IP Library Granted Patent US 12,427,555
Granted Patent B2
US 12,427,555 · App. 18/221,862 · Granted Sep 30, 2025

Lateral collection grid for landfill gas and method

Inventors: Delaney Lewis (Downsville, LA); Jose Urrutia (Suwanee, GA)
Assignee: Watershed Geosynthetics LLC
B09B1/006
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,427,555
App. No.
18/221,862
Granted
Sep 30, 2025
Kind
B2
Abstract

A gas collection grid for use at landfills having a gas-producing waste pile, including a lower geocomposite positioned over the gas-producing waste pile, a protective layer of soil is positioned over the lower geocomposite. An upper geocomposite is positioned over the protective layer of soil such that the protective layer of soil is positioned between the lower and upper geocomposites. An impermeable geomembrane is positioned over the upper geocomposite. A cruciform gas collector conduit grid is positioned within or atop the protective layer of soil and has a plurality of collection orifices formed adjacent the vertical openings formed in the protective layer of soil. The impermeable geomembrane is non-perforated adjacent the collection orifices and the cruciform gas collector conduit grid is adapted for delivering collected gas laterally from beneath the geomembrane rather than vertically through the geomembrane.

Claims (30)

1. A gas collection system for use at landfills and the like of the type having a gas-producing waste pile, the gas collection grid comprising:

a protective layer of soil positioned over the waste pile, with a grid pattern of vertical openings formed in the protective layer of soil and spaced apart from one another;

an impermeable geomembrane; and

a gas collector conduit grid extending laterally beneath the impermeable membrane and positioned within or atop the protective layer of soil and having a plurality of collection orifices formed adjacent the vertical openings formed in the protective layer of soil, and wherein the impermeable geomembrane is non-perforated adjacent the collection orifices and the gas collector conduit grid is adapted for delivering collected gas laterally from beneath the geomembrane rather than vertically through the geomembrane.

2. A gas collection system as claimed in claim 1 further comprising shallow gas wells positioned at spaced apart points on the grid, the shallow gas wells comprising:

a non-perforated outer pipe extending generally toward the geomembrane;

a perforated inner pipe positioned within and extending within the non-perforated outer pipe and together with the non-perforated outer pipe defining a space between the two pipes;

a quantity of gravel-like material positioned within the space between the perforated inner pipe and the non-perforated outer pipe; and

a transport conduit extending beneath the geomembrane and not extending through the membrane for transporting gas produced by the waste pile and collected through the gravel-like material and into and through the perforated inner pipe of the shallow gas well collector.

3. A gas collection system as claimed in claim 1 further comprising a lower geocomposite positioned over the gas-producing waste pile and an upper geocomposite positioned over the protective layer of soil such that the protective layer of soil is positioned between the lower and upper geocomposites.

4. A gas collection system as claimed in claim 1 further comprising an upper layer of soil positioned between the gas collector conduit grid and the impermeable membrane.

5. A gas collection system as claimed in claim 1 wherein the gas collector conduit grid is cruciform in general arrangement.

6. A gas collection system for use at landfills and the like of the type having a gas-producing waste pile, the gas collection grid comprising:

a lower geocomposite positioned over the gas-producing waste pile;

a protective layer of soil positioned over the lower geocomposite, with a grid pattern of vertical openings formed in the protective layer of soil spaced apart from one another;

an upper geocomposite positioned over the protective layer of soil such that the protective layer of soil is positioned between the lower and upper geocomposites;

an impermeable geomembrane positioned over the upper geocomposite; and

a cruciform gas collector conduit grid extending laterally beneath the impermeable membrane and positioned within or atop the protective layer of soil and having a plurality of collection orifices formed adjacent the vertical openings formed in the protective layer of soil, and wherein the impermeable geomembrane is non-perforated adjacent the collection orifices and the cruciform gas collector conduit grid is adapted for delivering collected gas laterally from beneath the geomembrane rather than vertically through the geomembrane.

