminal, an uplink transmission using the determined one or more second PUSCH resources;

wherein the at least one second parameter comprises a modulation and coding scheme (MCS) configuration indicating a configuration of modulation and a code rate for the first PUSCH resource configuration.

2. The method according to claim 1 , wherein the first parameter is usable to determine a mapping relationship between a PRACH transmission occasion and a synchronization signal block (SSB).

3. The method according to claim 1 , wherein the at least one second parameter further comprises the following parameters:

a PUSCH time domain resource configuration;

a PUSCH frequency domain resource configuration;

a power control configuration; and

a reference signal configuration.

4. The method according to claim 1 , wherein the at least one second parameter further comprises:

a PUSCH time domain resource configuration.

5. The method according to claim 1 , wherein the at least one second parameter further comprises:

a PUSCH frequency domain resource configuration.

6. The method according to claim 1 , wherein the at least one second parameter further comprises:

a power control configuration.

7. The method according to claim 1 , wherein the at least one second parameter further comprises:

a reference signal configuration.

8. An uplink transmission resource determining method, comprising:

sending, by a network device, a first physical uplink shared channel (PUSCH) resource configuration to a terminal, wherein the first PUSCH resource configuration corresponds to a first bandwidth part (BWP), wherein the first PUSCH resource configuration is for configuring one or more first PUSCH resources, wherein the first PUSCH resource configuration comprises a first value of a first parameter and at least one value of at least one second parameter, and wherein the first parameter is a physical random access channel (PRACH) parameter and the at least one second parameter comprises at least one PUSCH parameter; and

sending, by the network device, a second PUSCH resource configuration to the terminal, wherein the second PUSCH resource configuration corresponds to a second BWP, wherein the second PUSCH resource configuration is for configuring one or more second PUSCH resources, and wherein the second PUSCH resource configuration comprises a second value of the PRACH parameter and does not comprise any value of the at least one PUSCH parameter;

wherein the at least one second parameter comprises a PUSCH time domain resource configuration indicating one or more of: a time domain start position, a time domain end position, a time domain length, a quantity of PUSCH transmission occasions (POs), or a PO time domain guard period.

9. The method according to claim 8 , wherein the first parameter is usable to determine a mapping relationship between a PRACH transmission occasion and a synchronization signal block (SSB).

10. The method according to claim 8 , wherein the at least one second parameter further comprises the following parameters:

a modulation and coding scheme configuration;

a PUSCH frequency domain resource configuration;

a power control configuration; and

a reference signal configuration.

11. The method according to claim 8 , wherein the at least one second parameter further comprises:

a modulation and coding scheme configuration.

12. The method according to claim 8 , wherein the at least one second parameter further comprises:

a PUSCH frequency domain resource configuration.

13. The method according to claim 8 wherein the at least one second parameter further comprises:

a power control configuration.

14. The method according to claim 8 , wherein the at least one second parameter further comprises:

a reference signal configuration.

15. A non-transitory computer-readable storage medium having processor-executable instructions stored thereon, wherein the processor-executable instructions, when executed, facilitate:

receiving, by a terminal, a first physical uplink shared channel (PUSCH) resource configuration from a network device, wherein the first PUSCH resource configuration corresponds to a first bandwidth part (BWP), wherein the first PUSCH resource configuration is for configuring one or more first PUSCH resources, wherein the first PUSCH resource configuration comprises a first value of a first parameter and at least one value of at least one second parameter, and wherein the first parameter is a physical random access channel (PRACH) parameter and the at least one second parameter comprises at least one PUSCH parameter;

receiving, by the terminal, a second PUSCH resource configuration from the network device, wherein the second PUSCH resource configuration corresponds to a second BWP, wherein the second PUSCH resource configuration is for configuring one or more second PUSCH resources, and wherein the second PUSCH resource configuration comprises a second value of the PRACH parameter and does not comprise any value of the at least one PUSCH parameter;

determining, by the terminal, the one or more second PUSCH resources based on the second value of the PRACH parameter of the second PUSCH resource configuration and the at least one value of the at least one second parameter of the first PUSCH resource configuration; and

performing, by the terminal, an uplink transmission using the determined one or more second PUSCH resources;

wherein the at least one second parameter comprises a PUSCH frequency domain resource configuration indicating one or more of: a frequency domain start position, a frequency domain end position, a frequency domain length, a quantity of PUSCH transmission occasions (POs), or a PO frequency domain guard period.

