IP Library Granted Patent US 12,519,682
Granted Patent B2
US 12,519,682 · App. 18/220,984 · Granted Jan 6, 2026

Uplink operation for LTE in an unlicensed band

Inventors: Janet A. Stern-Berkowitz (Little Neck, NY); Pouriya Sadeghi (San Diego, CA); J. Patrick Tooher (Montreal, CA); Samian Kaur (Plymouth Meeting, PA); Marian Rudolf (Montreal, CA); Pascal M. Adjakple (Great Neck, NY)
Assignee: INTERDIGITAL PATENT HOLDINGS, INC.
H04L27/0006H04L5/0048H04W16/14H04W72/1215H04W72/1268H04W74/085
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,519,682
App. No.
18/220,984
Granted
Jan 6, 2026
Kind
B2
Abstract

Systems, methods, and instrumentalities are disclosed for Uplink operation in LTE unlicensed spectrum (LTE-U). A wireless transmit/receive unit (WTRU) may receive licensed assisted access (LAA) configuration information, e.g., for a first cell from a second cell. The first cell may be associated with operation in an unlicensed band, and the second cell may be associated with operation in a licensed band. The WTRU may determine whether a first subframe is a sounding reference signal (SRS) subframe for the first cell. If the first subframe is an SRS subframe for the first cell, the WTRU may determine SRS resources for the first subframe and determine whether the WTRU is triggered to transmit an SRS transmission in the first subframe. If it is determined the WTRU is triggered to transmit the SRS transmission in the first subframe, the WTRU may transmit the SRS transmission on the SRS resources for the first subframe.

Claims (35)

1 . A wireless transmit/receive unit (WTRU) comprising:

a processor configured to:

receive an uplink (UL) grant for a first cell;

based on the reception of the UL grant, perform a listen before talk (LBT) procedure associated with the first cell;

based on the LBT procedure indicating an LBT failure, determine that a number of LBT failures associated with the first cell has reached a threshold value; and

based on the determination that the number of LBT failures associated with the first cell has reached the threshold value, transmit a report to a base station, wherein the report is associated with an UL transmission status for the first cell, and wherein the report indicates that the threshold value has been reached.

2 . The WTRU of claim 1 , wherein the processor is further configured to:

receive a configuration for reporting an UL transmission status for the first cell, wherein the configuration indicates the threshold value, and wherein the threshold value is associated with the number of LBT failures.

3 . The WTRU of claim 1 , wherein the processor is configured to:

skip an UL transmission via the first cell, and wherein the UL transmission status for the first cell is configured to indicate that the UL transmission has been skipped.

4 . The WTRU of claim 1 , wherein the processor is configured to:

based on the LBT procedure indicating that the LBT failure is not detected, perform an UL transmission via the first cell.

5 . The WTRU of claim 1 , wherein the threshold value is a configured value, and wherein the threshold value is a maximum number of LBT failures.

6 . The WTRU of claim 1 , wherein the report comprises a medium access control (MAC) control element (CE).

7 . The WTRU of claim 1 , wherein the report is sent to the base station in at least one of a radio resource control (RRC) message or a MAC message.

8 . The WTRU of claim 1 , wherein to determine that the number of LBT failures associated with the first cell has reached the threshold value based on the detected LBT failure comprises the processor being configured to:

count the number of LBT failures associated with the first cell; and

determine that the number of LBT failures associated with the first cell is greater than or equal to the threshold value.

9 . A method implemented by a wireless transmit/receive unit (WTRU) comprising:

receiving an uplink (UL) grant for a first cell;

based on the reception of the UL grant, performing a listen before talk (LBT) procedure associated with the first cell;

based on the LBT procedure indicating an LBT failure, determining that a number of LBT failures associated with the first cell has reached a threshold value; and

based on the determination that the number of LBT failures associated with the first cell has reached the threshold value, transmitting a report to a base station, wherein the report is associated with an UL transmission status for the first cell, and wherein the report indicates that the threshold value has been reached.

