IP Library › Granted Patent US 12,492,534
Granted Patent B2
US 12,492,534 · App. 18/822,383 · Granted Dec 9, 2025

Accessing wells below an obstruction or discontinuity

Inventors: Toby Menard (New Orleans, LA); Andrew M. Ferguson (Moore, OK); Roger L. Schultz (Ninnekah, OK); Steven A. Ariss (Boyers, PA); Dustin Locklear (Moore, OK); Nigel Rowcliffe (Mount Pleasant, MI)
Assignee: THRU TUBING SOLUTIONS, INC.
E03B3/15E21B4/02E21B7/04E21B29/06E21B33/13E21B47/024E21B47/12
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,492,534
App. No.
18/822,383
Granted
Dec 9, 2025
Kind
B2
Abstract

A system can include a tubular string with a drilling bottom hole assembly connected at a distal end of a coiled tubing including a communication line permitting communication between surface instrumentation and the drilling bottom hole assembly, and the drilling bottom hole assembly including an orienter and ranging equipment. The tubular string is positioned in an intercept wellbore which intersects a target wellbore downhole of an obstruction that prevents access to the target wellbore downhole of the obstruction. A method can include drilling an intercept wellbore outward from an original wellbore, after an obstruction is introduced between the original wellbore and a target wellbore, and intersecting the target wellbore with the intercept wellbore, so that fluid communication is provided between the intercept and target wellbores.

Claims (32)

1 . A system for use with a subterranean well, the system comprising:

a tubular string comprising a drilling bottom hole assembly connected at a distal end of a coiled tubing, the coiled tubing comprising a communication line configured to permit communication between surface instrumentation and the drilling bottom hole assembly, and the drilling bottom hole assembly comprising an orienter and ranging equipment;

in which the tubular string exits a pre-existing wellbore uphole of an obstruction that prevents access to a portion of the pre-existing wellbore downhole of the obstruction,

in which the portion of the pre-existing wellbore downhole of the obstruction comprises a target wellbore due to the obstruction, and

in which the tubular string extends through an intercept wellbore which intersects the target wellbore downhole of the obstruction, so that fluid communication is provided between the pre-existing wellbore uphole of the obstruction and the target wellbore.

2 . The system of claim 1 , in which the target wellbore is lined with a casing string, and in which the drilling bottom hole assembly is configured to cause fluid communication to be permitted between the intercept and target wellbores.

3 . The system of claim 1 , in which the target wellbore is lined with a casing string, and in which the drilling bottom hole assembly is configured to penetrate the casing string from outside of the casing string.

4 . The system of claim 3 , in which the pre-existing wellbore uphole of the obstruction is lined with the casing string.

5 . The system of claim 4 , in which the tubular string exits the pre-existing wellbore uphole of the obstruction via a first window through the casing string.

6 . The system of claim 5 , in which the drilling bottom hole assembly is configured to form a second window through the casing string, the second window providing fluid communication between the intercept and target wellbores.

7 . The system of claim 6 , in which the tubular string enters the target wellbore via the second window.

8 . The system of claim 4 , in which the tubular string extends through a distal end of the pre-existing wellbore uphole of the obstruction.

9 . The system of claim 4 , in which the tubular string extends through an uphole end of the target wellbore.

10 . The system of claim 3 , in which the obstruction comprises at least one of the group consisting of a break in the casing string, a separation of the casing string, a collapse of the casing string and a substantial restriction in the casing string.

11 . A method of obtaining access to a target wellbore downhole of an obstruction, the method comprising:

drilling an intercept wellbore outward from an upper portion of an original wellbore, the obstruction dividing the original wellbore into the upper portion and a lower portion, in which the lower portion of the original wellbore comprises the target wellbore; and

intersecting the target wellbore with the intercept wellbore, so that fluid communication is provided between the upper portion of the original wellbore and the target wellbore.

12 . The method of claim 11 , in which the drilling comprises drilling the intercept wellbore out of a distal end of the upper portion of the original wellbore.

13 . The method of claim 11 , in which the drilling comprises drilling the intercept wellbore out of a window formed in the upper portion of the original wellbore.

14 . The method of claim 13 , in which the drilling further comprises forming the window with a tubular string comprising jointed tubulars.

15 . The method of claim 14 , in which the intersecting comprises drilling the intercept wellbore with the tubular string comprising coiled tubing.

16 . The method of claim 11 , in which the intersecting comprises drilling into the target wellbore via a window formed in the target wellbore.

17 . The method of claim 11 , in which the intersecting comprises drilling into an uphole end of the target wellbore.

18 . The method of claim 11 , in which the upper portion of the original wellbore and the target wellbore are lined with a same casing string.

19 . The method of claim 18 , in which the drilling comprises drilling the intercept wellbore outward from the casing string, and in which the intersecting comprises forming an opening through the casing string, the opening comprising at least one of the group consisting of a window and a perforation.

20 . The method of claim 19 , in which the forming comprises forming the opening from outside of the casing string.

21 . The method of claim 18 , in which the drilling comprises drilling outward from a first window formed in the casing string, and in which the intersecting comprises forming a second window in the casing string from outside of the casing string.

22 . The method of claim 11 , further comprising flowing cement into the target wellbore, the intercept wellbore and the upper portion of the original wellbore.

23 . The method of claim 11 , in which the drilling comprises deploying a drilling bottom hole assembly into the upper portion of the original wellbore and the intercept wellbore on a tubular string, the drilling bottom hole assembly comprising ranging equipment and an orienter.

24 . The method of claim 23 , in which the drilling further comprises communicating data from the ranging equipment to surface instrumentation.

25 . The method of claim 23 , in which the drilling and intersecting are performed in a single trip of the drilling bottom hole assembly into the intercept wellbore.

