IP Library Granted Patent US 12,432,773
Granted Patent B2
US 12,432,773 · App. 17/522,362 · Granted Sep 30, 2025

Cell and bandwidth part operations in unlicensed bands

Inventors: Alireza Babaei (Fairfax, VA); Esmael Hejazi Dinan (McLean, VA); Hyoungsuk Jeon (Centreville, VA); Hua Zhou (Herndon, VA); Kyungmin Park (Vienna, VA); Ali Cagatay Cirik (Herndon, VA)
Assignee: Samsung Electronics Co., Ltd.
H04W74/0808H04W74/004
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,432,773
App. No.
17/522,362
Granted
Sep 30, 2025
Kind
B2
Abstract

A wireless device receives one or more messages comprising a parameter indicating a first value of a listen before talk (LBT) counter. The LBT counter is incremented based on an LBT procedure indicating an LBT failure for an uplink transmission via a first bandwidth part. Based on the LBT counter reaching the first value, a switch is made from the first bandwidth part to a second bandwidth part as an active bandwidth part.

Claims (44)

1. A method comprising:

receiving, by a wireless device, a radio resource control (RRC) message comprising configuration parameters associated with a first bandwidth part (BWP) of a cell and a second BWP of the cell, and a first parameter indicating a first value associated with a listen before talk (LBT) counter for the cell;

performing a first LBT procedure for a first uplink transmission via the first BWP;

incrementing the LBT counter based on determination that the first LBT procedure fails; and

switching from the first BWP to a second BWP as an active BWP, based on determination that the LBT counter reaches the first value,

wherein the first value is used to determine after how many consistent uplink LBT failure events the wireless device triggers uplink LBT failure recovery.

2. The method of claim 1 , further comprising transmitting one or more uplink signals via the second BWP based on the switching.

3. The method of claim 1 , further comprising resetting the LBT counter based on a second LBT procedure for a second uplink transmission indicating a clear channel.

4. The method of claim 1 , wherein a value of the LBT counter remains unchanged based on a second LBT procedure for a second uplink transmission indicating a clear channel.

5. The method of claim 1 , wherein the first uplink transmission comprises one or more of:

a sounding reference signal,

a demodulation reference signal,

a phase tracking reference signal,

a physical random access channel signal,

a physical uplink shared channel signal, or

a physical uplink control channel signal.

6. The method of claim 1 , wherein the first uplink transmission is transmission of one or more transport blocks.

7. The method of claim 1 , wherein the first uplink transmission is based on a dynamic grant or a configured grant.

8. The method of claim 1 ,

wherein, the RRC message further comprises a BWP inactivity timer of the cell, and

wherein, the first BWP is switched to a default BWP, based on determination that the BWP inactivity timer of the cell has expired.

9. A wireless device comprising:

one or more processors; and

memory storing instructions that, when executed by the one or more processors, cause the wireless device to:

receive a radio resource control (RRC) message comprising configuration parameters associated with a first bandwidth part (BWP) of a cell and a second BWP of the cell, and a first parameter indicating a first value associated with a listen before talk (LBT) counter for the cell,

perform a first LBT procedure for a first uplink transmission via the first BWP,

increment the LBT counter based on determination that the first LBT procedure fails, and

switch from the first BWP to a second BWP as an active BWP, based on determination that the LBT counter reaches the first value,

wherein the first value is used to determine after how many consistent uplink LBT failure events the wireless device triggers uplink LBT failure recovery.

10. The wireless device of claim 9 , wherein the instructions further cause the wireless device to transmit one or more uplink signals via the second BWP based on the switch.

11. The wireless device of claim 9 , wherein the instructions further cause the wireless device to reset the LBT counter based on a second LBT procedure for a second uplink transmission indicating a clear channel.

12. The wireless device of claim 9 , wherein a value of the LBT counter remains unchanged based on a second LBT procedure for a second uplink transmission indicating a clear channel.

13. The wireless device of claim 9 , wherein the first uplink transmission comprises one or more of:

a sounding reference signal,

a demodulation reference signal,

a phase tracking reference signal,

a physical random access channel signal,

a physical uplink shared channel signal, or

a physical uplink control channel signal.

14. The wireless device of claim 9 , wherein the first uplink transmission is transmission of one or more transport blocks.

15. The wireless device of claim 9 , wherein the first uplink transmission is based on a dynamic grant or a configured grant.

16. The wireless device of claim 9 ,

wherein, the RRC message further comprises a BWP inactivity timer of the cell, and

wherein, the first BWP is switched to a default BWP, based on determination that the BWP inactivity timer of the cell has expired.

