IP Library › Granted Patent US 12,529,272
Granted Patent B2
US 12,529,272 · App. 18/773,840 · Granted Jan 20, 2026

Identifying lost-circulation events in downhole drilling systems

Inventors: Valerian Guillot (Montpellier, FR); Alexey Ruzhnikov (Al-Khobar, SA); Mauricio Corona (Al-Khobar, SA); Khalid Abdelsamed M. Talha (Dhahran, SA)
Assignee: Schlumberger Technology Corporation
E21B21/003E21B21/08E21B44/00
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,529,272
App. No.
18/773,840
Granted
Jan 20, 2026
Kind
B2
Abstract

A drilling fluid management system may measure drilling parameters for a downhole drilling system, the drilling parameters including standpipe pressure. A drilling fluid management system may determine, based on the drilling parameters, a mechanical specific energy (MSE). A drilling fluid management system may apply a changepoint model to the MSE and the standpipe pressure to identify a plurality of MSE segments and a plurality of pressure segments. A drilling fluid management system may identify an expected MSE and an expected pressure. A drilling fluid management system may identify an MSE segment having the segment MSE that differs from the expected MSE by an MSE threshold, and a pressure segment having the segment pressure that differs from the expected pressure by a pressure threshold. A drilling fluid management system may identify a lost-circulation period based on an overlap of the MSE segment and the pressure segment.

Claims (30)

1 . A method for identifying a lost-circulation event in a downhole drilling system, the method comprising:

measuring drilling parameters for the downhole drilling system, the drilling parameters including standpipe pressure;

determining, based on the drilling parameters, a mechanical specific energy (MSE);

applying a changepoint model to the MSE and the standpipe pressure to identify a plurality of MSE segments and a plurality of pressure segments, each MSE segment having a segment MSE and each pressure segment having a segment pressure;

identifying a lost-circulation period based on an overlap of a difference between an expected MSE and the segment MSE and an expected pressure and the segment pressure;

using the lost-circulation period, identifying a mitigating action, the mitigating action including an additive amount and an additive schedule of an additive to a drilling fluid; and

implementing the mitigating action by adding the additive to the drilling fluid with the additive amount and according to the additive schedule.

2 . The method of claim 1 , wherein measuring the drilling parameters includes measuring torque, rotation per minute (RPM), rate of penetration (ROP), and weight-on-bit (WOB), and wherein determining the MSE includes determining the MSE using the torque, the RPM, the ROP, and the WOB.

3 . The method of claim 1 , further comprising:

identifying the expected MSE for each MSE segment of the plurality of MSE segments and the expected pressure for each pressure segment of the plurality of pressure segments; and

identifying an MSE segment of the plurality of MSE segments having the segment MSE that differs from the expected MSE in the MSE segment by an MSE threshold, and a pressure segment of the plurality of pressure segments having the segment pressure that differs from the expected pressure in the pressure segment by a pressure threshold, and wherein identifying the lost-circulation period is based on the overlap of the MSE segment and the pressure segment.

4 . The method of claim 1 , wherein identifying the lost-circulation period includes identifying the lost-circulation period based on a period of time over which the segment MSE and the segment pressure overlap.

5 . The method of claim 1 , wherein the segment MSE and the segment pressure have at least one of a different start time, end time, or duration.

6 . The method of claim 1 , wherein an MSE quantity of the plurality of MSE segments is different than a pressure quantity of the plurality of pressure segments.

7 . The method of claim 1 , wherein identifying the lost-circulation period includes identifying a void.

8 . A downhole drilling system, comprising:

a plurality of drilling parameter sensors; and

a processor and memory, the memory including instructions that cause the processor to:

measure drilling parameters with the plurality of drilling parameter sensors, the drilling parameters including standpipe pressure;

determine, based on the drilling parameters, a mechanical specific energy (MSE);

apply a changepoint model to the MSE and the standpipe pressure to identify a plurality of MSE segments and a plurality of pressure segments, each MSE segment having a segment MSE and each pressure segment having a segment pressure;

identify a lost-circulation period based on an overlap of a difference between an expected MSE and the segment MSE and an expected pressure and the segment pressure;

using the lost-circulation period, identifying a mitigating action, the mitigating action including an additive amount and an additive schedule of an additive to a drilling fluid; and

implementing the mitigating action by adding the additive to the drilling fluid with the additive amount and according to the additive schedule.

9 . The downhole drilling system of claim 8 , wherein measuring the drilling parameters includes measuring torque, rotation per minute (RPM), rate of penetration (ROP), and weight-on-bit (WOB), and wherein determining the MSE includes determining the MSE using the torque, the RPM, the ROP, and the WOB.

10 . The downhole drilling system of claim 8 , wherein the instructions further cause the processor to:

identify the expected MSE for each MSE segment of the plurality of MSE segments and the expected pressure for each pressure segment of the plurality of pressure segments; and

identify an MSE segment of the plurality of MSE segments having the segment MSE that differs from the expected MSE in the MSE segment by an MSE threshold, and a pressure segment of the plurality of pressure segments having the segment pressure that differs from the expected pressure in the pressure segment by a pressure threshold, and wherein identifying the lost-circulation period is based on the overlap of the MSE segment and the pressure segment.

11 . The downhole drilling system of claim 8 , wherein identifying the lost-circulation period includes identifying the lost-circulation period based on a period of time over which the segment MSE and the segment pressure overlap.

12 . The downhole drilling system of claim 8 , wherein the segment MSE and the segment pressure have at least one of a different start time, end time, or duration.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 17, 2024
From: GUILLOT, VALERIAN; RUZHNIKOV, ALEXEY; CORONA, MAURICIO; TALHA, KHALID ABDELSAMED M.
To: SCHLUMBERGER TECHNOLOGY CORPORATION
Reel/Frame 068005/0001 →
Continuity (2)
Provisional Application 63593584 · Oct 27, 2023
Related Publication 20250137334A1 · May 1, 2025
References Cited (6)
US 11795814B2 · Verma · 2023 [cited by applicant]
US 20220120176A1 · Gutarov · 2022 [cited by examiner]
US 20220364424A1 · Canizares · 2022 [cited by examiner]
AU 2020286411A1 · 2022 [cited by applicant]
CA 2734642C · 2018 [cited by applicant]
Veena S. Vezhapparambu et al., Estimating the blast sill thickness using changepoint analysis of MWD data, International Journal of Rock Mechanics and Mining Sciences, vol. 134, Oct. 2020, 104443. [cited by applicant]