IP Library › Granted Patent US 12,418,931
Granted Patent B2
US 12,418,931 · App. 17/996,690 · Granted Sep 16, 2025

Dynamic slot management of radio frames

Inventors: Zhuoqi Xu (Shanghai, CN); Yuankun Zhu (Shanghai, CN); Pan Jiang (Shanghai, CN)
H04W72/535H04W72/1263
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,418,931
App. No.
17/996,690
Granted
Sep 16, 2025
Kind
B2
Abstract

Certain aspects of the present disclosure provide techniques for dynamic slot management for radio frames. A method that may be performed by abase station (BS) includes determining a physical resource block (PRB) utilization of each active slot of a plurality of active slots over a first monitoring period of time. The method also includes calculating, based on the PRB utilization of each of the plurality of active slots, a PRB average utilization value over the first monitoring period of time. The method further includes determining whether the PRB average utilization value satisfies a first PRB threshold value. The method also includes in response to determining that the PRB average utilization value fails to satisfy the first PRB threshold value, deactivating a set of active slots of the plurality of active slots resulting in a modified plurality of active slots over the first monitoring period of time.

Claims (50)

1. A method for wireless communication by a base station, comprising:

determining a physical resource block (PRB) utilization of each active slot of a plurality of active slots over a first monitoring period of time, wherein the PRB utilization of a given slot comprises a number of PRBs used for communication in the given slot divided by a total number of PRBs available in the given slot;

calculating, based on the PRB utilization of each of the plurality of active slots, a PRB average utilization value over the first monitoring period of time;

determining whether the PRB average utilization value satisfies a first PRB threshold value; and

in response to determining that the PRB average utilization value fails to satisfy the first PRB threshold value, deactivating a set of active slots of the plurality of active slots resulting in a modified plurality of active slots over the first monitoring period of time, wherein the PRB utilization of each active slot of the set of active slots fails to satisfy a PRB slot threshold value.

2. The method of claim 1 , further comprising:

in response to determining that the PRB average utilization value fails to satisfy the first PRB threshold value, transmitting one or more scheduling grants to one or more user equipments (UEs) for only the modified plurality of active slots over the first monitoring period.

3. The method of claim 1 , further comprising:

in response to determining that the PRB average utilization value satisfies the first PRB threshold value, transmitting one or more scheduling grants to one or more user equipments (UEs) for the plurality of active slots over the first monitoring period.

4. The method of claim 1 , wherein deactivating the set of active slots of the plurality of active slots comprises:

determining the set of active slots based on the PRB utilization of each active slot of the plurality of active slots, a sequential order of the plurality of active slots, and the PRB slot threshold value.

5. The method of claim 4 , wherein the set of active slots are determined as one or more of the plurality of active slots in sequential order that fail to satisfy the PRB slot threshold value.

6. The method of claim 1 , further comprising:

determining whether a second PRB average utilization value based on PRB utilization values of the modified plurality of active slots over a second monitoring period of time satisfies a second PRB threshold value; and

in response to determining that the second PRB average utilization value satisfies the second PRB threshold value, activating one or more of the deactivated set of active slots resulting in a second modified plurality of active slots.

7. The method of claim 6 , wherein the first PRB threshold value is different than the second PRB threshold value.

8. The method of claim 6 , wherein the first monitoring period of time is greater than the second monitoring period of time.

9. The method of claim 1 , wherein the PRB average utilization value comprises an average of the PRB utilization of each of the plurality of active slots.

10. The method of claim 1 , wherein an active slot is used for communication, and wherein a deactivated slot is not used for communication.

11. A base station (BS) comprising:

memory; and

one or more processors coupled to the memory, wherein the one or more processors are configured, individually or collectively, to:

determine a physical resource block (PRB) utilization of each active slot of a plurality of active slots over a first monitoring period of time, wherein the PRB utilization of a given slot comprises a number of PRBs used for communication in the given slot divided by a total number of PRBs available in the given slot;

calculate, based on the PRB utilization of each of the plurality of active slots, a PRB average utilization value over the first monitoring period of time;

determine whether the PRB average utilization value satisfies a first PRB threshold value; and

in response to determining that the PRB average utilization value fails to satisfy the first PRB threshold value, deactivate a set of active slots of the plurality of active slots resulting in a modified plurality of active slots over the first monitoring period of time, wherein the PRB utilization of each active slot of the set of active slots fails to satisfy a PRB slot threshold value.

12. The BS of claim 11 , wherein the one or more processors are configured, individually or collectively, to:

in response to determining that the PRB average utilization value fails to satisfy the first PRB threshold value, transmitting one or more scheduling grants to one or more user equipments (UEs) for only the modified plurality of active slots over the first monitoring period.

