IP Library › Granted Patent US 12,462,901
Granted Patent B2
US 12,462,901 · App. 17/597,133 · Granted Nov 4, 2025

Method and system for performance optimization of flue gas desulphurization (FGD) unit

Inventors: Rajan Kumar (Pune, IN); Pallavi Venugopal Minimol (Pune, IN); Sagar Srinivas Sakhinana (Pune, IN); Abhishek Baikadi (Pune, IN); Duc Doan (Tokyo, JP); Vishnu Swaroopji Masampally (Pune, IN); Venkataramana Runkana (Pune, IN)
Assignee: Tata Consultancy Services Limited
G16C20/10G05B13/048G16C20/70
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,462,901
App. No.
17/597,133
Granted
Nov 4, 2025
Kind
B2
Abstract

State of the art techniques used for Flue Gas Desulpharization (FGD) process monitoring fail to comprehend the relationship between various process parameters, which is crucial in determining the performance of a FGD process being monitored. The disclosure herein generally relates to industrial process monitoring, and, more particularly, to a method and system for performance optimization of Flue Gas Desulphurization (FGD) Unit. The system identifies Key Performance Indicators (KPIs) associated with the process being monitored, and identifies parameters associated with each KPI. This information is used to generate several predictive models, from which a predictive model having the highest value of composite model score amongst the predictive models is selected as the predictive model for processing the input data, which is then used to perform optimization of the FGD process.

Claims (98)

1 . A processor implemented method for optimization of a Flue Gas Desulphurization (FGD) process, comprising:

collecting a plurality of plant data using a plurality of sensors, from a FGD process being monitored, as input data, via one or more hardware processors, wherein the plurality of plant data comprises real-time and non-real-time data;

pre-processing the input data, comprising removing one or more unwanted components from the input data via the one or more hardware processors;

performing a dimensionality reduction on pre-processed input data, via the one or more hardware processors, comprising:

performing a feature selection, wherein the feature selection comprising identifying a plurality of features affecting each of a plurality of Key Performance Indicators (KPIs) of the FGD process, from the pre-processed input data, wherein the plurality of KPIs are a plurality of Process Variables (PVs) representing a running state of the FGD plant and in turn the FGD process being monitored, and wherein the plurality of PVs comprise chimney inlet Sulphur dioxide (SO 2 ) concentration, absorption tower level, absorption tower pH, booster upper fan power consumption, limestone slurry concentration inside tower, and gypsum conversion; and

extracting the plurality of features by performing a feature extraction;

generating a plurality of predictive models based on the plurality of features extracted, for each KPI, via the one or more hardware processors;

selecting one of the plurality of predictive models as a predictive model for processing the input data, via the one or more hardware processors;

compensating for one or more unmeasured parameters of the selected predictive model using information generated using one or more soft-sensors, via the one or more hardware processors, wherein the one or more unmeasured parameters comprise one or more PVs among the plurality of PVs;

performing the optimization of the FGD process, via the one or more hardware processors, comprising:

simulating the operation of the FGD process using the selected predictive model, comprising predicting a plurality of FGD process parameters by the selected predictive model;

estimating a plurality of optimal set points of operation, in real time, from the predicted plurality of FGD process parameters;

determining at least one performance lapse in the FGD process, based on the estimated plurality of optimal set points of operation; and

generating at least one recommendation to optimize the FGD process, in response to the determined at least one performance lapse, wherein the at least one recommendation comprise an optimal set points of a plurality of Manipulated Variables (MVs) of the FGD plant, wherein the plurality of MVs comprise limestone slurry flow rate, limestone slurry concentration, air flow for oxidation, gypsum purging, number of recirculation pumps, and elevation of spray for the pumps, and wherein the plurality of MVs are adjusted by a control system of the FGD plant to bring desirable effects in the plurality of PVs;

continuously pushing the optimal set points of the plurality of MVs into the FGD plant at predefined time intervals to optimize operation of the FGD process; and

detecting deviation in working of one or more equipment in the FGD plant by comparing the selected predictive model with one or more working models of the one or more equipment, wherein upon detecting deviation an alarm is generated to alert a user about a potential equipment failure.

