IP Library Granted Patent US 12,401,471
Granted Patent B2
US 12,401,471 · App. 17/900,459 · Granted Aug 26, 2025

Demodulation reference signal bundling in carrier aggregation

Inventors: Jung Hyun Bae (San Diego, CA); Mohammed Karmoose (San Diego, CA)
Assignee: Samsung Electronics Co., Ltd.
H04L5/0048H04W52/325H04W52/34
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,401,471
App. No.
17/900,459
Granted
Aug 26, 2025
Kind
B2
Abstract

Disclosed is a method of transmitting a demodulation reference signal (DMRS) by a user equipment (UE) using carrier aggregation, including transmitting, over a first component carrier (CC), a first transmission using a first power and a second transmission using a third power; and transmitting, over a second CC and simultaneously with the first transmission and the second transmission over the first CC, a first transmission using a second power and a second transmission using a fourth power, wherein a sum transmission power across the first and second CCs is maintained during an entire DMRS bundling duration.

Claims (43)

1. A method performed by a user equipment (UE) using carrier aggregation, the method comprising:

transmitting, over a first component carrier (CC), a first transmission using a first power and a second transmission using a third power; and

transmitting, over a second CC and simultaneously with the first transmission and the second transmission over the first CC, a first transmission using a second power and a second transmission using a fourth power,

wherein the first power is different from the third power and the second power is different from the fourth power, and

wherein a sum transmission power across the first and second CCs is maintained during an entire bundling duration, and

wherein a sum of the first power and the second power is equal to a sum of the third power and the fourth power.

2. A method performed by a user equipment (UE) using carrier aggregation, the method comprising:

transmitting, over a first component carrier (CC), a first transmission and a second transmission; and

transmitting, over a second CC and simultaneously with the first transmission and the second transmission over the first CC, a first transmission, a second transmission, and a third transmission,

wherein a first time frame is disposed in the second CC between a start of both the first transmission on the first CC and the first transmission on the second CC,

wherein the first time frame allows the first transmission on the second CC to start at a different time than when the first transmission on the first CC starts, and

wherein a second time frame is disposed in the second CC, the second time frame being an offset disposed directly before a start of the first time frame and providing additional time for the UE to process the scheduling information and determine power levels in each transmission on the second CC.

3. The method of claim 2 ,

wherein a gap is disposed between a start of the first transmission in the first CC and the first transmission in the second CC.

4. The method of claim 3 ,

wherein at least one transmission in the second CC overlaps with at least one transmission in the first CC.

5. The method of claim 4 ,

wherein the third transmission on the second CC is performed during the second transmission on the first CC.

6. The method of claim 5 ,

wherein the gap comprises an interrupted uplink transmission on the first CC and has a duration that is less than a predetermined value.

7. The method of claim 2 ,

wherein a power level used in the first transmission on the first CC and a power level used in the first transmission on the second CC are determined such that a sum transmission power across the first and second CCs is maintained during an entire bundling duration.

8. The method of claim 2 ,

wherein, when a bundling duration is configured in one of the first CC or the second CC, uplink transmissions in any CC which affect phase continuity and power consistency requirements associated with bundling are omitted from a configuration of the UE.

9. A new radio user equipment (NR UE), comprising:

at least one processor; and

at least one memory operatively connected with the at least one processor, the at least one memory storing instructions, which when executed, instruct the at least one processor to perform a bundling, the bundling comprising:

a first component carrier (CC) in which a first transmission and a second transmission are performed;

a second CC in which a first transmission, a second transmission, and a third transmission are performed simultaneously with the first transmission and the second transmission on the first CC;

a first time frame in the second CC, the first time frame being disposed between a start of both the first transmission on the first CC and the first transmission on the second CC, wherein the first time frame allows the first transmission on the second CC to start at a different time than when the first transmission on the first CC starts; and

a second time frame occurring in the second CC, the second time frame being an offset disposed directly before a start of the first time frame and providing additional time for the UE to process scheduling information and determine power levels in each transmission on the second CC.

10. The NR UE of claim 9 , further comprising:

a gap disposed between a start of the first transmission on the first CC and the first transmission on the second CC.

11. The NR UE of claim 10 ,

wherein at least one transmission on the second CC overlaps with at least one transmission on the first CC.

12. The NR UE of claim 11 ,

wherein the third transmission on the second CC is performed during the second transmission on the first CC.

13. The NR UE of claim 12 ,

wherein the gap comprises interrupted uplink transmission on the first CC and has a duration that is less than a predetermined value.

14. The NR UE of claim 9 ,

wherein a power level used in the first transmission on the first CC and a power level used in the first transmission on the second CC are determined such that a sum transmission power across the first and second CCs is maintained during an entirety of the bundling.

15. The NR UE of claim 9 ,

wherein, when a bundling duration is configured in one of the first CC or the second CC, uplink transmissions in any CC which affect phase continuity and power consistency requirements associated with the bundling are omitted from configuration of the NR UE.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 7, 2022
From: BAE, JUNG HYUN; KARMOOSE, MOHAMMED
To: SAMSUNG ELECTRONICS CO., LTD.
Reel/Frame 061014/0298 →
Continuity (3)
Provisional Application 63280609 · Nov 17, 2021
Provisional Application 63246116 · Sep 20, 2021
Related Publication 20230092533A1 · Mar 23, 2023
References Cited (12)
US 9609647B2 · You et al. · 2017 [cited by applicant]
US 10841945B2 · Lee et al. · 2020 [cited by applicant]
US 11310088B2 · Ly et al. · 2022 [cited by applicant]
US 20150036605A1 · Kim · 2015 [cited by examiner]
US 20180213489A1 · Andou · 2018 [cited by examiner]
US 20210068143A1 · Lee et al. · 2021 [cited by applicant]
US 20220104138A1 · Park et al. · 2022 [cited by applicant]
US 20230269675A1 · Laszkiewicz · 2023 [cited by examiner]
Panasonic (R1-2107832, “Discussion on joint channel estimation for PUSCH”, Aug. 16-27, 2021) (Year: 2021). [cited by examiner]
ZTE corporation (R1-2106741, “Discussion on Joint channel estimation for PUSCH”, Aug. 16-27, 2021). (Year: 2021). [cited by examiner]
Lenovo (R1-2107192, Aug. 16-27, 2021, “Enhancements for joint channel estimation for multiple PUSCH”) (Year: 2021). [cited by examiner]
Huawei (R1-1706999, UL power control for short TTI, May 15-19, 2017 (Year: 2017). [cited by examiner]