10 . The method of claim 9 , wherein the method further comprises:

receiving a configuration for reporting an UL transmission status for the first cell, wherein the configuration indicates the threshold value, and wherein the threshold value is associated with the number of LBT failures.

11 . The method of claim 9 , wherein the method comprises:

skipping an UL transmission via the first cell, and wherein the UL transmission status for the first cell is configured to indicate that the UL transmission has been skipped.

12 . The method of claim 9 , wherein the method comprises:

based on the LBT procedure indicating that the LBT failure is not detected, performing an UL transmission via the first cell.

13 . The method of claim 9 , wherein the threshold value is a configured value, and wherein the threshold value is a maximum number of LBT failures.

14 . The method of claim 9 , wherein the report comprises a medium access control (MAC) control element (CE).

15 . The method of claim 9 , wherein the report is sent to the base station in at least one of a radio resource control (RRC) message or a MAC message.

16 . The method of claim 9 , wherein determining that the number of LBT failures associated with the first cell has reached the threshold value comprises:

counting the number of LBT failures associated with the first cell; and

determining that the number of LBT failures associated with the first cell is greater than or equal to the threshold value.

Continuity (8)
Continuation 17875064 · Jul 27, 2022
Continuation 16785309 · Feb 7, 2020
Continuation 16183277 · Nov 7, 2018
Continuation 15543794
Provisional Application 62204135 · Aug 12, 2015
Provisional Application 62160924 · May 13, 2015
Provisional Application 62108934 · Jan 28, 2015
Related Publication 20230353432A1 · Nov 2, 2023
References Cited (110)
US 8705398B2 · Koskela et al. · 2014 [cited by applicant]
US 9143299B2 · Seo et al. · 2015 [cited by applicant]
US 9603169B2 · Kim et al. · 2017 [cited by applicant]
US 9609666B2 · Sun et al. · 2017 [cited by applicant]
US 9762356B2 · Rudolf et al. · 2017 [cited by applicant]
US 9813208B2 · Kim et al. · 2017 [cited by applicant]
US 9872181B2 · Hwang et al. · 2018 [cited by applicant]
US 9949275B2 · Chen et al. · 2018 [cited by applicant]
US 9973310B2 · Noh et al. · 2018 [cited by applicant]
US 9986559B2 · Bontu et al. · 2018 [cited by applicant]
US 10129908B2 · Kwon et al. · 2018 [cited by applicant]
US 10171276B2 · Stern-Berkowitz et al. · 2019 [cited by applicant]
US 10182430B2 · Futaki · 2019 [cited by applicant]
US 10257863B2 · Bergström et al. · 2019 [cited by applicant]
US 10314059B2 · Lee et al. · 2019 [cited by applicant]
US 10362602B2 · Yang · 2019 [cited by applicant]
US 10531486B2 · Park et al. · 2020 [cited by applicant]
US 10630442B2 · Seo et al. · 2020 [cited by applicant]
US 10791027B2 · Sadek · 2020 [cited by applicant]
US 10849153B2 · Futaki · 2020 [cited by applicant]
US 11206619B2 · Lee et al. · 2021 [cited by applicant]
US 11405246B2 · Stern-Berkowitz et al. · 2022 [cited by applicant]
US 11502882B2 · Stern-Berkowitz et al. · 2022 [cited by applicant]
US 20100091726A1 · Ishii et al. · 2010 [cited by applicant]
US 20100329204A1 · Guo · 2010 [cited by examiner]
