IP Library › Granted Patent US 12,439,427
Granted Patent B2
US 12,439,427 · App. 18/857,607 · Granted Oct 7, 2025

PTM retransmission reception by UES in RRC_INACTIVE/idle with DRX

Inventors: Esa Mikael Malkamäki (Espoo, FI); Ugur Baran Elmali (Munich, DE); Subin Narayanan (Oulu, FI); Dariush M. Soleymani (Ulm, DE)
Assignee: Nokia Technologies Oy
H04W72/23H04L1/1848H04W76/27H04W76/28H04W76/40
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,439,427
App. No.
18/857,607
Granted
Oct 7, 2025
Kind
B2
Abstract

Described herein is a User Equipment, UE, comprising: at least one processor, and at least one memory storing instructions that, when executed by the at least one processor, cause the UE at least to, during or before a Multicast/Broadcast Service, MBS, session; receive, from a network node, a configuration message configuring at least one Retransmission Timer; receive, while the UE is in an inactive state or an idle state, a Physical Downlink Control Channel, PDCCH, transmission that is associated with the MBS session and that schedules a Transport Block, TB, of the MBS session with a group identifier identifying a group of UEs comprising the UE in the inactive or idle state and one or more UEs in a connected state; receive the scheduled TB in the inactive or idle state, via Point-To-Multipoint, PTM, Physical Downlink Shared Channel, PDSCH transmission associated with the MBS session; and in case of determining a failure in decoding the received TB; start the at least one Retransmission Timer based on the configuration message; and monitor, before the at least one Retransmission Timer expires, a PDCCH for at least one PTM retransmission for the failed TB requested by the one or more UEs in the connected state via at least one Hybrid Automatic Repeat Request, HARQ, feedback to the network node.

Claims (68)

1. A User Equipment, UE, comprising:

at least one processor, and

at least one memory storing instructions that, when executed by the at least one processor, cause the UE at least to, during or before a Multicast/Broadcast Service, MBS, session:

receive, from a network node, a configuration message configuring at least one Retransmission Timer;

receive, while the UE is in an inactive state or an idle state, a Physical Downlink Control Channel, PDCCH, transmission that is associated with the MBS session and that schedules a Transport Block, TB, of the MBS session with a group identifier identifying a group of UEs comprising the UE in the inactive or idle state and one or more UEs in a connected state;

receive the scheduled TB in the inactive or idle state, via Point-To-Multipoint, PTM, Physical Downlink Shared Channel, PDSCH transmission associated with the MBS session; and

in case of determining a failure in decoding the received TB:

start the at least one Retransmission Timer based on the configuration message; and

monitor, before the at least one Retransmission Timer expires, a PDCCH for at least one PTM retransmission for the failed TB requested by the one or more UEs in the connected state via at least one Hybrid Automatic Repeat Request, HARQ, feedback to the network node.

2. The UE according to claim 1 , wherein the at least one Retransmission Timer comprises a HARQ Round-Trip-Time, RTT, Timer and a Discontinuous Reception, DRX, Retransmission Timer,

wherein the UE, in the inactive or idle state, is configured to:

receive, via the PDCCH transmission, Downlink Control Information, DCI, comprising a timing indicator for indicating a time slot for the at least one HARQ feedback,

start the HARQ RTT Timer after a predetermined symbol in the indicated time slot; and

start the DRX Retransmission Timer after the HARQ RTT Timer expires.

3. The UE according to claim 2 , wherein:

the indicated time slot comprises a plurality of symbols,

the UE is pre-configured with a fixed number indicating a corresponding symbol comprised in the indicated time slot as the predetermined symbol that is default for all MBS sessions.

4. The UE according to claim 2 , wherein:

the indicated time slot comprises a plurality of symbols,

the configuration message further configures the UE with a specific number indicating a corresponding symbol of the indicated time slot as the predetermined symbol for a specific MBS session or default for all MBS sessions.

