IP Library Granted Patent US 12,477,471
Granted Patent B2
US 12,477,471 · App. 17/972,925 · Granted Nov 18, 2025

Standard for transmission of a UE

Inventors: Yoonoh Yang (Seoul, KR); Byeongyong Park (Seoul, KR); Markus Pettersson (Seoul, KR); Ilnam Cho (Seoul, KR); Sangwook Lee (Seoul, KR); Jinyup Hwang (Seoul, KR)
Assignee: LG ELECTRONICS INC.
H04W52/146H04W72/0453H04W72/0473H04W72/21
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,477,471
App. No.
17/972,925
Granted
Nov 18, 2025
Kind
B2
Abstract

One disclosure of the present specification provides a method for performing communication by a user equipment (UE). The method comprises the steps of: determining transmission power; transmitting uplink signal via n263 frequency band, based on the transmission power, wherein the UE is power class 3 UE, wherein the transmission power is determined based on i) minimum peak EIRP (Effective Isotropic Radiated Power) of the UE and ii) EIRP related to spherical coverage.

Claims (37)

1 . A UE (User Equipment) to perform communication, comprising:

a transceiver; and

a processor,

wherein the processor determines transmission power;

wherein the transceiver transmits an uplink signal via n263 frequency band, based on the transmission power,

wherein the UE is a power class 3 UE,

wherein the transmission power is determined based on i) minimum peak EIRP (Effective Isotropic Radiated Power) of the UE and ii) EIRP related to spherical coverage,

wherein the minimum peak EIRP is 7.6 dBm.

2 . The UE of claim 1 ,

wherein the EIRP related to spherical coverage is EIRP at 50 percentile of the distribution of radiated power measured over the full sphere around the UE,

wherein the EIRP related to spherical coverage is 2.3 dBm.

3 . The UE of claim 1 ,

wherein the UE includes 8 antennas.

4 . The UE of claim 1 ,

wherein the n263 frequency band is a frequency band between 57000 MHz and 71000 MHz.

5 . A method for performing communication, performed by a UE (User Equipment), comprising:

determining transmission power;

transmitting an uplink signal via n263 frequency band, based on the transmission power,

wherein the UE is a power class 3 UE,

wherein the transmission power is determined based on i) minimum peak EIRP (Effective Isotropic Radiated Power) of the UE and ii) EIRP related to spherical coverage,

wherein the minimum peak EIRP is 7.6 dBm.

6 . The method of claim 5 ,

wherein the EIRP related to spherical coverage is EIRP at 50 percentile of the distribution of radiated power measured over the full sphere around the UE,

wherein the EIRP related to spherical coverage is 2.3 dBm.

7 . The method of claim 5 ,

wherein the UE includes 8 antennas.

8 . The method of claim 5 ,

wherein the n263 frequency band is a frequency band between 57000 MHz and 71000 MHz.

9 . An apparatus in mobile communication, the apparatus comprising:

at least one processor; and

at least one memory storing instructions and operably electrically connectable with the at least one processor;

wherein, based on the instructions performed by the at least one processor, operation includes:

determining transmission power;

transmitting an uplink signal via n263 frequency band, based on the transmission power,

wherein the apparatus is a power class 3 UE,

wherein the transmission power is determined based on i) minimum peak EIRP (Effective Isotropic Radiated Power) of the UE and ii) EIRP related to spherical coverage,