2 . The processor implemented method as claimed in claim 1 , wherein selecting the predictive model from the plurality of predictive models, comprising:

calculating values of different performance metrics of the plurality of predictive models;

estimating a composite model score of each of the plurality of predictive models, for a given test dataset;

comparing the estimated composite model score of each of the plurality of predictive models with estimated composite model score of each of the other predictive models; and

selecting a predictive model having the highest value of the composite model score amongst the plurality of predictive models, as the predictive model for processing the input data.

3 . The processor implemented method as claimed in claim 1 , wherein the selected predictive model generates a plurality of FGD process parameters while simulating the operation of the FGD process.

4 . The processor implemented method as claimed in claim 1 , wherein performance of the selected predictive model is validated, comprising:

estimating the error in prediction of the plurality of FGD process parameters for the selected predictive model;

calculating a health score of the selected predictive model, based on the estimated error in prediction of the plurality of FGD process parameters;

comparing the calculated health score with a threshold of health score; and

correcting the selected predictive model if the calculated health score exceeds the threshold health score.

5 . The method as claimed in claim 1 , wherein an equipment monitoring is performed using one or more of the predictive models, comprising:

monitoring at least one equipment in the FGD process for a faulty operation, based on data from at least one predictive model of the at least one equipment, via the one or more hardware processors;

generating an alarm if at least one instance of the faulty operation is detected, via the one or more hardware processors;

performing a root-cause analysis to determine at least one cause of the detected faulty operation of the equipment, via the one or more hardware processors; and

estimating a Remaining Useful Life (RUL) of the equipment, via the one or more hardware processors.

6 . A system for optimization of a Flue Gas Desulphurization (FGD) process, comprising:

one or more hardware processors;

a communication interface; and

a memory storing a plurality of instructions, the plurality of instructions when executed, cause the one or more hardware processors to:

collect a plurality of plant data using a plurality of sensors, from a FGD process being monitored, as input data, wherein the plurality of plant data comprises real-time and non-real-time data;

pre-process the input data by removing one or more unwanted components from the input data;

perform a dimensionality reduction on pre-processed input data, comprising:

performing a feature selection, wherein the feature selection comprising identifying a plurality of features affecting each of a plurality of Key Performance Indicators (KPIs) of the FGD process, from the pre-processed input data, wherein the plurality of KPIs are a plurality of Process Variables PVs) representing a running state of the FGD plant and in turn the FGD process being monitored, and wherein the plurality of PVs comprise chimney inlet Sulphur dioxide (SO 2 ) concentration, absorption tower level, absorption tower pH, booster upper fan power consumption, limestone slurry concentration inside tower, and gypsum conversion; and

extracting the plurality of features by performing a feature extraction;

generate a plurality of predictive models based on the plurality of features extracted, for each KPI;

select one of the plurality of predictive models as a predictive model for processing the input data;

compensate for one or more unmeasured parameters of the selected predictive model using information generated using one or more soft-sensors, wherein the one or more unmeasured parameters comprise one or more PVs among the plurality of PVs;

perform the optimization of the FGD process, comprising:

simulating the operation of the FGD process using the selected predictive model, comprising predicting a plurality of FGD process parameters by the selected predictive model;

estimating a plurality of optimal set points of operation, in real time, from the predicted plurality of FGD process parameters;

determining at least one performance lapse in the FGD process, based on the estimated plurality of optimal set points of operation; and

generating at least one recommendation to optimize the FGD process, in response to the determined at least one performance lapse, wherein the at least one recommendation comprise an optimal set points of a plurality of Manipulated Variables (MVs) of the FGD plant, wherein the plurality of MVs comprise limestone slurry flow rate, limestone slurry concentration, air flow for oxidation, gypsum purging, number of recirculation pumps, and elevation of spray for the pumps, and wherein the plurality of MVs are adjusted by a control system of the FGD plant to bring desirable effects in the plurality of PVs;

continuously push the optimal set points of the plurality of MVs into the FGD plant at predefined time intervals to optimize operation of the FGD process; and

detecting deviation in working of one or more equipment in the FGD plant by comparing the selected predictive model with one or more working models of the one or more equipment, wherein upon detecting deviation an alarm is generated to alert a user about a potential equipment failure.

