Power operation methodology for electric pressure control equipment
A method includes selecting an operation mode for a pressure control equipment and determining whether a power distribution system has sufficient power available to support the selected operation mode.
1 . A method comprising:
selecting an operation mode from a plurality of operation modes for a pressure control equipment, wherein the pressure control equipment comprises a blowout preventer (BOP) system, and wherein the plurality of operation modes comprise:
a test mode, wherein the test mode is configured to test one or more functions of the BOP system to ensure that the one or more functions are working properly;
a drill mode, wherein the drill mode is configured to support drilling operations of the BOP system; and
an emergency mode, wherein the emergency mode is configured to initiate an automatic safety operation configured to shut in a wellbore; and
determining whether a power distribution system has sufficient power available to support the selected operation mode.
2 . The method of claim 1 , wherein selecting the operation mode for the BOP system comprises selecting the test mode for the BOP system.
3 . The method of claim 2 , wherein the test mode is configured to operate a reduced number of the one or more functions of the BOP system as compared to the drilling operations.
4 . The method of claim 1 , wherein selecting the operation mode for the BOP system comprises selecting the drill mode for the BOP system.
5 . The method of claim 4 , wherein the drill mode is configured to operate the BOP system using a rig power of the power distribution system until the rig power can no longer meet a power need of the BOP system.
6 . The method of claim 1 , wherein selecting the operation mode for the BOP system comprises selecting the emergency mode for the BOP system.
7 . The method of claim 6 , wherein a power source of the power distribution system used to support the emergency mode is separate from additional power sources of the power distribution system used to support the test mode and the drill mode.
8 . The method of claim 1 ,
wherein the BOP system is in communication with a processing system, and
wherein the power distribution system is connected to the processing system, the power distribution system comprising:
rig power;
a stored electrical energy system; and
at least one power generator.
9 . The method of claim 8 , wherein the stored electrical energy system comprises at least one of: a battery; a supercapacitor; or a hydrogen fuel cell.
10 . The method of claim 8 , wherein selecting the operation mode comprises selecting the test mode for the BOP system, wherein the one or more functions comprise:
running the test mode with the rig power; and
recharging the stored electrical energy system, wherein the stored electrical energy system comprises at least one of a battery, a supercapacitor, or a hydrogen fuel cell.
11 . The method of claim 8 ,
wherein selecting the operation mode comprises selecting the drill mode for the BOP system;
wherein determining whether the power distribution system has sufficient power comprises using the processing system to evaluate a power need of the BOP system; and
wherein the drilling operations of the BOP system comprise:
operating the BOP system in the drill mode using the rig power until the rig power can no longer meet the power need of the BOP system; and
operating the BOP system using the stored electrical energy system as a back-up to the rig power, wherein the stored electrical energy system comprises at least one of a battery, a supercapacitor, or a hydrogen fuel cell.
12 . The method of claim 8 ,
wherein selecting the operation mode comprises selecting the emergency mode for the BOP system;
wherein determining whether the power distribution system has sufficient power comprises using the processing system to determine whether there is sufficient power available to support the emergency mode; and
wherein the method further comprises:
initiating an emergency sequence; and
performing the emergency sequence using at least one of: the stored electrical energy system; the rig power; or the at least one power generator, wherein the stored electrical energy system comprises at least one of a battery, a supercapacitor, or a hydrogen fuel cell.
13 . The method of claim 12 , further comprising using the rig power to trickle charge at least a portion of the stored electrical energy system.
14 . The method of claim 12 , wherein the emergency sequence comprises at least one of a Deadman operation, an automatic shearing operation, an automatic disconnect operation, or an acoustic operation.
15 . The method of claim 1 , wherein the BOP system is electrically actuated and comprises at least one of a BOP, a BOP stack, or a BOP control system.