IP Library › Granted Patent US 12,604,338
Granted Patent B2
US 12,604,338 · App. 18/272,491 · Granted Apr 14, 2026

Handling downlink and uplink collisions in half duplex frequency division duplex user equipment

Inventors: Kittipong Kittichokechai (Järfälla, SE); Yi-Pin Eric Wang (Fremont, CA); Johan Bergman (Stockholm, SE); Mohammad Mozaffari (Fremont, CA); Anders Wallén (Ystad, SE); Saeedeh Moloudi (Linköping, SE)
Assignee: Telefonaktiebolaget LM Ericsson (publ)
H04W72/569H04W72/11
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,604,338
App. No.
18/272,491
Granted
Apr 14, 2026
Kind
B2
Abstract

A method performed by user equipment, UE, includes receiving a DL reception and transmitting an UL transmission, wherein there is a collision between the DL reception and the UL transmission. The method also includes prioritizing for processing the DL reception or the UL transmission by applying a particular prioritization rule of a plurality of prioritization rules depending upon a type of the DL reception and/or the UL transmission. The method further includes processing the DL reception or the UL transmission in response to applying the particular prioritization rule.

Claims (42)

1 . A method performed by user equipment (UE) comprising:

receiving a downlink (DL) reception and transmitting an uplink (UL) transmission, wherein there is a collision between the DL reception and the UL transmission;

prioritizing for processing the DL reception or the UL transmission by applying a particular prioritization rule of a plurality of prioritization rules depending upon a type of the DL reception and/or the UL transmission;

processing the DL reception or the UL transmission in response to applying the particular prioritization rule, wherein prioritizing for processing the DL reception or UL transmission comprises prioritizing a dynamically scheduled DL reception by the UE in response to the UE being dynamically scheduled with the DL reception and semi-statically configured with a UL transmission occasion which overlap in time; and

canceling the UL transmission if the UL transmission occasion starts later than Tproc, 2 after an end of a downlink control information (DCI) scheduling the DL reception.

2 . The method of claim 1 , wherein prioritizing for processing the DL reception or UL transmission comprises prioritizing an earlier of the DL reception or the UL transmission; and wherein the method further comprises:

processing the earlier of the DL reception or the UL transmission until the processing is complete; and

processing another DL reception or UL transmission after completing the processing of the earlier of the DL reception or the UL transmission plus a predetermined switching time.

3 . The method of claim 1 , wherein prioritizing for processing the DL reception or UL transmission comprises prioritizing the DL reception or the UL transmission which is scheduled later in time in response to the UE being dynamically scheduled with the DL reception and the UL transmission which overlap in time domain, the method further comprising:

canceling processing of the DL reception or the UL transmission scheduled earlier in time.

4 . The method of claim 3 , wherein the DCI of the DL reception or the UL transmission which is scheduled later in time comprises an explicit cancellation indication to indicate to the UE to cancel an earlier scheduled one of the UL transmission or the DL reception.

5 . The method of claim 1 , wherein the UE prioritizes processing an earlier of the UL transmission or the DL reception in response to the UL transmission occasion not starting later than Tproc, 2 after the end of the DCI scheduling the DL reception or the UE does not expect to receive the dynamically scheduled DL reception.

6 . The method of claim 1 , wherein prioritizing for processing the DL reception or UL transmission comprises prioritizing a dynamically scheduled DL reception in response to the UE being dynamically scheduled with the DL reception and semi-statically configured with a UL transmission occasion which overlap in time, the method further comprising:

canceling processing of the UL transmission, if any, in symbols occurring after a number of symbols that is larger than or equal to Tproc, 2 after an end of DCI scheduling the DL reception.

7 . The method of claim 1 , wherein prioritizing for processing the DL reception or UL transmission comprises prioritizing by the UE a dynamically scheduled UL transmission in response to the UE being dynamically scheduled with the UL transmission and semi-statically configured with the DL reception occasion which overlap in time, the method further comprising:

ignoring or canceling processing of the DL reception occasion if the DL reception starts later than Tproc, 2 after the end of the DCI, otherwise, the UE prioritizes processing an earlier transmission or reception, or alternatively, the UE does not expect to transmit the dynamically scheduled UL transmission.