7 . The system as claimed in claim 6 , wherein the system selects the predictive model from the plurality of predictive models, by:

estimating performance value of each of the plurality of predictive models, for a given test dataset;

comparing the estimated performance value of each of the plurality of predictive models with estimated composite model score of each of the other predictive models; and

selecting a predictive model having the highest value of composite model score amongst the plurality of predictive models, as the predictive model for processing the input data.

8 . The system as claimed in claim 6 , wherein the system generates a plurality of FGD process parameters while simulating the operation of the FGD process using the selected predictive model.

9 . The system as claimed in claim 6 , wherein the system validates performance of the selected predictive model, by:

estimating the error in prediction of the plurality of FGD process parameters for the selected predictive model;

calculating a health score of the selected predictive model, based on the estimated error in prediction of the plurality of FGD process parameters;

comparing the calculated health score with a threshold health score; and

correcting the selected predictive model if the calculated health score exceeds the threshold health score.

10 . The system as claimed in claim 6 , wherein the system performs an equipment monitoring using one or more of the predictive models, by:

monitoring at least one equipment in the FGD process for a faulty operation, based on data in at least one predictive model of the at least one equipment, via the one or more hardware processors;

generating an alarm if at least one instance of the faulty operation is detected, via the one or more hardware processors;

performing a root-cause analysis to determine at least one cause of the detected faulty operation of the equipment, via the one or more hardware processors; and

estimating a Remaining Useful Life (RUL) of the equipment, via the one or more hardware processors.

11 . A non-transitory computer readable medium for optimization of a Flue Gas Desulphurization (FGD) process, wherein the non-transitory computer readable medium performs optimization of the FGD process by:

collecting a plurality of plant data using a plurality of sensors, from a FGD process being monitored, as input data, via one or more hardware processors, wherein the plurality of plant data comprises real-time and non-real-time data;

pre-processing the input data, comprising removing one or more unwanted components from the input data via the one or more hardware processors;

performing a dimensionality reduction on pre-processed input data, via the one or more hardware processors, comprising:

performing a feature selection, wherein the feature selection comprising identifying a plurality of features affecting each of a plurality of Key Performance Indicators (KPIs) of the FGD process, from the pre-processed input data, wherein the plurality of KPIs are a plurality of Process Variables (PVs) representing a running state of the FGD plant and in turn the FGD process being monitored, and wherein the plurality of PVs comprise chimney inlet Sulphur dioxide (SO 2 ) concentration, absorption tower level, absorption tower pH, booster upper fan power consumption, limestone slurry concentration inside tower, and gypsum conversion; and

extracting the plurality of features by performing a feature extraction;

generating a plurality of predictive models based on the plurality of features extracted, for each KPI, via the one or more hardware processors;

selecting one of the plurality of predictive models as a predictive model for processing the input data, via the one or more hardware processors;

compensating for one or more unmeasured parameters of the selected predictive model using information generated using one or more soft-sensors, via the one or more hardware processors, wherein the one or more unmeasured parameters comprise one or more PVs among the plurality of PVs;

performing the optimization of the FGD process, via the one or more hardware processors, comprising:

simulating the operation of the FGD process using the selected predictive model, comprising predicting a plurality of FGD process parameters by the selected predictive model;

estimating a plurality of optimal set points of operation, in real time, from the predicted plurality of FGD process parameters;

determining at least one performance lapse in the FGD process, based on the estimated plurality of optimal set points of operation; and

generating at least one recommendation to optimize the FGD process, in response to the determined at least one performance lapse, wherein the at least one recommendation comprise an optimal set points of a plurality of Manipulated Variables (MVs) of the FGD plant, wherein the plurality of MVs comprise limestone slurry flow rate, limestone slurry concentration, air flow for oxidation, gypsum purging, number of recirculation pumps, and elevation of spray for the pumps, and wherein the plurality of MVs are adjusted by a control system of the FGD plant to bring desirable effects in the plurality of PVs;

continuously pushing the optimal set points of the plurality of MVs into the FGD plant at predefined time intervals to optimize operation of the FGD process; and

detecting deviation in working of one or more equipment in the FGD plant by comparing the selected predictive model with one or more working models of the one or more equipment, wherein upon detecting deviation an alarm is generated to alert a user about a potential equipment failure.

