IP Library Granted Patent US 12,436,971
Granted Patent B2
US 12,436,971 · App. 18/597,755 · Granted Oct 7, 2025

Support device and method

Inventors: Miho Kobayashi (Tokyo, JP); Soichi Watanabe (Tokyo, JP); Mitsuo Hayasaka (Tokyo, JP); Shimpei Nomura (Tokyo, JP)
Assignee: HITACHI VANTARA, LTD.
G06F16/27
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,436,971
App. No.
18/597,755
Granted
Oct 7, 2025
Kind
B2
Abstract

A support device and method capable of supporting construction of an optimal secondary usage environment for data are proposed. A plurality of construction candidate plans for a secondary usage environment including a copy method for copying the data between a designated copy source site and a designated copy destination site of the data are calculated. A time and a cost required for copying the data and an operation cost of the secondary usage environment to be constructed are calculated for each of the calculated construction candidate plans, and the plurality of construction candidate plans based on a calculation result together with evaluations thereof are presented.

Claims (35)

1. A support device connected to a plurality of sites each having a server and a storage device, and for supporting construction of a secondary usage environment in which the server uses data stored in the storage device, the support device comprising:

a construction candidate plan calculation unit configured to calculate a plurality of construction candidate plans for the secondary usage environment including a copy method for copying the data between a designated copy source site and a designated copy destination site of the data, wherein each construction candidate plan specifies a different copy method selected from a plurality of available copy methods based on database administrator requirements; and

a construction candidate plan presentation unit configured to calculate, for each of the construction candidate plans calculated by the construction candidate plan calculation unit, a time and a cost required for copying the data and an operation cost of the secondary usage environment to be constructed, and to present the plurality of construction candidate plans based on a calculation result together with evaluations thereof.

2. The support device according to claim 1 , wherein

the evaluation is a priority, and

the plurality of construction candidate plans are presented in a ranking format based on the priority.

3. The support device according to claim 1 , further comprising:

database information on each site and network information between the sites, wherein

the construction candidate plan presentation unit calculates, based on a request related to the database information, the network information, and an operation form of the secondary usage environment, a plurality of construction candidate plans including a time and a cost required for copying the data and an operation cost.

4. The support device according to claim 3 , wherein

the request includes at least one content of which of a performance and a cost is prioritized to construct the secondary usage environment, and whether to operate the secondary usage environment in any of a construction completion time of the secondary usage environment, an operation period of the secondary usage environment, and a usage frequency, and

the copy method includes a method for moving data between sites at the time of copying and a method for setting an access path to data at the time of copying and moving data between sites at the time of an access request.

5. The support device according to claim 4 , wherein

the copy method includes a method that synchronizes with data as the copy source and a method that does not synchronize with the data as the copy source.

6. The support device according to claim 1 , further comprising:

a replication execution unit configured to replicate, when one construction candidate plan is selected from the plurality of construction candidate plans, the data from the copy source site to the copy destination site in a copy method corresponding to the construction candidate plan.

7. The support device according to claim 6 , wherein the replication execution unit outputs information related to a volume for the constructed secondary usage environment.

8. A support method executed by a support device configured to be connected to a plurality of sites each having a server and a storage device, and to support construction of a secondary usage environment in which the server uses data stored in the storage device, the support method comprising:

a first step of calculating a plurality of construction candidate plans for the secondary usage environment including a copy method for copying the data between a designated copy source site and a designated copy destination site of the data, wherein each construction candidate plan specifies a different copy method selected from a plurality of available copy methods based on database administrator requirements; and

a second step of calculating, for each of the calculated construction candidate plans, a time and a cost required for copying the data and an operation cost of the secondary usage environment to be constructed, and to present the plurality of construction candidate plans based on a calculation result together with evaluations thereof.

9. The support method according to claim 8 , wherein

the evaluation is a priority, and

the plurality of construction candidate plans are presented in a ranking format based on the priority.

10. The support method according to claim 8 , wherein

the support device holds database information on each site and network information between the sites, and

in the second step, the support device calculates, based on a request related to the database information, the network information, and an operation form of the secondary usage environment, a plurality of construction candidate plans including a time and a cost required for copying the data and an operation cost.

11. The support method according to claim 10 , wherein

the request includes at least one content of which of a performance and a cost is prioritized to construct the secondary usage environment, and whether to operate the secondary usage environment in any of a construction completion time of the secondary usage environment, an operation period of the secondary usage environment, and a usage frequency, and

the copy method includes a method for moving data between sites at the time of copying and a method for setting an access path to data at the time of copying and moving data between sites at the time of an access request.

12. The support method according to claim 11 , wherein

the copy method includes a method that synchronizes with data as the copy source and a method that does not synchronize with the data as the copy source.

13. The support method according to claim 8 , further comprising:

a third step of replicating, when one construction candidate plan is selected from the plurality of construction candidate plans, the data from the copy source site to the copy destination site in a copy method corresponding to the construction candidate plan.

14. The support method according to claim 13 , wherein

in the third step, the support device outputs information related to a volume for the constructed secondary usage environment.

Assignments (2)
DE-MERGER EFFECTIVE APRIL 1, 2024 Recorded Oct 1, 2024
From: HITACHI, LTD.
To: HITACHI VANTARA, LTD.
Reel/Frame 069083/0345 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 7, 2024
From: KOBAYASHI, MIHO; WATANABE, SOICHI; HAYASAKA, MITSUO; NOMURA, SHIMPEI
To: HITACHI, LTD.
Reel/Frame 066679/0416 →
Priority Claims (1)
JP 2023-129248 · Aug 8, 2023 · national
Continuity (1)
Related Publication 20250053575A1 · Feb 13, 2025
References Cited (7)
US 7152078B2 · Yamagami · 2006 [cited by applicant]
US 20060064466A1 · Shiga et al. · 2006 [cited by applicant]
US 20100205044A1 · Scheer · 2010 [cited by examiner]
US 20170168903A1 · Dornemann · 2017 [cited by examiner]
US 20210157498A1 · Kobayashi et al. · 2021 [cited by applicant]
US 20230058573A1 · Singh · 2023 [cited by examiner]
JP 2006092054A · 2006 [cited by applicant]