IP Library Granted Patent US 12,553,319
Granted Patent B2
US 12,553,319 · App. 18/721,728 · Granted Feb 17, 2026

Flexible gas lift optimization

Inventor: Ahmed Mohamed M. Ismail (Abu Dhabi, AE)
Assignee: Abu Dhabi Company for Onshore Petroleum Operations Limited
E21B43/122E21B47/10
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,553,319
App. No.
18/721,728
Granted
Feb 17, 2026
Kind
B2
Abstract

A method comprises the steps of selecting a group of wells; defining a production target rate for the group; allocating wells operated with gas lift to a first sub-group; allocating wells operated without gas lift to a second sub-group; setting a production target rate for the first sub-group and conducting gas lift parameter optimization for at least one well of the first sub-group to obtain the production target rate for the first sub-group, and transmitting control signals to wells of the first sub-group to operate the at least one well under condition of at least one optimized gas lift parameter; monitoring the production rate of the first sub-group, and setting a production target rate for the second sub-group to obtain the difference between the production target rate for the group and the production rate of the first sub-group, and transmitting adjustment signals to the wells of the second sub-group.

Claims (40)

1 . A method for operating wells of an oilfield comprising the following steps:

(a) selecting a group of wells of an oilfield;

(b) defining a production target rate for the group of wells;

(c) allocating wells being operated with gas lift to a first sub-group of the group of wells;

(d) allocating wells being operated without gas lift to a second sub-group of the group of wells;

(e) setting a production target rate for the first sub-group and conducting gas lift parameter optimization for at least one well of the first sub-group to obtain the production target rate for the first sub-group, and transmitting control signals to wells of the first sub-group to operate the at least one well under condition of at least one optimized gas lift parameter;

(f) monitoring the production rate of the first sub-group;

(g) setting a production target rate for the second sub-group to obtain the difference between the production target rate for the group of wells and the production rate of the first sub-group, and transmitting adjustment signals to the wells of the second sub-group.

2 . The method according to claim 1 , wherein the method further comprises continuously repeating the setting of the production target rate for the second sub-group such that a stable production rate for the group of wells is obtained.

3 . The method according to claim 1 , wherein the method further comprises a step of conducting gas lift parameter optimization for at least one well of the first sub-group to obtain the production target rate for the first sub-group, if the monitored production rate of the first sub-group does not meet the production target rate for the first sub-group, and preferably transmitting correction signals to the wells of the first sub-group to operate the at least one well under condition of the at least one optimized gas lift parameter.

4 . The method according to claim 3 , wherein the method further comprises a step of identifying if the production target rate for the first sub-group was not achieved by means of gas lift parameter optimization and returning to step (e) if the production target rate for the first sub-group was not achieved by means of gas lift parameter optimization.

5 . The method according to claim 1 , wherein the gas lift parameter optimization optimizes a gas lift injection rate, wherein the gas lift injection rate is optionally in a range between 0.4 and 1.5 kscf/day, further optionally between 0.5 and 1.0 kscf/day and even further optionally between 0.6 and 0.8 kscf/day.

6 . The method according to claim 1 , wherein the gas lift parameter optimization optimizes an oil flow rate, wherein the oil flow rate is optionally in a range between 100 and 1000 barrels/day further optionally between 150 and 900 barrels/day and even further optionally between 200 and 800 barrels/day.

7 . The method according to claim 1 , wherein the gas lift parameter optimization optimizes a ratio of an oil flow rate to a gas lift injection rate, wherein the ratio of an oil flow rate to a gas lift injection rate is optionally in a range between 100 and 2500 barrel/kscf, further optionally between 150 and 1800 barrel/kscf and even further optionally between 250 and 1300 barrel/kscf.

8 . The method according to claim 1 , wherein the gas lift parameter optimization optimizes a value for the differentiation of an oil flow rate with respect to a gas lift injection rate.

9 . The method according to claim 1 , wherein the gas lift parameter optimization optimizes a value for the differentiation of an oil flow rate with respect to a gas lift injection rate, wherein the value for the differentiation of an oil flow rate with respect to a gas lift injection rate is positive and/or not zero.