US 20110044297A1 · Lee et al. · 2011 [cited by applicant]
US 20110199944A1 · Chen et al. · 2011 [cited by applicant]
US 20120044906A1 · Chen et al. · 2012 [cited by applicant]
US 20120250631A1 · Hakola et al. · 2012 [cited by applicant]
US 20120307779A1 · Noh et al. · 2012 [cited by applicant]
US 20120314671A1 · Noh et al. · 2012 [cited by applicant]
US 20130039305A1 · Kishiyama et al. · 2013 [cited by applicant]
US 20130078913A1 · Lee et al. · 2013 [cited by applicant]
US 20130156014A1 · Kim et al. · 2013 [cited by applicant]
US 20130182618A1 · Chen et al. · 2013 [cited by applicant]
US 20130235804A1 · Kwon et al. · 2013 [cited by applicant]
US 20140254492A1 · Noh et al. · 2014 [cited by applicant]
US 20150003351A1 · Park et al. · 2015 [cited by applicant]
US 20150063151A1 · Sadek et al. · 2015 [cited by applicant]
US 20150296528A1 · Coffey et al. · 2015 [cited by applicant]
US 20160037365A1 · Makrakis et al. · 2016 [cited by applicant]
US 20160037510A1 · Park et al. · 2016 [cited by applicant]
US 20160050667A1 · Papasakellariou et al. · 2016 [cited by applicant]
US 20160066195A1 · Moon et al. · 2016 [cited by applicant]
US 20160073344A1 · Vutukuri et al. · 2016 [cited by applicant]
US 20160100420A1 · Chen et al. · 2016 [cited by applicant]
US 20160226632A1 · Zhang et al. · 2016 [cited by applicant]
US 20160227416A1 · Suzuki et al. · 2016 [cited by applicant]
US 20160309464A1 · Mukherjee et al. · 2016 [cited by applicant]
US 20160338107A1 · Zeng et al. · 2016 [cited by applicant]
US 20160360422A1 · Zhang et al. · 2016 [cited by applicant]
US 20170041803A1 · Shi et al. · 2017 [cited by applicant]
US 20170118728A1 · Harada et al. · 2017 [cited by applicant]
US 20170127389A1 · Nishikawa et al. · 2017 [cited by applicant]
US 20170230986A1 · Moon et al. · 2017 [cited by applicant]
US 20170238190A1 · Yang et al. · 2017 [cited by applicant]
US 20170257889A1 · Mukherjee · 2017 [cited by examiner]
US 20170311337A1 · Mo et al. · 2017 [cited by applicant]
US 20170332393A1 · Lee et al. · 2017 [cited by applicant]
US 20170339568A1 · Wang et al. · 2017 [cited by applicant]
US 20170339719A1 · Xu et al. · 2017 [cited by applicant]
US 20170347270A1 · Iouchi et al. · 2017 [cited by applicant]
US 20170374679A1 · Park et al. · 2017 [cited by applicant]
US 20180006788A1 · Lee et al. · 2018 [cited by applicant]
US 20180041906A1 · Jang et al. · 2018 [cited by applicant]
US 20180351704A1 · Papasakellariou et al. · 2018 [cited by applicant]
US 20210136594A1 · Futaki · 2021 [cited by applicant]
US 20230066772A1 · Myung · 2023 [cited by examiner]
CN 101669401A · 2010 [cited by applicant]
CN 102474486A · 2012 [cited by applicant]
CN 102857872A · 2013 [cited by applicant]
CN 103580840A · 2014 [cited by applicant]
CN 103875187A · 2014 [cited by applicant]
CN 104144484A · 2014 [cited by applicant]
CN 104254995A · 2014 [cited by applicant]
CN 112134670A · 2020 [cited by applicant]
EP 2651047A2 · 2013 [cited by applicant]
WO 2012164531A1 · 2012 [cited by applicant]
WO 2014181176A1 · 2014 [cited by applicant]
WO 2016072908A1 · 2016 [cited by applicant]
European Telecommunications Standards Institute (ETSI), EN 301 893 V1.7.1, “Broadband Radio Access Networks (BRAN), 5 GHz High Performance RLAN, Harmonized EN Covering the Essential Requirements of Article 3.2 of the R&… [cited by applicant]