5. The UE according to claim 2 , wherein the UE is configured to:

extend the configured DRX Retransmission Timer with at least one additional time slot, when the predetermined symbol is the first symbol in the indicated time slot.

6. The UE according to claim 2 , wherein the configuration message comprises information for further configuring the UE with a list of values for interpreting the timing indicator by reference to a value comprised in the list, and wherein the UE is configured to determine the time slot on the basis of the received timing indicator indicating one of the values of the list.

7. The UE according to claim 6 , wherein the timing indicator is a PDSCH-to-HARQ_feedback timing indicator, wherein the list is provided via dl-DataToUL-ACK parameter or dl-DataToUL-ACK-MulticastDCI-Format4-1 parameter or the list comprises values {1, 2, 3, 4, 5, 6, 7, 8}.

8. The UE according to claim 2 , wherein:

the configuration message comprises a full PUCCH configuration for the UE, and

the DCI comprises, in addition to the timing indicator, a PUCCH resource indicator, PRI, indicating the predetermined symbol comprised in the time slot indicated by the timing indicator for sending the at least one HARQ feedback.

9. The UE according to claim 1 , wherein the configuration message is per Temporary Mobile Group Identity, TMGI, or a corresponding identifier identifying a specific multicast service or all multicast services of the group of UEs.

10. The UE according to claim 1 , wherein the UE is configured to, in the inactive or idle state, receive the same PDCCH transmission associated with the MBS session as the one or more UEs in connected state.

11. The UE according to claim 1 , wherein:

the PTM PDSCH transmission for the failed TB comprises a plurality of symbols,

wherein the UE is further caused to, in the inactive or idle state:

start the at least one Retransmission Timer after the last symbol comprised in the PTM PDSCH transmission for the failed TB.

12. The UE according to claim 1 , wherein:

the UE, in the inactive or idle state, is configured to receive, via the PDCCH transmission, Downlink Control Information, DCI, scheduling the failed TB transmission, wherein the DCI comprises information for indicating a time slot in which the HARQ feedback in response to the failed TB is sent by the one or more UEs in the connected state,

wherein the UE is further caused to, in the inactive or idle state:

determine to start the at least one Retransmission Timer in the indicated time slot.

13. The UE according to claim 1 , wherein the configuration message is a Radio Resource Control, RRC, release message or an MBS Control Channel, MCCH message.

14. A network node of a radio access network, configured to establish communication to a group of UEs, the group being identified by a group identifier, the network node comprising:

at least one processor, and

at least one memory storing instructions that, when executed by the at least one processor, cause the network node at least to, during or before a Multicast/Broadcast Service, MBS, session:

transmit a configuration message to at least one of said plurality of UEs for configuring the at least one UE with at least one Retransmission Timer, wherein the at least one UE is in an inactive state or an idle state and at least one UE is in connected state;

schedule, via one or more Physical Downlink Control Channel, PDCCH, transmissions associated with the MBS session, a Transport Block, TB, towards the group of UEs identified by the group identifier;

transmit the scheduled TB, via Point-To-Multipoint, PTM, Physical Downlink Shared Channel, PDSCH associated with the MBS session, to the group of UEs identified by the group identifier;

determine resources for retransmissions for the transmitted TB in response to receiving at least one Hybrid Automatic Repeat Request, HARQ, feedback from the at least one UE in connected state indicating a failure in decoding the TB; and

initiate retransmissions for the failed TB at the determined resources and based on the at least one Retransmission Timer configured for the at least one UE in inactive or idle state,

wherein the configuration message comprises information for the at least one UE in inactive or idle state to determine when to start the at least one Retransmission Timer based on the configuration message.