Continuity (4)
Continuation 16871640 · May 11, 2020
Continuation PCTUS2019045288 · Aug 6, 2019
Provisional Application 62714923 · Aug 6, 2018
Related Publication 20220070928A1 · Mar 3, 2022
References Cited (56)
US 20160057731A1 · Damnjanovic et al. · 2016 [cited by applicant]
US 20160127098A1 · Ng · 2016 [cited by examiner]
US 20160278048A1 · Nory et al. · 2016 [cited by applicant]
US 20170006599A1 · Dinan · 2017 [cited by examiner]
US 20170006640A1 · Dinan · 2017 [cited by examiner]
US 20170318607A1 · Tiirola et al. · 2017 [cited by applicant]
US 20170359808A1 · Dinan · 2017 [cited by applicant]
US 20180077724A1 · Kim et al. · 2018 [cited by applicant]
US 20180115394A1 · Harada et al. · 2018 [cited by applicant]
US 20180176961A1 · Babaei · 2018 [cited by examiner]
US 20190306867A1 · Cirik et al. · 2019 [cited by applicant]
US 20190319833A1 · Nagaraja et al. · 2019 [cited by applicant]
US 20190349815A1 · Tiirola · 2019 [cited by examiner]
US 20200288494A1 · Heo · 2020 [cited by examiner]
US 20200344819A1 · Myung · 2020 [cited by examiner]
CN 107079494A · 2017 [cited by applicant]
CN 107534908A · 2018 [cited by applicant]
WO 2020069114A1 · 2020 [cited by applicant]
3GPP TS 38.211 V15.2.0 (Jun. 2018); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Physical channels and modulation; (Release 15). [cited by applicant]
3GPP TS 38.212 V15.2.0 (Jun. 2018); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Multiplexing and channel coding; (Release 15). [cited by applicant]
3GPP TS 38.213 V15.2.0 (Jun. 2018); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR;Physical layer procedures for control (Release 15). [cited by applicant]
3GPP TS 38.214 V15.2.0 (Jun. 2018); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR;Physical layer procedures for data (Release 15). [cited by applicant]
3GPP TS 38.300 V15.2.0 (Jun. 2018); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Nr; Nr and NG-RAN Overall Description; Stage 2; (Release 15). [cited by applicant]
3GPP TS 38.321 V15.2.0 (Jun. 2018); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Medium Access Control (MAC) protocol specification; (Release 15). [cited by applicant]
3GPP TS 38.331 V15.2.1 (Jun. 2018); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Radio Resource Control (RRC) protocol specification; (Release 15). [cited by applicant]
R1-1804680 (R15 NR WI AI 765—BWP for NR-U); 3GPP RAN WG1 Meeting #92bis; Sanya, China, Apr. 16-20, 2018; Agenda Item:7.6.5; Source:InterDigital Inc.; Title:BWP operation in unlicensed spectrum ; Document for: Discussion. [cited by applicant]
R1-1805923; 3GPP TSG RAN WG1 Meeting #93; Busan, Korea, May 21-May 25, 2018; Agenda Item:7.6.4.5; Source:Huawei, HiSilicon; Title:BWP operation in NR unlicensed band. [cited by applicant]
R1-1806086; 3GPP TSG RAN WG1 Meeting #93R1-1806086 Busan, Korea, May 21-25, 2018; ; Source:vivo; Title:Discussion on the channel access procedures; Agenda Item:7.6.4.1. [cited by applicant]
R1-1806106_DL Signals and Channels; 3GPP TSG RAN WG1 Meeting #93; Busan, Korea, May 21-25, 2018; ; Agenda item:7.6.3.1; Source:Nokia, Nokia Shanghai Bell; Title:On DL Signals and Channels for NR-U. [cited by applicant]
R1-1806112_NRU WB operation; 3GPP TSG RAN WG1 Meeting #93; Busan, Korea, May 21-25, 2018; ; Agenda item:7.6.4.5; Source:Nokia, Nokia Shanghai Bell; Title:On Wideband Operation for NR-U. [cited by applicant]
R1-1806250 Frame Structure for NR-U; 3GPP TSG-RAN WG1 Meeting #93Tdoc; Busan, Korea, May 21-25, 2018; Agenda Item:7.6.2; Source:Ericsson; Title: Frame structure for NR-U; Document for:Discussion, Decision. [cited by applicant]
R1-1806459 Discussion on frame structure for NR-U; 3GPP TSG RAN WG1 Meeting #93; Busan, Korea, May 21-25, 2018 ; Title: Discussion on frame structure for NR-U; Source: ZTE; Agenda Item:7.6.2; Document for:Discussion and… [cited by applicant]
R1-1806462 Discussion on Channel access mechanism for NR-U; 3GPP TSG RAN WG1 Meeting #93; Busan, Korea, May 21-25, 2018; ; Title: Discussion on channel access mechanism for NR-U; Source: ZTE; Agenda Item:7.6.4.1. [cited by applicant]