8 . The method of claim 1 , wherein prioritizing for processing the DL reception or UL transmission comprises prioritizing by the UE dynamically scheduled UL transmission in response to the UE being dynamically scheduled with the UL transmission and semi-statically configured with a DL reception occasion which overlap in time, the method further comprising:

canceling or ignoring processing of the DL reception occasion in symbols that occur after a number of symbols larger than or equal to Tproc, 2.

9 . The method of claim 1 , wherein prioritizing for processing the DL reception or UL transmission comprises prioritizing by the UE the UL transmission or the DL reception that starts earlier in overlapped occasions in response to the UE being configured to have both CG PUSCH and SPS PDSCH where one or more transmission and reception occasions overlap due to different periodicities in the uplink and the downlink, the method further comprising:

canceling or ignoring the UL transmission or DL reception that starts later in the overlapped occasion.

10 . The method of claim 9 , wherein canceling or ignoring the UL transmission or the DL reception comprises canceling an overlapped part of the UL transmission or DL reception.

11 . The method of claim 9 , canceling or ignoring the UL transmission or the DL reception comprises canceling at least one additional OFDM symbol to facilitate a downlink-to-uplink or an uplink-to-downlink switching.

12 . The method of claim 1 , wherein prioritizing for processing the DL reception or UL transmission comprises prioritizing by the UE the UL transmission or the DL reception that has a higher priority in overlapped occasions in response to the UE being configured to have both CG PUSCH and SPS PDSCH where one or more transmission and reception occasions overlap due to different periodicities in the uplink and the downlink, the method further comprising:

canceling or ignoring the UL transmission or the DL reception with a lower priority in an overlapped occasion.

13 . The method of claim 12 , wherein the canceling or ignoring comprises canceling an overlapped part of the UL transmission or the DL reception.

14 . The method of claim 12 , wherein the canceling or ignoring comprises canceling at least one additional OFDM symbol to facilitate downlink-to-uplink or uplink-to-downlink switching.

15 . The method of claim 1 , further comprising receiving, by the UE, any DL reception from a network node, or transmitting, by the UE, any UL transmission to a network node, that has been partially or completely canceled, ignored, or dropped.

16 . The method of claim 1 , further comprising receiving any DL data, or transmitting any UL data as a dynamic HARQ retransmission.

17 . The method of claim 1 , further comprising transmitting, by the UE, a HARQ-ACK feedback message in response to any DL data or any UL data being partially or completely canceled, ignored, or dropped by the UE.

18 . A communication device comprising:

processing circuitry; and

memory coupled with the processing circuitry, wherein the memory includes instructions that when executed by the processing circuitry causes the communication device to perform operations according to claim 1 .

19 . A communication device adapted to perform according to:

receive a downlink (DL) reception and transmitting an uplink (UL) transmission, wherein there is a collision between the DL reception and the UL transmission;

prioritize for processing the DL reception or the UL transmission by applying a particular prioritization rule of a plurality of prioritization rules depending upon a type of the DL reception and/or the UL transmission;

process the DL reception or the UL transmission in response to applying the particular prioritization rule, wherein prioritizing for processing the DL reception or UL transmission comprises prioritizing a dynamically scheduled DL reception by a user equipment (UE) in response to the UE being dynamically scheduled with the DL reception and semi-statically configured with a UL transmission occasion which overlap in time; and

cancel the UL transmission if the UL transmission occasion starts later than Tproc, 2 after an end of a downlink control information (DCI) scheduling the DL reception.