15. A method of a User Equipment, UE, during or before a Multicast/Broadcast Service, MBS, session:

receiving, from a network node, a configuration message configuring at least one Retransmission Timer;

receiving, while the UE is in an inactive state or an idle state, a Physical Downlink Control Channel, PDCCH, transmission that is associated with the MBS session and that schedules a Transport Block, TB, of the MBS session with a group identifier identifying a group of UEs comprising the UE in the inactive or idle state and one or more UEs in a connected state;

receiving the scheduled TB in the inactive or idle state, via Point-To-Multipoint, PTM, Physical Downlink Shared Channel, PDSCH transmission associated with the MBS session; and

in case of determining a failure in decoding the received TB:

starting the at least one Retransmission Timer based on the configuration message; and

monitoring, before the at least one Retransmission Timer expires, a PDCCH for at least one PTM retransmission for the failed TB requested by the one or more UEs in the connected state via at least one Hybrid Automatic Repeat Request, HARQ, feedback to the network node.

16. The method according to claim 15 , wherein the at least one Retransmission Timer comprises a HARQ Round-Trip-Time, RTT, Timer and a Discontinuous Reception, DRX, Retransmission Timer,

wherein the UE, in the inactive or idle state, performs the following:

receiving, via the PDCCH transmission, Downlink Control Information, DCI, comprising a timing indicator for indicating a time slot for the at least one HARQ feedback,

starting the HARQ RTT Timer after a predetermined symbol in the indicated time slot; and

starting the DRX Retransmission Timer after the HARQ RTT Timer expires.

17. The method according to claim 16 , wherein:

the indicated time slot comprises a plurality of symbols,

the UE is pre-configured with a fixed number indicating a corresponding symbol comprised in the indicated time slot as the predetermined symbol that is default for all MBS sessions.

18. The method according to claim 16 , wherein:

the indicated time slot comprises a plurality of symbols,

the configuration message further configures the UE with a specific number indicating a corresponding symbol of the indicated time slot as the predetermined symbol for a specific MBS session or default for all MBS sessions.

19. The method according to claim 16 , wherein the UE performs the following:

extending the configured DRX Retransmission Timer with at least one additional time slot, when the predetermined symbol is the first symbol in the indicated time slot.

20. The method according to claim 15 , wherein the configuration message is per Temporary Mobile Group Identity, TMGI, or a corresponding identifier identifying a specific multicast service or all multicast services of the group of UEs.

