IP Library › Granted Patent US 12,610,291
Granted Patent B2
US 12,610,291 · App. 17/875,777 · Granted Apr 21, 2026

Methods and devices for updating IAB-node configuration information during inter-donor migration

Inventors: Kun Cao (Shenzhen, CN); Ying Huang (Shenzhen, CN); Lin Chen (Shenzhen, CN)
Assignee: ZTE CORPORATION
H04W36/0064
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,610,291
App. No.
17/875,777
Granted
Apr 21, 2026
Kind
B2
Abstract

The present disclosure describes methods, systems, and devices for updating configuration information for a migrating integrated access backhaul node (IAB-node) during an inter-donor migration from a source IAB-donor to a target IAB-donor. One method includes providing, by a target IAB-donor central unit (CU), configuration information for a migrating IAB-node distributed unit (DU) in a dedicated radio resource control (RRC) message during handover preparation. The method further includes sending, by the target IAB-donor CU, a XnAP message to a source IAB-donor CU, the XnAP message comprising the configuration information as an RRC transparent container, and then the source IAB-donor CU sends the dedicated RRC message to a migrating IAB-node mobile termination (MT), the dedicated RRC message comprising the configuration information.

Claims (26)

1 . A method for wireless communication, comprising:

updating configuration information for a migrating integrated access backhaul node (IAB-node) during an inter-donor migration from a source IAB-donor to a target IAB-donor by:

sending, by a target IAB-donor central unit (CU), a F1-AP message to a migrating IAB-node distributed unit (DU), the F1-AP message comprising new configuration information comprising a new radio (NR) cell global identifier (CGI),

wherein:

the F1-AP message further comprises previous configuration information, the previous configuration information comprising a previous CGI, and

the new configuration information comprises a new radio (NR) physical cell identifier (PCI).

2 . The method according to claim 1 , wherein:

the new configuration information comprises a new generation radio access network node DU (gNB-DU) identification (ID).

3 . An apparatus comprising:

a memory storing instructions; and

a processor in communication with the memory, wherein, when the processor executes the instructions, the processor is configured to cause the apparatus to perform:

updating configuration information for a migrating integrated access backhaul node (IAB-node) during an inter-donor migration from a source IAB-donor to the apparatus by:

sending, by a central unit (CU) of the apparatus, a F1-AP message to a migrating IAB-node distributed unit (DU), the F1-AP message comprising new configuration information comprising a new radio (NR) cell global identifier (CGI),

wherein:

the F1-AP message further comprises previous configuration information, the previous configuration information comprising a previous CGI, and

the new configuration information comprises a new radio (NR) physical cell identifier (PCI).

4 . The apparatus according to claim 3 , wherein:

the new configuration information comprises a new generation radio access network node DU (gNB-DU) identification (ID).

5 . A non-transitory computer-readable medium storing instructions, wherein, the instructions, when executed by a processor of a target integrated access backhaul node (IAB)-donor central unit (CU), are configured to cause the processor to update configuration information for a migrating IAB-node during an inter-donor migration from a source IAB-donor to a target IAB-donor by:

sending a F1-AP message to a migrating IAB-node distributed unit (DU), the F1-AP message comprising new configuration information comprising a new radio (NR) cell global identifier (CGI),

wherein:

the F1-AP message further comprises previous configuration information, the previous configuration information comprising a previous CGI, and

the new configuration information comprises a new radio (NR) physical cell identifier (PCI).

6 . The non-transitory computer-readable medium

according to claim 5 , wherein:

the new configuration information comprises a new generation radio access network node DU (gNB-DU) identification (ID).

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 28, 2022
From: CAO, KUN; HUANG, YING; CHEN, LIN
To: ZTE CORPORATION
Reel/Frame 060658/0362 →
Continuity (2)
Continuation PCTCN2020078219 · Mar 6, 2020
Related Publication 20220369177A1 · Nov 17, 2022
References Cited (34)
US 12212955B2 · Wang · 2025 [cited by examiner]
US 20170332269A1 · Wang · 2017 [cited by applicant]
US 20190223078A1 · Sirotkin et al. · 2019 [cited by applicant]
US 20190289500A1 · Abedini et al. · 2019 [cited by applicant]
US 20190394738A1 · Abedini et al. · 2019 [cited by applicant]
US 20210227435A1 · Hsieh · 2021 [cited by examiner]
US 20220124706A1 · Abedini · 2022 [cited by examiner]
US 20220279555A1 · Xiao · 2022 [cited by examiner]
US 20220369177A1 · Cao et al. · 2022 [cited by applicant]
US 20230098848A1 · Ishii · 2023 [cited by examiner]
US 20230145711A1 · Koskinen · 2023 [cited by examiner]
CN 110662266A · 2020 [cited by applicant]
CN 110740485A · 2020 [cited by applicant]
CN 110830979A · 2020 [cited by applicant]
CN 112088544A · 2020 [cited by applicant]
EP 4082245A4 · 2020 [cited by applicant]
EP 3780746A1 · 2021 [cited by applicant]
WO 2019192524A1 · 2019 [cited by applicant]
WO WO2019246446A1 · 2019 [cited by applicant]
WO WO2021098085 · 2020 [cited by applicant]
WO WO2020033655A1 · 2020 [cited by applicant]
Partial Supplementary European Search Report regarding EP 20 88 9814 dated Apr. 12, 2023, 18 pages. [cited by applicant]
“3rd Generation Partnership Project, Technical Specification Group Radio Access Network; NR; Study on Integrated Access and Backhaul (Release 16),” 3GPP Draft; 38874-G00, 3rd Generation Partnership Project (3GPP), Mobil… [cited by applicant]
Zte et al, “Discussion on Inter-CU IAB migration handling,” 3GPP Draft; R3-196689, 3rd Generation Partnership Project (3GPP), Mobile Competence Centre; 650, Route Des Lucioles, F-06921 Sophia-Antipolis Cedex, France, vo… [cited by applicant]
International Search Repor and Written Opinion regarding PCT/CN2020/078219 dated Dec. 9, 2020. [cited by applicant]
CATT. “(TP for NR_IAB BL CR for TS 38.401) Inter-CU IAB-node migration” [cited by applicant]
ZTE et al. “Discussion on network-controlled IAB migration hanling” [cited by applicant]
Canadian Patent Office Examination Report regarding 3,162,217 dated Oct. 31, 2023. [cited by applicant]
Chinese Office Action and English translation of the Office Action regarding 3 202080098064.3 dated Jul. 10, 2024, 12 pages. [cited by applicant]
Nokia, Nokia Shanghai Bell, R3-185170, “IAB Topology Discovery for Routing and Topology Management,” 3GPP tsg_ran\wg3_iu,tsgr3_101, Aug. 28, 2018, 6 pages. [cited by applicant]
Indian Patent Office First Examination Report regarding 202217044234 Aug. 17, 2023. [cited by applicant]
Koren-language Office Action with English summary issued in Korean Patent Application No. 10-2022-7026490 dated May 2, 2025 (6 pages). [cited by applicant]
European Patent Office Office Action issued in Application No. 20 889 814.8, Aug. 14, 2025, (14 pages). [cited by applicant]
Korean Notice of Allowance with English summary regarding Application No. 10-2022-7026490 added Dec. 22, 2025 (8 pages). [cited by applicant]