3rd Generation Partnership Project (3GPP), R1-101773, “SRS Transmission in LTE-A”, CATT, 3GPP TSG RAN WG1 Meeting #60bis, Beijing, China, Apr. 12-16, 2010, 3 pages. [cited by applicant]
3rd Generation Partnership Project (3GPP), R1-102978, “Views on Detail Design of Dynamic Aperiodic SRS”, KDDI, 3GPP TSG RAN WG1 Meeting #61, Montreal, Canada, May 10-14, 2010, pp. 1-4. [cited by applicant]
3rd Generation Partnership Project (3GPP), R1-103486, “On Aperiodic SRS Transmission in LTE-A”, CATT, 3GPP TSG RAN WG1 Meeting #61 bis, Dresden, Germany, Jun. 28-Jul. 2, 2010, 4 pages. [cited by applicant]
3rd Generation Partnership Project (3GPP), R1-103710, “Email Discussion on Aspects of Dynamic Aperiodic SRS”, Texas Instruments, 3GPP TSG RAN WG1 #61bis, Dresden, Germany, Jun. 28-Jul. 2, 2010, pp. 1-7. [cited by applicant]
3rd Generation Partnership Project (3GPP), R1-104336, “Remaining Issues on Aperiodic SRS Transmission in LTE-A”, CATT, 3GPP TSG RAN WG1 Meeting #62, Madrid, Spain, Aug. 23-27, 2010, 3 pages. [cited by applicant]
3rd Generation Partnership Project (3GPP), R1-105849, “Configuration of Aperiodic SRS”, Huawei, HiSilicon, 3GPP TSG RAN WG1 Meeting #63, Jacksonville, USA, Nov. 15-19, 2010, 5 pages. [cited by applicant]
3rd Generation Partnership Project (3GPP), R1-105995, “Configuration for Dynamic Aperiodic SRS Triggering”, Alcatel-Lucent Shanghai Bell, Alcatel-Lucent, 3GPP TSG RAN WG1 Meeting #63, Jacksonville, USA, Nov. 15-19, 2010… [cited by applicant]
3rd Generation Partnership Project (3GPP), R1-110242, “Remaining Issues for Aperiodic SRS”, NTT DoCoMo, 3GPP TSG RAN WG1 Meeting #63bis, Dublin, Ireland, Jan. 17-21, 2011, pp. 1-4. [cited by applicant]
3rd Generation Partnership Project (3GPP), R1-110286, “Remaining Details of Aperiodic SRS”, Research in Motion, UK Limited, 3GPP TSG RAN WG1 Meeting #63bis, Dublin, Ireland, Jan. 17-21, 2011, 7 pages. [cited by applicant]
3rd Generation Partnership Project (3GPP), R1-110700, “Outstanding Aspects for Aperiodic SRS Configuration”, Texas Instruments, 3GPP TSG RAN WG1 #64, Taipei, Taiwan, Feb. 21-25, 2011, pp. 1-5. [cited by applicant]
3rd Generation Partnership Project (3GPP), R1-110739, “Remaining Issues for Aperiodic SRS in Rel.10”, Samsung, 3GPP TSG RAN WG1 #64, Taipei, Taiwan, Feb. 21-25, 2011, pp. 1-2. [cited by applicant]
3rd Generation Partnership Project (3GPP), R1-111670, “Further Discussion on Remaining Details of Aperiodic SRS for L TE Rel-10”, Motorola Mobility, 3GPP TSG RAN WG1 Meeting #65, Spain, Barcelona, May 9-13, 2011, pp. 1-… [cited by applicant]
3rd Generation Partnership Project (3GPP), R1-140067, “Remaining Details of L 1 Signaling for UL-DL Reconfiguration”, CATT, 3GPP TSG RAN WG1 Meeting #76, Prague, Czech Republic, Feb. 10-14, 2014, 5 pages. [cited by applicant]
3rd Generation Partnership Project (3GPP), R1-141518, “Remaining Issues for TDD-FOO CA”, ITL Inc., 3GPP TSG RAN WG1 Meeting #76bis, Shenzhen, China, Mar. 31-Apr. 4, 2014, 7 pages. [cited by applicant]
3rd Generation Partnership Project (3GPP), R1-143827, “Required Functionalities and Design Targets of LAA”, ZTE, 3GPP TSG-RAN1#78bis, Ljubljana, Slovenia, Oct. 6-10, 2014, pp. 1-7. [cited by applicant]