26 . The method of claim 23 , in which the ranging equipment detects the target wellbore using at least one of the group consisting of acoustic ranging and ground penetrating radar.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 12, 2024
From: MENARD, TOBY; FERGUSON, ANDREW M.; SCHULTZ, ROGER L.; ARISS, STEVEN A.; LOCKLEAR, DUSTIN; ROWCLIFFE, NIGEL
To: THRU TUBING SOLUTIONS, INC.
Reel/Frame 069570/0170 →
Continuity (5)
Provisional Application 63646046 · May 13, 2024
Provisional Application 63632933 · Apr 11, 2024
Provisional Application 63632140 · Apr 10, 2024
Provisional Application 63585483 · Sep 26, 2023
Related Publication 20250101809A1 · Mar 27, 2025
References Cited (62)
US 3242985A · North · 1966 [cited by examiner]
US 3406766A · Keller · 1968 [cited by applicant]
US 5059064A · Justice · 1991 [cited by applicant]
US 5074365A · Kuckes · 1991 [cited by applicant]
US 5230387A · Waters et al. · 1993 [cited by applicant]
US 5289888A · Talley · 1994 [cited by applicant]
US 5343965A · Talley · 1994 [cited by applicant]
US 5396950A · Talley · 1995 [cited by applicant]
US 5771976A · Talley · 1998 [cited by applicant]
US 6135206A · Gano · 2000 [cited by examiner]
US 6695056B2 · Haugen · 2004 [cited by examiner]
US 6856255B2 · Chalitsios · 2005 [cited by examiner]
US 7036584B2 · Zupanick et al. · 2006 [cited by applicant]
US 7360595B2 · Zupanick et al. · 2008 [cited by applicant]
US 7493951B1 · Kravits et al. · 2009 [cited by applicant]
US 7513304B2 · Stayton · 2009 [cited by applicant]
US 8297377B2 · Zupanick et al. · 2012 [cited by applicant]
US 8333245B2 · Zupanick et al. · 2012 [cited by applicant]
US 8375052B2 · Bordeaux et al. · 2013 [cited by applicant]
US 8376039B2 · Zupanick · 2013 [cited by applicant]
US 8919441B2 · Parlin · 2014 [cited by examiner]
US 9145767B2 · Borges et al. · 2015 [cited by applicant]
US 9644463B2 · Dallas · 2017 [cited by applicant]
US 10018004B2 · Abrant · 2018 [cited by examiner]
US 10125561B2 · Cramm · 2018 [cited by examiner]
US 10174558B2 · Hess · 2019 [cited by examiner]
US 10294777B2 · Jarman et al. · 2019 [cited by applicant]
US 10392929B1 · Servin · 2019 [cited by examiner]
US 10487644B2 · Hess et al. · 2019 [cited by applicant]
US 11365585B1 · Watson et al. · 2022 [cited by applicant]
US 11852384B2 · Toews et al. · 2023 [cited by applicant]
US 20020096336A1 · Zupanick et al. · 2002 [cited by applicant]
US 20020189801A1 · Zupanick et al. · 2002 [cited by applicant]
US 20040050554A1 · Zupanick et al. · 2004 [cited by applicant]
US 20040108110A1 · Zupanick · 2004 [cited by applicant]
US 20050087340A1 · Zupanick et al. · 2005 [cited by applicant]
US 20060266517A1 · Stayton · 2006 [cited by applicant]
US 20060266521A1 · Pratt et al. · 2006 [cited by applicant]
US 20090084534A1 · Zupanick · 2009 [cited by applicant]
US 20090095530A1 · Waters et al. · 2009 [cited by applicant]
US 20090120691A1 · Waters et al. · 2009 [cited by applicant]
US 20100018770A1 · Moriarty et al. · 2010 [cited by applicant]
US 20120205159A1 · Borges et al. · 2012 [cited by applicant]
US 20130153224A1 · Parlin · 2013 [cited by examiner]
US 20140174740A1 · Parlin · 2014 [cited by examiner]
US 20140367170A1 · Hoehn et al. · 2014 [cited by applicant]
US 20150027714A1 · Parlin · 2015 [cited by examiner]
US 20160259079A1 · Wilson · 2016 [cited by examiner]
US 20170248006A1 · Hess et al. · 2017 [cited by applicant]
US 20190071939A1 · Zheng et al. · 2019 [cited by applicant]
US 20210285323A1 · Davis · 2021 [cited by examiner]
US 20220003459A1 · Toews et al. · 2022 [cited by applicant]
US 20220090484A1 · Moss · 2022 [cited by applicant]
US 20250101720A1 · Greenly et al. · 2025 [cited by applicant]
US 20250101809A1 · Menard et al. · 2025 [cited by applicant]
US 20250101810A1 · Rowcliffe et al. · 2025 [cited by applicant]
Halliburton, “Relief Well Planning & Magnetic Ranging,” services brochure, 55 pages, dated Oct. 2020. [cited by applicant]
Iscwsa, “Wellbore Ranging Technologies, Intercept Applications and Best Practices,” dated 2016, 103 pages. [cited by applicant]
James Roberts, “Are Horizontal Wells Right for Development of Groundwater Resources in the Garber-Wellington Aquifer?,” dated 2019, 11 pages. [cited by applicant]
Office Action issued Jul. 21, 2025 for U.S. Appl. No. 18/891,667, 27 pages. [cited by applicant]
Office Action issued May 1, 2025 for U.S. Appl. No. 18/828,880, 14 pages. [cited by applicant]
Office Action issued Jul. 30, 2025 for U.S. Appl. No. 18/828,880, 11 pages. [cited by applicant]