R1-1806569 channel access for NR unlicensed operations; 3GPP TSG RAN WG1 Meeting #93; Busan, Korea, May 21-25, 2018; ; Agenda Item:7.6.4.1; Source:Sony; Title:Considerations on channel access for NR unlicensed operation… [cited by applicant]
R1-1806645; 3GPP TSG RAN WG1 Meeting #93; Busan, Korea, May 21-25, 2018; Agenda Item:7.6.4.1; Source: LG Electronics; Title: Channel access procedure for NR unlicensed operation. [cited by applicant]
R1-1806648; 3GPP TSG RAN WG1 Meeting #93; Busan, Korea, May 21-25, 2018; Agenda Item:7.6.4.4; Source: LG Electronics; Title: Discussion on configured grant for NR unlicensed operation;. [cited by applicant]
R1-1806761—Channel access; 3GPP TSG-RAN WG1 Meeting #93; Busan, Korea, May 21-25, 2018; Agenda item:7.6.4.1; Source: Samsung ; Title: Channel access procedures for NR-U; Document for:Discussion and Decision. [cited by applicant]
R1-1806797_NR-U_channel_access_final; 3GPP TSG RAN WG1 Meeting #93; Busan, Korea, May 21-25, 2018; Agenda item:7.6.4.1; Source: MediaTek Inc .; Title: Channel access to NR-based unlicensed spectrum. [cited by applicant]
R1-1806968 (R15 NR WI AI 7645-BWP for NR-U); 3GPP RAN WG1 Meeting #93; Busan, Korea, May 21-25, 2018(Update to R1-1804680); Agenda Item:7.6.4.5; Source:InterDigital Inc.; Title:BWP operation in unlicensed spectrum ; Doc… [cited by applicant]
R1-1807161.DOC3GPP TSG RAN WG1 Meeting #93 R1-1807161 Busan, Korea, May 21-25, 2018; Agenda Item:7.6.4.1; Source:ITRI; Title:Discussion on NR unlicensed band operation; Document for:Discussion and Decision. [cited by applicant]
R1-1807204; 3GPP TSG RAN WG1 Meeting #93; Busan, Korea, May 21-25, 2018 ; Source : CATR; Title : Frame structure design in NR-U; Agenda Item: 7.6.2; Document for: Discussion / Decision. [cited by applicant]
R2-1806836 (R15 NRU SI overview); 3GPP TSG-RAN WG2 Meeting #102; Busan, Korea, May 21-25, 2018 (Resubmission of R2-1804824); Agenda Item:11.2; Source:InterDigital Inc.; Title:Overview of NR-based access to unlicensed sp… [cited by applicant]
R2-1806837 (R15 NRU SI AI 112 scheduling)—InterDigital; 3GPP TSG-RAN WG2 Meeting #102; Busan, Korea, May 21-25, 2018(Revision of R2-1804825); Agenda Item: 11.2; Source: InterDigital Inc.; Title:Scheduling enhancements f… [cited by applicant]
R2-1806886_Report_Email_Discussion_NRU; 3GPP TSG-RAN WG2 Meeting #102; Busan, Korea, May 21-25, 2018; ; Agenda item:11.2 (TBC); Source: Qualcomm Incorporated; Title: Report of Email Discussion [101bis#49][NR] NR unlicen… [cited by applicant]
R2-1806891_Channel_Access_NRU; 3GPP TSG-RAN WG2 Meeting #102; Busan, Korea, May 21-25, 2018 (resubmission of R2-1806038); ; ; Agenda item:11.2; Source: Qualcomm Incorporated. [cited by applicant]
R2-1809610 (R15 NRU SI AI 11.2 Scheduling); 3GPP TSG-RAN WG2 NR AH1807 Meeting; Montreal, Canada, Jul. 2-6, 2018 (Revision of R2-1806837); Agenda Item: 11.2; Source: InterDigital Inc.; Title:Scheduling enhancements for … [cited by applicant]
R2-1809840 considerations on configured grant for NR-UI; 3GPP TSG RAN WG2 NR AH1807 Meeting; Montreal, Canada, Jul. 2-6, 2018; Agenda Item: 11.2; Source: ZTE; Title: Considerations on configured grant for NR-U; Document… [cited by applicant]
R2-1810122 channel access for NR_U_1.0; 3GPP TSG RAN WG2 AH-1807 Meeting; Montreal, Canada, Jul. 2-6, 2018; ; Agenda Item:11.2; Source:Sony; Title:Considerations on channel access, LBT and mobility enhancements for NR u… [cited by applicant]
3GPP TSG RAN WG1 Meeting 91 R1-1720475; Reno, US, Nov. 27-Dec. 2, 2017. [cited by applicant]
3GPP RAN WG1 Meeting #93 R1-1806968; Busan, Korea, May 21-25, 2018 (Update to R1-1804680). [cited by applicant]
3GPP TSG RAN WG2 NR AH1807 Meeting R2-1809841; Montreal, Canada, Jul. 2-6, 2018. [cited by applicant]
ISR PCT/US2019/045288 mailed Jan. 8, 2020. [cited by applicant]
Ericsson, BWP Inactivity Timer and DRX, 3GPP TSG-RAN WG2 #100 Tdoc R2-1713941, Reno, Nevada, USA, Nov. 27-Dec. 1, 2017. [cited by applicant]
European Search Report dated Jul. 20, 2022, issued in European Application No. 22175066.4. [cited by applicant]
Chinese Office Action with English translation dated Sep. 28, 2023; Chinese Appln. No. 2023092802352810. [cited by applicant]
Indian Office Action dated Nov. 24, 2022, issued in Indian Application No. 202117003620. [cited by applicant]