10 . The method according to claim 1 , wherein the wells being operated without gas lift are naturally flowing wells.

11 . The method according to claim 1 , wherein the method further comprises a step (d1) of transferring a well from the second sub-group to the first sub-group if at least one predefined threshold for the well is exceeded or undershot, wherein the threshold may be that a water cut value is higher than 40%, optionally higher than 45%, and further optionally higher than 50%.

12 . The method according to claim 1 , wherein the method further comprises a step (h) of repeating at least one of the steps (a), (b), (c), (d), (d1), (e), (f), (f1), (f2), (g).

13 . The method according to claim 1 , wherein the production target rate for the first sub-group is set to the production target rate for the entire group.

14 . A computer program, comprising instructions that when carried out by at least one processor, cause the at least one processor to perform for performing a method according to claim 1 .

15 . A non-transitory computer readable medium having stored thereon software instructions that, when carried out by at least one processor, cause the processor to perform for performing a method according to claim 1 .

16 . A control unit for operating wells of an oilfield, the control unit comprising at least one processor and a memory coupled with the at least one processor; the at least one processor and memory configured to perform a method according to claim 1 .

17 . An oilfield comprising a control unit according to claim 16 operated to perform a method comprising the following steps:

(a) selecting a group of wells of an oilfield;

(b) defining a production target rate for the group of wells;

(c) allocating wells being operated with gas lift to a first sub-group of the group of wells;

(d) allocating wells being operated without gas lift to a second sub-group of the group of wells;

(e) setting a production target rate for the first sub-group and conducting gas lift parameter optimization for at least one well of the first sub-group to obtain the production target rate for the first sub-group, and transmitting control signals to wells of the first sub-group to operate the at least one well under condition of at least one optimized gas lift parameter;

(f) monitoring the production rate of the first sub-group;

(g) setting a production target rate for the second sub-group to obtain the difference between the production target rate for the group of wells and the production rate of the first sub-group, and transmitting adjustment signals to the wells of the second sub-group.

18 . A method for operating wells of an oilfield comprising the following steps:

(a) selecting a group of wells of an oilfield;

(b) defining a production target rate for the group of wells;

(c) allocating wells being operated with gas lift to a first sub-group of the group of wells;

(d) allocating wells being operated without gas lift to a second sub-group of the group of wells;

(e) setting a production target rate for the first sub-group;

(f) monitoring the production rate of the first sub-group;

(g) setting a production target rate for the second sub-group, to obtain the difference between the production target rate for the group of wells and the production rate of the first sub-group, continuously repeating the setting of the production target rate for the second sub-group such that a stable production rate for the group of wells is obtained, and transmitting adjustment signals to the wells of the second sub-group.

19 . The method according to claim 18 , wherein gas lift parameter optimization for at least one well of the first sub-group is conducted to obtain the production target rate for the first sub-group, and preferably transmitting control signals to the wells of the first sub-group to operate the at least one well under condition of the at least one optimized gas lift parameter.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 15, 2025
From: ISMAIL, AHMED MOHAMED M.
To: ABU DHABI COMPANY FOR ONSHORE PETROLEUM OPERATIONS LIMITED
Reel/Frame 072575/0362 →
Continuity (1)
Related Publication 20250059861A1 · Feb 20, 2025
References Cited (12)
US 5871048A · Tokar et al. · 1999 [cited by applicant]
US 8670966B2 · Rashid · 2014 [cited by examiner]
US 10880625B2 · Sassi · 2020 [cited by examiner]
US 11459862B2 · Watson · 2022 [cited by examiner]
US 11551106B2 · Maucec · 2023 [cited by examiner]
US 20050199391A1 · Cudmore · 2005 [cited by examiner]
US 20160153266A1 · Rashid et al. · 2016 [cited by applicant]
US 20200199977A1 · De Mattia et al. · 2020 [cited by applicant]
EP 2991007A1 · 2016 [cited by applicant]
WO 2005085589A1 · 2005 [cited by applicant]
WO 2014169000A1 · 2014 [cited by applicant]
International Search Report and Written Opinion issued for corresponding International Patent Application No. PCT/IB2021/062374, mailed Sep. 20, 2022. [cited by applicant]