13. The BS of claim 11 , wherein the one or more processors are configured, individually or collectively, to:

in response to determining that the PRB average utilization value satisfies the first PRB threshold value, transmitting one or more scheduling grants to one or more user equipments (UEs) for the plurality of active slots over the first monitoring period.

14. A base station (BS) comprising:

memory; and

one or more processors coupled to the memory, wherein the one or more processors are configured, individually or collectively, to:

determine a physical resource block (PRB) utilization of each active slot of a plurality of active slots over a first monitoring period of time;

calculate, based on the PRB utilization of each of the plurality of active slots, a PRB average utilization value over the first monitoring period of time;

determine whether the PRB average utilization value satisfies a first PRB threshold value; and

in response to determining that the PRB average utilization value fails to satisfy the first PRB threshold value, deactivate a set of active slots of the plurality of active slots resulting in a modified plurality of active slots over the first monitoring period of time and transmit one or more scheduling grants to one or more user equipments (UEs) for only the modified plurality of active slots over the first monitoring period, wherein the PRB utilization of each active slot of the set of active slots fails to satisfy a PRB slot threshold value.

15. The BS of claim 14 , wherein the PRB utilization of a given slot comprises a number of PRBs used for communication in the given slot divided by a total number of PRBs available in the given slot.

16. The BS of claim 14 , wherein the one or more processors are configured, individually or collectively, to:

in response to determining that the PRB average utilization value satisfies the first PRB threshold value, transmit one or more scheduling grants to one or more user equipments (UEs) for the plurality of active slots over the first monitoring period.

17. A method for wireless communication by a base station, comprising:

determining a physical resource block (PRB) utilization of each active slot of a plurality of active slots over a first monitoring period of time;

calculating, based on the PRB utilization of each of the plurality of active slots, a PRB average utilization value over the first monitoring period of time;

determining whether the PRB average utilization value satisfies a first PRB threshold value; and

in response to determining that the PRB average utilization value fails to satisfy the first PRB threshold value, deactivating a set of active slots of the plurality of active slots resulting in a modified plurality of active slots over the first monitoring period of time and transmitting one or more scheduling grants to one or more user equipments (UEs) for only the modified plurality of active slots over the first monitoring period, wherein the PRB utilization of each active slot of the set of active slots fails to satisfy a PRB slot threshold value.

18. The method of claim 17 , wherein the PRB utilization of a given slot comprises a number of PRBs used for communication in the given slot divided by a total number of PRBs available in the given slot.

19. The method of claim 17 , further comprising:

in response to determining that the PRB average utilization value satisfies the first PRB threshold value, transmitting one or more scheduling grants to one or more user equipments (UEs) for the plurality of active slots over the first monitoring period.

20. The method of claim 17 , wherein deactivating the set of active slots of the plurality of active slots comprises:

determining the set of active slots based on the PRB utilization of each active slot of the plurality of active slots, a sequential order of the plurality of active slots, and the PRB slot threshold value.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 20, 2022
From: XU, ZHUOQI; ZHU, YUANKUN; JIANG, PAN
To: QUALCOMM INCORPORATED
Reel/Frame 061483/0251 →
Continuity (1)
Related Publication 20230224940A1 · Jul 13, 2023
References Cited (10)
US 11202292B1 · Parihar · 2021 [cited by examiner]
US 20120054258A1 · Li et al. · 2012 [cited by applicant]
US 20150319705A1 · Yoon · 2015 [cited by examiner]
US 20150365889A1 · Rajendran · 2015 [cited by examiner]
US 20240397507A1 · Chakraborty · 2024 [cited by examiner]
CN 106888480A · 2017 [cited by applicant]
Ericsson: “pCR on TR 32.860-020 on Problems Modifying D-MLB Decision by NM,” 3GPP TSG SA WG5 (Telecom Management) Meeting #94, S5-140620, Mar. 24-28, 2014 (Mar. 28, 2014), 5 pages, the whole document. [cited by applicant]
International Search Report and Written Opinion—PCT/CN2020/094501—ISA/EPO—Mar. 3, 2021. [cited by applicant]
Nokia, et al., “CQI Reporting Mode Enhancements for URLLC,” 3GPP TSG-RAN WG1 Meeting #94, R1-1808575, Aug. 20-24, 2018 (Aug. 24, 2018), 5 pages, the whole document. [cited by applicant]
Nokia, et al., “On UCI Enhancements for URLLC,” 3GPP TSG RAN WG1 Meeting #95, R1-1813114, Nov. 12-16, 2018, (Nov. 16, 2018), 10 pages, the whole document. [cited by applicant]