Assignments (7)
CORRECTIVE ASSIGNMENT TO CORRECT THE ASSIGNEE ADDRESS TO KARAKAARI 7, ESPOO, FINLAND, 02610 PREVIOUSLY RECORDED ON REEL 71687 FRAME 17. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Oct 10, 2025
From: NOKIA SOLUTIONS AND NETWORKS GMBH & CO. KG
To: NOKIA TECHNOLOGIES OY
Reel/Frame 073058/0625 →
CORRECTIVE ASSIGNMENT TO CORRECT THE ASSIGNEE ADDRESS TO KARAKAARI 7, ESPOO, FINLAND, 02610 PREVIOUSLY RECORDED ON REEL 71687 FRAME 53. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Oct 10, 2025
From: NOKIA SOLUTIONS AND NETWORKS OY
To: NOKIA TECHNOLOGIES OY
Reel/Frame 073059/0169 →
CORRECTIVE ASSIGNMENT TO CORRECT THE ASSIGNEE ADDRESS TO KARAKAARI 7, ESPOO, FINLAND, 02610 AND CORRESPONDENCE ADDRESS TO NOKIA OF AMERICA CORPORATION 3201 OLYMPUS BOULEVARD MAIL STOP - TECH-IP DALLAS, TEXAS 75019 PREVIOUSLY RECORDED ON REEL 71686 FRAME 988. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Oct 10, 2025
From: MALKAMÄKI, ESA MIKAEL; NARAYANAN, SUBIN
To: NOKIA SOLUTIONS AND NETWORKS OY
Reel/Frame 073059/0174 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 14, 2025
From: MIKAEL MALKAMÄKI, ESA; NARAYANAN, SUBIN
To: NOKIA SOLUTIONS AND NETWORKS OY
Reel/Frame 071686/0988 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 14, 2025
From: NOKIA SOLUTIONS AND NETWORKS OY
To: NOKIA TECHNOLOGIES OY
Reel/Frame 071687/0053 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 14, 2025
From: BARAN ELMALI, UGUR; MOHAMMAD SOLEYMANI, DARIUSH
To: NOKIA SOLUTIONS AND NETWORKS GMBH & CO. KG
Reel/Frame 071687/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 14, 2025
From: NOKIA SOLUTIONS AND NETWORKS GMBH & CO. KG
To: NOKIA TECHNOLOGIES OY
Reel/Frame 071687/0017 →
Priority Claims (1)
FI 20235850 · Jul 31, 2023 · national
Continuity (1)
Related Publication 20250261204A1 · Aug 14, 2025
References Cited (21)
US 11956780B2 · Lee · 2024 [cited by examiner]
US 11962420B1 · Tseng · 2024 [cited by examiner]
US 20210314098A1 · Liu et al. · 2021 [cited by applicant]
US 20230063082A1 · Zhou · 2023 [cited by examiner]
US 20230104267A1 · Shrivastava · 2023 [cited by examiner]
US 20230224090A1 · Tseng · 2023 [cited by applicant]
WO 2022205296A1 · 2022 [cited by applicant]
WO 2022231249A1 · 2022 [cited by applicant]
“New SID: Architectural enhancements for 5G multicast-broadcast services Phase 2”, TSG SA Meeting #SP-94E, SP-211645, Agenda: 9.1.3, Huawei, Dec. 14-20, 2021, pp. 1-5. [cited by applicant]
“3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Study on architectural enhancements for 5G multicast-broadcast services; Phase 2 (Release 18)”, 3GPP TR 23.700-47, V18.0.0,… [cited by applicant]
“New WID: Enhancements of NR Multicast and Broadcast Services”, 3GPP TSG RAN Meeting #94-e, RP-213568, Agenda: 8A.2, CATT, Dec. 6-17, 2021, 5 pages. [cited by applicant]
“PTM retransmission reception by UEs without HARQ feedback”, 3GPP TSG-RAN WG2 Meeting #122, R2-2306392, Agenda: 6.2.2, Nokia, May 22-26, 2023, 5 pages. [cited by applicant]
“PTM retransmission reception by UEs without HARQ feedback”, 3GPP TSG-RAN WG2 Meeting #122, R2-2306853, Agenda: 6.2.2, Nokia, May 22-26, 2023, 10 pages. [cited by applicant]
“User plane aspects of multicast reception in RRC_INACTIVE state”, 3GPP TSG-RAN WG2 Meeting #123, R2-230xxxx, Agenda: 7.11.2.2, Nokia, Aug. 21-25, 2023, 4 pages. [cited by applicant]
“3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; NR and NG-RAN Overall Description, Stage 2 (Release 16)”, 3GPP TS 38.300, V16.6.0, Jun. 2021, pp. 1-152. [cited by applicant]
“3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NG-RAN; Architecture description (Release 16)”, 3GPP TS 38.401, V16.6.0, Jul. 2021, pp. 1-79. [cited by applicant]
“3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Study on new radio access technology: Radio access architecture and interfaces (Release 14)”, 3GPP TR 38.801, V14.0.0, Mar. 2017, … [cited by applicant]
“3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Radio Resource Control (RRC) protocol specification (Release 16)”, 3GPP TS 38.331, V16.5.0, Jun. 2021, pp. 1-959. [cited by applicant]
Office Action received for corresponding Finnish Patent Application No. 20235850, dated Dec. 14, 2023, 10 pages. [cited by applicant]
International Search Report and Written Opinion received for corresponding Patent Cooperation Treaty Application No. PCT/EP2024/064981, dated Sep. 30, 2024, 12 pages. [cited by applicant]
“Report of [AT119bis-e][605][eMBS] PTM configuration for Inactive (CATT)”, 3GPP TSG-RAN WG2 #119-bis-e, R2-2210880, Agenda: 8.11.2, CATT, Oct. 10-19, 2022, 26 pages. [cited by applicant]