wherein the minimum peak EIRP is 7.6 dBm.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 25, 2022
From: YANG, YOONOH; PARK, BYEONGYONG; PETTERSSON, MARKUS; CHO, ILNAM; LEE, SANGWOOK; HWANG, JINYUP
To: LG ELECTRONICS INC.
Reel/Frame 061528/0390 →
Continuity (2)
Provisional Application 63297810 · Jan 10, 2022
Related Publication 20230224817A1 · Jul 13, 2023
References Cited (36)
US 8945883B2 · Eberwine · 2015 [cited by examiner]
US 10624038B2 · Lim · 2020 [cited by examiner]
US 10863582B2 · Yu · 2020 [cited by examiner]
US 11582702B2 · Andou · 2023 [cited by examiner]
US 11784677B2 · Yang · 2023 [cited by examiner]
US 11818671B2 · Yang · 2023 [cited by examiner]
US 11831383B2 · Raghavan · 2023 [cited by examiner]
US 11844028B2 · Levy · 2023 [cited by examiner]
US 11856570B2 · Raghavan · 2023 [cited by examiner]
US 11879924B2 · Wen · 2024 [cited by examiner]
US 11895600B2 · Yang · 2024 [cited by examiner]
US 11917665B2 · Yang · 2024 [cited by examiner]
US 11924858B2 · Pawar · 2024 [cited by examiner]
US 12068818B2 · Rom · 2024 [cited by examiner]
US 20170086137A1 · Sun · 2017 [cited by examiner]
US 20190182898A1 · Yu · 2019 [cited by examiner]
US 20190349863A1 · Lim · 2019 [cited by examiner]
US 20230013759A1 · Yang · 2023 [cited by examiner]
US 20230223980A1 · Yang · 2023 [cited by examiner]
US 20230224016A1 · Yang · 2023 [cited by examiner]
US 20230224828A1 · Yang · 2023 [cited by examiner]
US 20230345389A1 · Yang · 2023 [cited by examiner]
WO 2019026831A1 · 2019 [cited by applicant]
WO 2021165770A1 · 2021 [cited by applicant]
WO 2021261847A1 · 2021 [cited by applicant]
WO WO2023282691A1 · 2023 [cited by examiner]
Qualcomm et al., “Extending current NR operation to 71GHz”, 3GPP TSG RAN meeting #94e, RP-212990, Electronic Meeting, Dec. 6-17, 2021. [cited by applicant]
Qualcomm Incorporated, “60 GHz UE TX”, 3GPP TSG-RAN WG4 #101-e, R4-2119122, e-Meeting, Nov. 1-12, 2021. [cited by applicant]
Qualcomm Inc., “draft CR 60 GHz UE TX”, 3GPP TSR-RAN4 Meeting #101e, R4-2118354, Online, Nov. 1-12, 2021. [cited by applicant]
Sony, “Views on UE Array, EIRP level and Spherical Coverage at 60 GHz”, 3GPP TSG-RAN WG4 Meeting #101-e, R4-2117616, Electronic Meeting, Nov. 1-12, 2021. [cited by applicant]
Murata Manufacturing Co., Ltd., “Views on UE antenna elements for FR2-2”, 3GPP RAN WG4 Meeting #101-bis-e, R4-2200067, Electronic Meeting, Jan. 17-25, 2022. [cited by applicant]
Nokia, “Bandplan for a NR band in the range 52.6GHZ-71GHz”, 3GPP TSG-RAN WG4 Meeting #100-e, R4-2113686, Electronic meeting, Aug. 16-27, 2021. [cited by applicant]
Qualcomm Incorporated, “60GHz UE TX”, 3GPP TSG-RAN WG4 #104-e, R4-2211628, e-Meeting, Aug. 10, 2022. [cited by applicant]
Intel Corporation, “Big CR of TS38.101-2 for FR2-2 UE requirements”, 3GPP TSG-RAN WG4 Meeting #104-e, R4-2215255, Electronic meeting, Aug. 15-26, 2022. [cited by applicant]
Murata, “Draft CR to 38.101-2 on minimum peak EIRP for PC3 band n263”, 3GPP RAN4 Meeting #104-3, R4-2212278, Electronic Meeting, Aug. 15-26, 2022. [cited by applicant]
Nokia, “Bandplan for a NR band in the range 52.6GHZ-71GHz”, 3GPP TSG-RAN WG4 Meeting #100-e, R4-2118738, Electronic meeting, Nov. 1-12, 2021. [cited by applicant]