IP Library › Granted Patent US 12,477,607
Granted Patent B2
US 12,477,607 · App. 17/819,158 · Granted Nov 18, 2025

Communication control method

Inventors: Masato Fujishiro (Yokohama, JP); Henry Chang (San Diego, CA)
Assignee: KYOCERA Corporation
H04W76/18H04B7/18513H04W40/22
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,477,607
App. No.
17/819,158
Granted
Nov 18, 2025
Kind
B2
Abstract

A communication control method includes, by a relay node relaying communication between a lower node and an upper node, detecting a failure in a first radio link between the upper node and the relay node, by the relay node, in response to the detection of the failure, transmitting, to the lower node, a first notification indicating the detection of the failure and attempting recovery of the first radio link, and, by the lower node, executing predetermined processing in a state of maintaining a second radio link with the relay node until a predetermined time period elapses after reception of the first notification from the relay node.

Claims (16)

1 . A communication control method comprising:

by an Integrated Access/Backhaul (IAB) node relaying communication between a lower IAB node and an upper IAB node, detecting a failure in a first radio link between the upper IAB node and the IAB node;

by the IAB node, in response to the detection of the failure, transmitting, to the lower IAB node, a first notification indicating both that the failure is detected by the IAB node and that a recovery is being attempted;

by the lower IAB node, in response to the reception of the first notification, ceasing data transmission to the IAB node; and

by the lower IAB node, resuming data transmission to the IAB node when receiving a second notification indicating that the recovery from the failure was successful.

2 . The communication control method according to claim 1 , further comprising:

by the lower IAB node, in response to satisfaction of a condition that the IAB node fails to recover from the failure, executing a conditional handover from the IAB node to another IAB node.

3 . A lower Integrated Access/Backhaul (IAB) node executing communication with an upper IAB node via a IAB node, the lower IAB node comprising:

a receiver configured to receive, from the IAB node, a first notification transmitted in response to detection of a failure in a first radio link between the upper IAB node and the IAB node, the first notification indicating both that the failure is detected by the IAB node and that a recovery is being attempted; and

a controller configured to cease data transmission to the IAB node, in response to the reception of the first notification, wherein

the controller resumes data transmission to the IAB node when receiving a second notification indicating that the recovery from the failure was successful.

4 . A communication system comprising: a lower IAB node according to claim 3 ; and an IAB node.

5 . A chipset for controlling a lower Integrated Access/Backhaul (IAB) node executing communication with an upper IAB node via a IAB node, the chipset comprising: a processor and a memory coupled to the processor, the processor configured to:

receive, from the IAB node, a first notification transmitted in response to detection of a failure in a first radio link between the upper IAB node and the IAB node, the first notification indicating both that the failure is detected by the IAB node and that a recovery is being attempted; and

cease data transmission to the IAB node, in response to the reception of the first notification; and

resume data transmission to the IAB node when receiving a second notification indicating that the recovery from the failure was successful.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 11, 2022
From: FUJISHIRO, MASATO; CHANG, HENRY
To: KYOCERA CORPORATION
Reel/Frame 060787/0091 →
Continuity (3)
Continuation PCTJP2021004116 · Feb 4, 2021
Provisional Application 62975290 · Feb 12, 2020
Related Publication 20220386404A1 · Dec 1, 2022
References Cited (15)
US 11882516B2 · Marinier · 2024 [cited by examiner]
US 20200092784A1 · Hampel · 2020 [cited by examiner]
US 20210112415A1 · Lee · 2021 [cited by examiner]
US 20220015011A1 · Liu · 2022 [cited by examiner]
US 20220086749A1 · Ishii · 2022 [cited by examiner]
US 20220151006A1 · Muhammad · 2022 [cited by examiner]
US 20220159768A1 · Zhu · 2022 [cited by examiner]
US 20220255689A1 · Wen · 2022 [cited by examiner]
US 20220303763A1 · Guo · 2022 [cited by examiner]
US 20220408275A1 · Awada · 2022 [cited by examiner]
US 20230189377A1 · Fujishiro · 2023 [cited by examiner]
US 20240267969A1 · Fujishiro · 2024 [cited by examiner]
ZTE, Sanechips; “Discussion on IAB BH RLF handling”; 3GPP TSG RAN WG2 Meeting #108; R2-1915119; Nov. 18-22, 2019; Total 6 pages; Reno, USA. [cited by applicant]
Kyocera; “Possible issues on Backhaul RLF handling”; 3GPP TSG RAN WG2 Meeting #108; R2-1915598; Nov. 18-22, 2019; Total 5 pages; Reno, USA. [cited by applicant]
LG Electronics; “Resolving open issues on BH RLF”; 3GPP TSG RAN WG2 Meeting #108; R2-1916169; Nov. 17-23, 2019; Total 3 pages; Reno, USA. [cited by applicant]