7. A collection grid as claimed in claim 1 wherein shallow gas wells are positioned at spaced apart points on the grid, the shallow gas wells comprising:

a non-perforated outer pipe extending generally from the lower geocomposite toward the upper geocomposite;

a perforated inner pipe positioned within and extending within the non-perforated outer pipe and together with the non-perforated outer pipe defining a space between the two pipes;

a quantity of gravel-like material positioned within the space between the perforated inner pipe and the non-perforated outer pipe; and

a transport conduit extending beneath the geomembrane and not extending through the membrane for transporting gas produced by the waste pile and collected through the gravel-like material and into and through the perforated inner pipe of the shallow gas well collector.

8. A method of installing a gas collection grid for use at landfills and the like of the type having a gas-producing waste pile, the method comprising the steps of:

covering the waste pile with a protective layer of soil;

creating vertical openings in the protective layer of soil spaced apart from one another in a grid pattern;

creating a cruciform grid of gas collector conduits having a series of gas collection orifices space apart from one another to generally match the spacing of the grid pattern of vertical openings in the protective soil layer and positioning the grid of gas collector conduits such that the orifices generally are aligned with the vertical openings in the protective soil layer;

covering the grid of gas collector conduits with an upper layer of soil;

placing a gas-impermeable membrane over the upper layer of soil; and

connecting the grid of gas collector conduits with an external gas extraction apparatus.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 24, 2025
From: LEWIS, DELANEY, MR.; URRUTIA, JOSE, MR.
To: WATERSHED GEOSYNTHETICS LLC
Reel/Frame 072671/0877 →
Continuity (2)
Provisional Application 63389344 · Jul 14, 2022
Related Publication 20240017308A1 · Jan 18, 2024
References Cited (31)
US 994155A · Harris · 1911 [cited by applicant]
US 3563038A · Healy et al. · 1971 [cited by applicant]
US 4057500A · Wager · 1977 [cited by applicant]
US 4317452A · Russo et al. · 1982 [cited by applicant]
US 4442901A · Zison · 1984 [cited by applicant]
US 4596491A · Dietzler · 1986 [cited by applicant]
US 4670148A · Schneider · 1987 [cited by examiner]
US 5857807A · Longo, Sr. · 1999 [cited by examiner]
US 6280117B1 · Obermeyer et al. · 2001 [cited by applicant]
US 8292543B2 · Hater · 2012 [cited by examiner]
US 8313921B2 · Kraemer · 2012 [cited by examiner]
US 8777515B1 · Donlin · 2014 [cited by applicant]
US 8926221B2 · Hwang · 2015 [cited by examiner]
US 10697145B2 · Lewis · 2020 [cited by applicant]
US 11633767B2 · Shana'a · 2023 [cited by examiner]
US 20040062610A1 · Hater et al. · 2004 [cited by applicant]
US 20050201831A1 · Lee · 2005 [cited by examiner]
US 20050269253A1 · Potts · 2005 [cited by applicant]
US 20060034664A1 · Augenstein et al. · 2006 [cited by applicant]
US 20110045580A1 · Hater · 2011 [cited by examiner]
CA 2154239 · 1997 [cited by applicant]
CN 112063498 · 2020 [cited by applicant]
DE 19703826 · 1998 [cited by applicant]
EP 0075993 · 1983 [cited by applicant]
RU 2730310 · 2020 [cited by applicant]
International Search Report and Written Opinion of the International Searching Authority for PCT Application No. PCT/US2018/061094, dated Feb. 20, 2019˜1523. [cited by applicant]
European Search Report, Application No. EP23185685, dated Dec. 21, 2023, 6 pages. [cited by applicant]
Abedi Mohammadmahdi et al., “Smart Geosynthetics and Prospects for Civil Infrastructure Monitoring: A Comprehensive and Critical Review”, Institute for Sustainability and Innovation in Structural Engineering, School of … [cited by applicant]
European Search Report, Application No. EP23185691, dated Jan. 2, 2024, 5 pages. [cited by applicant]
International Search Report & Written Opinion of the International Searching Authority, Application No. PCT/US2023/027709, dated Oct. 13, 2023, 9 pages. [cited by applicant]
International Search Report & Written Opinion of the International Searching Authority, Application No. PCT/US2021/016825, dated Mar. 2, 2021, 10 pages. [cited by applicant]