12 . The non-transitory computer readable medium as claimed in claim 11 , wherein selecting the predictive model from the plurality of predictive models, comprising:

calculating values of different performance metrics of the plurality of predictive models;

estimating a composite model score of each of the plurality of predictive models, for a given test dataset;

comparing the estimated composite model score of each of the plurality of predictive models with estimated composite model score of each of the other predictive models; and

selecting a predictive model having the highest value of the composite model score amongst the plurality of predictive models, as the predictive model for processing the input data.

13 . The non-transitory computer readable medium as claimed in claim 11 , wherein the selected predictive model generates a plurality of FGD process parameters while simulating the operation of the FGD process.

14 . The non-transitory computer readable medium as claimed in claim 11 , wherein performance of the selected predictive model is validated, comprising:

estimating the error in prediction of the plurality of FGD process parameters for the selected predictive model;

calculating a health score of the selected predictive model, based on the estimated error in prediction of the plurality of FGD process parameters;

comparing the calculated health score with a threshold of health score; and

correcting the selected predictive model if the calculated health score exceeds the threshold health score.

15 . The non-transitory computer readable medium as claimed in claim 11 , wherein an equipment monitoring is performed using one or more of the predictive models, comprising:

monitoring at least one equipment in the FGD process for a faulty operation, based on data from at least one predictive model of the at least one equipment, via the one or more hardware processors;

generating an alarm if at least one instance of the faulty operation is detected, via the one or more hardware processors;

performing a root-cause analysis to determine at least one cause of the detected faulty operation of the equipment, via the one or more hardware processors; and

estimating a Remaining Useful Life (RUL) of the equipment, via the one or more hardware processors.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 27, 2021
From: KUMAR, RAJAN; VENUGOPAL MINIMOL, PALLAVI; SAKHINANA, SAGAR SRINIVAS; BAIKADI, ABHISHEK; DOAN, DUC; MASAMPALLY, VISHNU SWAROOPJI; RUNKANA, VENKATARAMANA
To: TATA CONSULTANCY SERVICES LIMITED
Reel/Frame 058592/0142 →
Priority Claims (1)
IN 201921025745 · Jun 27, 2019 · national
Continuity (1)
Related Publication 20220246248A1 · Aug 4, 2022
References Cited (22)
US 7522963B2 · Boyden et al. · 2009 [cited by applicant]
US 8855804B2 · Hazen et al. · 2014 [cited by applicant]
US 9708960B2 · Hall et al. · 2017 [cited by applicant]
US 10203667B2 · Escarcega · 2019 [cited by examiner]
US 10386827B2 · Enver et al. · 2019 [cited by applicant]
US 10995277B2 · Cross · 2021 [cited by examiner]
US 11365886B2 · Faiella · 2022 [cited by examiner]
US 12021384B2 · Deodhar · 2024 [cited by examiner]
US 20060045800A1 · Boyden et al. · 2006 [cited by applicant]
US 20060047366A1 · Boyden · 2006 [cited by examiner]
US 20060121616A1 · Lefebvre et al. · 2006 [cited by applicant]
US 20090149981A1 · Evans et al. · 2009 [cited by applicant]
US 20140331752A1 · Hall et al. · 2014 [cited by applicant]
US 20160018796A1 · Lu · 2016 [cited by examiner]
US 20160018797A1 · Lu · 2016 [cited by examiner]
US 20180341252A1 · Lu · 2018 [cited by examiner]
US 20210132591A1 · Lu · 2021 [cited by examiner]
US 20210132596A1 · Lu · 2021 [cited by examiner]
US 20210255610A1 · Webb · 2021 [cited by examiner]
US 20220320861A1 · Deodhar · 2022 [cited by examiner]
CN 104657586 · 2017 [cited by applicant]
International Search Report and Written Opinion mailed Jan. 13, 2021, in International Application No. PCT/IN2020/050558; 9 pages. [cited by applicant]