3rd Generation Partnership Project (3GPP), R1-144221, “Design Targets for LAA Using LTE”, Hitachi Ltd., 3GPP TSG RAN WG1 Meeting #78bis, Ljubljana, Slovenia, Oct. 6-10, 2014, pp. 1-4. [cited by applicant]
3rd Generation Partnership Project (3GPP), R1-144626, “Discontinuous Transmission on Scell for LAA”, CATT, 3GPP TSG RAN WG1 Meeting #79, San Francisco, USA, Nov. 17-21, 2014, 3 pages. [cited by applicant]
3rd Generation Partnership Project (3GPP), R1-144970, “Views on issues Related to LAA UL”, NTT DoCoMo, 3GPP TSG RAN WG1 Meeting #79, San Francisco, USA, Nov. 17-21, 2014, pp. 1-4. [cited by applicant]
3rd Generation Partnership Project (3GPP), TDOC R2-092947, “Increasing Reordering Depth for Dual Cell Operation with MIMO”, 3GPP TSG-RAN WG2 #66, Ericsson, San Francisco, USA, May 4-8, 2009, 5 pages. [cited by applicant]
3rd Generation Partnership Project (3GPP), TS 36.211 V12.1.0, “Technical Specification Group Radio Access Network, Evolved Universal Terrestrial Radio Access (E-UTRA), Physical Channels and Modulation (Release 12)”, Mar… [cited by applicant]
3rd Generation Partnership Project (3GPP), TS 36.211 V12.4.0, “Technical Specification Group Radio Access Network, Evolved Universal Terrestrial Radio Access (E-UTRA), Physical Channels and Modulation (Release 12)”, Dec… [cited by applicant]
3rd Generation Partnership Project (3GPP), TS 36.212 V12.0.0, “Technical Specification Group Radio Access Network, Evolved Universal Terrestrial Radio Access (E-UTRA), Multiplexing and Channel Coding (Release 12)”, Dec.… [cited by applicant]
3rd Generation Partnership Project (3GPP), TS 36.212 V12.3.0, “Technical Specification Group Radio Access Network, Evolved Universal Terrestrial Radio Access (E-UTRA), Multiplexing and Channel Coding (Release 12)”, Dec.… [cited by applicant]
3rd Generation Partnership Project (3GPP), TS 36.213 V11.9.0, “Technical Specification Group Radio Access Network, Evolved Universal Terrestrial Radio Access (E-UTRA), Physical layer procedures (Release 11)”, Dec. 2014,… [cited by applicant]
3rd Generation Partnership Project (3GPP), TS 36.213 V12.1.0, “Technical Specification Group Radio Access Network, Evolved Universal Terrestrial Radio Access (E-UTRA), Physical Layer Procedures (Release 12)”, Mar. 2014,… [cited by applicant]
3rd Generation Partnership Project (3GPP), TS 36.213 V12.4.0, “Technical Specification Group Radio Access Network, Evolved Universal Terrestrial Radio Access (E-UTRA), Physical Layer Procedures (Release 12)”, 2014, pp. … [cited by applicant]
3rd Generation Partnership Project (3GPP), TS 36.321 V12.4.0, “Technical Specification Group Radio Access Network, Evolved Universal Terrestrial Radio Access (E-UTRA), Medium Access Control (MAC) Protocol Specification … [cited by applicant]
3rd Generation Partnership Project (3GPP), TS 36.322 V12.1.1, “Technical Specification Group Radio Access Network, Evolved Universal Terrestrial Radio Access (E-UTRA), Radio Link Control (RLC) Protocol Specification (Re… [cited by applicant]
3rd Generation Partnership Project (3GPP), TS 36.331 V12.4.1, “Technical Specification Group Radio Access Network, Evolved Universal Terrestrial Radio Access (E-UTRA), Radio Resource Control (RRC), Protocol Specificatio… [cited by applicant]