20 . A computer program product comprising a non-transitory storage medium including program code to be executed by processing circuitry of a communication device, whereby execution of the program code causes the communication device to perform operations according to:

receive a downlink (DL) reception and transmitting an uplink (UL) transmission, wherein there is a collision between the DL reception and the UL transmission;

prioritize for processing the DL reception or the UL transmission by applying a particular prioritization rule of a plurality of prioritization rules depending upon a type of the DL reception and/or the UL transmission;

process the DL reception or the UL transmission in response to applying the particular prioritization rule, wherein prioritizing for processing the DL reception or UL transmission comprises prioritizing a dynamically scheduled DL reception by a user equipment (UE) in response to the UE being dynamically scheduled with the DL reception and semi-statically configured with a UL transmission occasion which overlap in time; and

cancel the UL transmission if the UL transmission occasion starts later than Tproc, 2 after an end of a downlink control information (DCI) scheduling the DL reception.

Assignments (2)
CORRECTIVE ASSIGNMENT TO CORRECT THE 2ND INVENTOR NAME AND RECEIVING PARTY NAME PREVIOUSLY RECORDED AT REEL: 064262 FRAME: 0060. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Aug 4, 2023
From: KITTICHOKECHAI, KITTIPONG; WANG, YI-PIN ERIC; BERGMAN, JOHAN; MOZAFFARI, MOHAMMAD; WALLÉN, ANDERS; MOLOUDI, SAEEDEH
To: TELEFONAKTIEBOLAGET LM ERICSSON (PUBL)
Reel/Frame 064501/0688 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 14, 2023
From: KITTICHOKECHAI, KITTIPONG; WANG, YI-PEN ERIC; BERGMAN, JOHAN; MOZAFFARI, MOHAMMAD; WALLÉN, ANDERS; MOLOUDI, SAEEDEH
To: TELEFONAKTIEBOLAGET ERICSSON LM (PUBL)
Reel/Frame 064262/0060 →
Continuity (2)
Provisional Application 63138784 · Jan 18, 2021
Related Publication 20240080878A1 · Mar 7, 2024
References Cited (16)
US 20210136795A1 · Saber · 2021 [cited by examiner]
US 20210168783A1 · Islam · 2021 [cited by examiner]
US 20230189255A1 · Bagheri · 2023 [cited by examiner]
US 20230189260A1 · Bae · 2023 [cited by examiner]
WO 2017078465A1 · 2017 [cited by applicant]
WO WO2020033660A1 · 2020 [cited by examiner]
International Search Report and Written Opinion of the International Searching Authority, PCT/EP2022/050926, mailed May 16, 2022, 10 pages. [cited by applicant]
Asia Pacific Telecom, Discussion on potential UE complexity reduction features, 3GPP TSG-RAN WG1 Meeting #101, R1-2004536, e-Meeting, May 25-Jun. 5, 2020, 3 pages. [cited by applicant]
Ericsson, “PUR—Remaining open issues,” 3GPP TSG-RAN WG2 #108, Tdoc R2-1915407, Reno, Nevada, United States, Nov. 18-22, 2019, 7 pages. [cited by applicant]
LG Electronics, “HD-FDD support for low-cost MTC,” 3GPP TSG RAN WG1 Meeting #76bis, R1-141334, Shenzhen, China, Mar. 31-Apr. 4, 2014, 4 pages. [cited by applicant]
3GPP TS 36.211 v16.4.0 (Dec. 2020); 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical channels and modulation (Release … [cited by applicant]
3GPP TS 38.211 v16.4.0 (Dec. 2020); 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Physical channels and modulation (Release 16), 133 pages. [cited by applicant]
Ericsson et al., “New WID on support of reduced capability NR devices,” 3GPP TSG RAN Meeting #90e, RP-202933, Electronic Meeting, Dec. 7-11, 2022, 5 pages. [cited by applicant]
3GPP TR 38.875 v1.0.0 (Dec. 2020); 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Study on support of reduced capability NR devices (Release 17), 112 pages. [cited by applicant]
3GPP TS 38.214 v16.4.0 (Dec. 2020); 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Physical layer procedures for data (Release 16), 169 pages. [cited by applicant]
Nokia et al., “Maintenance of Rel-16 URLLC UCI enhancements,” R1-2001695, 3GPP TSG RAN WG1 Meeting #100bis-e, e-Meeting, Apr. 20 - 30, 2020, 27 pages. [cited by applicant]