IP Library › Granted Patent US 12,539,781
Granted Patent B2
US 12,539,781 · App. 17/623,523 · Granted Feb 3, 2026

Management device and power supply system

Inventor: Yohei Ishii (Osaka, JP)
Assignee: PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO., LTD.
B60L53/62B60L58/13H02J7/0013H02J7/0048H02J7/0063H02J7/00716
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,539,781
App. No.
17/623,523
Granted
Feb 3, 2026
Kind
B2
Abstract

In a management device that manages a parallel system for power storage where a plurality of series-connected cell groups are connected in parallel, controller ( 16 ) derives deviations of currents flowing through the plurality of series-connected cell groups, and calculates an upper limit value of a charging current or charging power of the whole parallel system or an upper limit value of a discharging current or discharging power of the whole parallel system based on the derived current deviations. Controller ( 16 ) adjusts the upper limit value by multiplying the upper limit value by a coefficient α (0≤α≤1) in accordance with a condition at a time of deriving the current deviations.

Claims (40)

1 . A management device that manages a parallel system for power storage where a plurality of cell groups are connected in parallel, the plurality of cell groups each including cells connected in series, the management device comprising:

a measurement unit that measures voltages, currents, and temperatures of the cells in each of the plurality of cell groups in the parallel system; and

a controller configured to derive deviations of currents flowing through the plurality of cell groups, and configured to calculate an upper limit value based on the deviations, the upper limit value being any one of (i) an upper limit value of a charging current of the parallel system, (ii) an upper limit value of charging power of the parallel system, (iii) an upper limit value of a discharging current of the parallel system, and (iv) an upper limit value of discharging power of the parallel system,

wherein the controller is configured to adjust the upper limit value by multiplying the upper limit value by a coefficient which takes between 0 and 1 inclusive in accordance with a condition at a time of deriving the deviations,

the controller is configured to derive each of the deviations from a measurement value of a current flowing through a corresponding one of the plurality of cell groups when an absolute value of a measurement value of a current flowing through a whole of the parallel system is larger than a set value, and to derive each of the deviations based on prediction from an internal state of a corresponding one of the plurality of cell groups when the absolute value of the measurement value of the current flowing through the whole of the parallel system is equal to or less than the set value, and

the controller is configured to set the coefficient in a case where the deviation is derived based on the prediction from the internal state lower than the coefficient in a case where the deviation is derived from the measurement value of the current.

2 . The management device according to claim 1 , wherein

the controller is configured to derive each of the deviations from the measurement value of the current flowing through the corresponding one of the plurality of cell groups, and

the controller is configured to set the coefficient lower as an absolute value of the measured current is smaller.

3 . The management device according to claim 1 , wherein

the controller is configured to derive the deviations based on prediction from internal states of the plurality of cell groups, and

the controller is configured to set the coefficient lower when states of charge (SOCs) of the plurality of cell groups do not fall within a predetermined range.

4 . The management device according to claim 1 , wherein the controller is configured to set the coefficient lower as states of health (SOHs) of the plurality of cell groups are lower.

5 . The management device according to claim 1 , wherein the controller is configured to set the coefficient lower as temperatures of the plurality of cell groups are lower.

6 . A power supply system comprising:

the management device according to claim 1 that manages the parallel system; and

the parallel system for power storage where a plurality of cell groups are connected in parallel.

7 . The power supply system according to claim 6 , wherein

the power supply system is mounted on an electric vehicle, and

the management device notifies the upper limit value to a vehicle controller in the electric vehicle.

8 . A management device that manages a parallel system for power storage where a plurality of cell groups are connected in parallel, the plurality of cell groups each including cells connected in series, the management device comprising:

a measurement unit that measures voltages, currents, and temperatures of the cells in each of the plurality of cell groups in the parallel system; and

a controller configured to derive deviations of currents flowing through the plurality of cell groups, and configured to calculate an upper limit value based on the deviations, the upper limit value being any one of (i) an upper limit value of a charging current of the parallel system, (ii) an upper limit value of charging power of the parallel system, (iii) an upper limit value of a discharging current of the parallel system, and (iv) an upper limit value of discharging power of the parallel system,

wherein the controller is configured to adjust the upper limit value by multiplying the upper limit value by a coefficient which takes between 0 and 1 inclusive in accordance with a condition at a time of deriving the deviations,

the controller is configured to derive the deviations from the measurement values of the currents flowing through the plurality of cell groups, and

the controller is configured to set the coefficient lower as a value of a change in the measured current is larger.

9 . The management device according to claim 8 , wherein

the controller is configured to derive each of the deviations from the measurement value of the current flowing through the corresponding one of the plurality of cell groups, and

the controller is configured to set the coefficient lower as an absolute value of the measured current is smaller.

10 . The management device according to claim 8 , wherein

the controller is configured to derive the deviations based on prediction from internal states of the plurality of cell groups, and

the controller is configured to set the coefficient lower when states of charge (SOCs) of the plurality of cell groups do not fall within a predetermined range.

11 . The management device according to claim 8 , wherein the controller is configured to set the coefficient lower as states of health (SOHs) of the plurality of cell groups are lower.

12 . The management device according to claim 8 , wherein the controller is configured to set the coefficient lower as temperatures of the plurality of cell groups are lower.

13 . A power supply system comprising:

the management device according to claim 4 that manages the parallel system; and

the parallel system for power storage where a plurality of cell groups are connected in parallel.

14 . The power supply system according to claim 13 , wherein

the power supply system is mounted on an electric vehicle, and

the management device notifies the upper limit value to a vehicle controller in the electric vehicle.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 15, 2022
From: ISHII, YOHEI
To: PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO., LTD.
Reel/Frame 059020/0168 →
Priority Claims (1)
JP 2019-132527 · Jul 18, 2019 · national
Continuity (1)
Related Publication 20220355700A1 · Nov 10, 2022
References Cited (14)
US 20100244846A1 · Desprez · 2010 [cited by examiner]
US 20140062409A1 · Endo · 2014 [cited by examiner]
US 20140139189A1 · Izumi · 2014 [cited by examiner]
US 20150280466A1 · Owen · 2015 [cited by examiner]
US 20150338466A1 · Wu · 2015 [cited by examiner]
US 20160169977A1 · Fukuhara · 2016 [cited by examiner]
US 20170070069A1 · Li · 2017 [cited by examiner]
US 20170334425A1 · Kato · 2017 [cited by examiner]
US 20180045788A1 · Kawai · 2018 [cited by examiner]
US 20180292462A1 · Itabashi · 2018 [cited by examiner]
US 20200176829A1 · Nishikawa et al. · 2020 [cited by applicant]
JP 2018129190 · 2018 [cited by applicant]
WO 2019049571 · 2019 [cited by applicant]
International Search Report of PCT application No. PCT/JP2020/024754 dated Aug. 25, 2020. [cited by applicant]