16. The non-transitory computer-readable storage medium according to claim 15 , wherein the first parameter is usable to determine a mapping relationship between a PRACH transmission occasion and a synchronization signal block (SSB).

17. The non-transitory computer-readable storage medium according to claim 15 , wherein the at least one second parameter further comprises the following parameters:

a modulation and coding scheme configuration;

a PUSCH time domain resource configuration;

a power control configuration; and

a reference signal configuration.

18. The non-transitory computer-readable storage medium according to claim 15 , wherein the at least one second parameter further comprises:

a modulation and coding scheme configuration.

19. The non-transitory computer-readable storage medium according to claim 15 , wherein the at least one second parameter further comprises:

a PUSCH time domain resource configuration.

20. The non-transitory computer-readable storage medium according to claim 15 , wherein the at least one second parameter further comprises:

a power control configuration.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 21, 2025
From: CHAI, XIAOMENG; WU, YIQUN; WANG, YI
To: HUAWEI TECHNOLOGIES CO., LTD.
Reel/Frame 071185/0268 →
Priority Claims (1)
WO PCT/CN2019/101154 · Aug 16, 2019 · international
Continuity (2)
Continuation PCTCN2019111543 · Oct 16, 2019
Related Publication 20220174703A1 · Jun 2, 2022
References Cited (19)
US 20190069218A1 · Ribeiro et al. · 2019 [cited by applicant]
US 20190149365A1 · Chatterjee et al. · 2019 [cited by applicant]
US 20190208550A1 · Ko · 2019 [cited by examiner]
US 20190261337A1 · Park · 2019 [cited by examiner]
CN 101252787A · 2008 [cited by examiner]
CN 102196496A · 2011 [cited by applicant]
CN 104041165A · 2014 [cited by applicant]
CN 104798400A · 2015 [cited by applicant]
CN 106856628A · 2017 [cited by applicant]
CN 109040976A · 2018 [cited by examiner]
CN 110035536A · 2019 [cited by examiner]
WO WO2014113925A1 · 2014 [cited by examiner]
WO WO2015109544A1 · 2015 [cited by examiner]
LG Electronics Inc., “General 2-Step RACH procedure,” 3GPP TSG-RAN WG1 Meeting #106, Reno, USA, R2-1906555, XP051730016, Total 3 pages, 3rd Generation Partnership Project, Valbonne, France (May 13-17, 2019). [cited by applicant]
Interdigital Inc., “On PUSCH Transmission in msgA,” 3GPP TSG RAN WG1 Meeting #96b, Xi'an, China, R1-1904848, XP051699995, Total 6 pages, 3rd Generation Partnership Project, Valbonne, France (Apr. 8-12, 2019). [cited by applicant]
“3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Physical layer procedures for data (Release 15),” 3GPP TS 38.214, V15.6.0, XP051754328, pp. 1-105, 3rd Generation Partnership … [cited by applicant]
“3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Physical layer procedures for control (Release 15),” 3GPP TS 38.213, V15.6.0, XP051754327, pp. 1-107, 3rd Generation Partnersh… [cited by applicant]
“Feature lead summary#3 on 2 step RACH procedures,” 3GPP TSG RAN WG1 #97, R1-1907900, Reno, USA, pp. 1-59, 3rd Generation Partnership Project, Valbonne, France (May 13-17, 2019). [cited by applicant]
“PUSCH Configurations for MsgA of 2-step RACH,” 3GPP TSG-RAN WG2 Meeting #106, R2-1907047, Reno, USA, Total 3 pages, 3rd Generation Partnership Project, Valbonne, France (May 13-17, 2019). [cited by applicant]