IP Library › Granted Patent US 12,660,032
Granted Patent B2
US 12,660,032 · App. 18/374,727 · Granted Jun 16, 2026

Communication path switching method and terminal

Inventors: Jing Liang (Dongguan, CN); Qian Zheng (Dongguan, CN)
Assignee: VIVO MOBILE COMMUNICATION CO., LTD.
H04W76/25H04W76/38
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,660,032
App. No.
18/374,727
Granted
Jun 16, 2026
Kind
B2
Abstract

A communication path switching method includes receiving a reconfiguration message; and starting a target timer in a process of switching from a first path to a second path based on the reconfiguration message. The reconfiguration message is used for indicating the remote UE to switch from the first path to the second path. The first path includes a direct connection between the remote UE and a first base station, and the second path includes a connection between the remote UE and a second base station via a first relay UE. The target timer is used for the remote UE to determine a switching result of switching from the first path to the second path.

Claims (64)

1 . A communication path switching method, performed by a remote user equipment (UE), wherein the method comprises:

receiving a reconfiguration message, wherein the reconfiguration message is used for indicating the remote UE to switch from a first path to a second path, wherein the first path comprises a direct connection between the remote UE and a first base station, and the second path comprises a connection between the remote UE and a second base station via a first relay UE; and

starting a target timer in a process of switching from the first path to the second path based on the reconfiguration message, wherein the target timer is used for the remote UE to determine a switching result of switching from the first path to the second path; wherein

the starting a target timer in a process of switching from the first path to the second path based on the reconfiguration message comprises:

in a case that the reconfiguration message is received, starting the target timer; and

switching from the first path to the second path based on the reconfiguration message;

after the switching from the first path to the second path, the method further comprises:

stopping the target timer in a case that the remote UE has successfully sent a radio resource control (RRC) reconfiguration message to a fourth base station via the first relay UE.

2 . The method according to claim 1 , wherein the target timer comprises any one of the following:

a timer dedicated to switching of the remote UE from the first path to the second path; and

a designated timer used in switching from the first path to a third path, wherein the third path comprises a direct connection between the remote UE and a third base station.

3 . The method according to claim 1 , wherein after the switching from the first path to the second path, the method further comprises:

suspending the target timer in a case that establishment of a PC5 connection to the first relay UE starts; and

continuing to run the target timer in a case that the remote UE has successfully established a PC5 connection to the first relay UE.

4 . The method according to claim 1 , wherein in a case that the reconfiguration message indicates presence of at least one relay UE, the first relay UE is any one of the at least one relay UE.

5 . The method according to claim 1 , wherein the PC5 connection comprises a PC5-S connection and/or a PC5-RRC connection.

6 . The method according to claim 1 , wherein that the remote UE has successfully sent an RRC reconfiguration message to a fourth base station comprises:

that the remote UE has successfully sent the RRC reconfiguration message to the fourth base station via the first relay UE.

7 . The method according to claim 1 , wherein after the starting a target timer in a process of switching from the first path to the second path based on the reconfiguration message, the method further comprises:

in a case that the target timer has expired, and/or in a case that the number of PC5 connection attempts initiated by the remote UE has exceeded a first value but no PC5 connection has been successfully established to the first relay UE, determining that the switching result is unsuccessful switch, and performing at least one of the following:

initiating, by the remote UE, a radio resource control (RRC) connection re-establishment procedure;

initiating, by the remote UE, a switch failure reporting procedure, and reporting information related to path switching failure; or

initiating, by the remote UE, a relay UE reselection procedure, and/or establishing a PC5 connection to a second relay UE that has been reselected.

8 . The method according to claim 1 , wherein after the starting a target timer in a process of switching from the first path to the second path based on the reconfiguration message, the method further comprises:

in a case that the target timer has not expired and the remote UE has not successfully established a PC5 connection to the first relay UE, and/or in a case that the number of PC5 connection attempts initiated by the remote UE has not exceeded a first value and the remote UE has not successfully established a PC5 connection to the first relay UE, performing at least one of the following:

initiating, by the remote UE, a radio resource control (RRC) connection re-establishment procedure; or

initiating, by the remote UE, a relay UE reselection procedure, and/or establishing a PC5 connection to a third relay UE that has been reselected.

9 . The method according to claim 7 , wherein the second relay UE or the third relay UE satisfies any one of the following:

being obtained through relay UE reselection initiated by the remote UE; and

being obtained through indication of the reconfiguration message, wherein the second relay UE or the third relay UE is a relay UE other than the first relay UE in multiple relay UEs indicated by the reconfiguration message.

10 . The method according to claim 1 , wherein before the starting a target timer in a process of switching from the first path to the second path based on the reconfiguration message, the method further comprises:

in a case that the reconfiguration message indicates multiple relay UEs, selecting the first relay UE from the multiple relay UEs.

11 . A terminal, wherein the terminal is a remote user equipment (UE), comprising a processor, a memory, and a program or instructions stored in the memory and executable on the processor, wherein the program or instructions, when executed by the processor, cause the remote UE to perform:

receiving a reconfiguration message, wherein the reconfiguration message is used for indicating the remote UE to switch from a first path to a second path, wherein the first path comprises a direct connection between the remote UE and a first base station, and the second path comprises a connection between the remote UE and a second base station via a first relay UE; and

starting a target timer in a process of switching from the first path to the second path based on the reconfiguration message, wherein the target timer is used for the remote UE to determine a switching result of switching from the first path to the second path; wherein

the program or instructions, when executed by the processor, cause the remote UE to perform:

in a case that the reconfiguration message is received, starting the target timer; and

switching from the first path to the second path based on the reconfiguration message; and

the program or instructions, when executed by the processor, cause the remote UE to further perform:

stopping the target timer in a case that the remote UE has successfully sent a radio resource control (RRC) reconfiguration message to a fourth base station.

12 . The terminal according to claim 11 , wherein the target timer comprises any one of the following:

a timer dedicated to switching of the remote UE from the first path to the second path; and

a designated timer used in switching from the first path to a third path, wherein the third path comprises a direct connection between the remote UE and a third base station.

13 . The terminal according to claim 11 , wherein the program or instructions, when executed by the processor, cause the remote UE to further perform:

in a case that the target timer has expired, and/or in a case that the number of PC5 connection attempts initiated by the remote UE has exceeded a first value but no PC5 connection has been successfully established to the first relay UE, determining that the switching result is unsuccessful switch, and performing at least one of the following:

initiating a radio resource control (RRC) connection re-establishment procedure;

initiating a switch failure reporting procedure, and reporting information related to path switching failure; or

initiating a relay UE reselection procedure, and/or establishing a PC5 connection to a second relay UE that has been reselected.

14 . The terminal according to claim 13 , wherein the second relay UE or the third relay UE satisfies any one of the following:

being obtained through relay UE reselection initiated by the remote UE; and

being obtained through indication of the reconfiguration message, wherein the second relay UE or the third relay UE is a relay UE other than the first relay UE in multiple relay UEs indicated by the reconfiguration message.

15 . The terminal according to claim 11 , wherein the program or instructions, when executed by the processor, cause the remote UE to further perform:

suspending the target timer in a case that establishment of a PC5 connection to the first relay UE starts; and

continuing to run the target timer in a case that the remote UE has successfully established a PC5 connection to the first relay UE.

16 . The terminal according to claim 11 , wherein in a case that the reconfiguration message indicates presence of at least one relay UE, the first relay UE is any one of the at least one relay UE.

17 . The terminal according to claim 16 , wherein the PC5 connection comprises a PC5-S connection and/or a PC5-RRC connection.

18 . The terminal according to claim 11 , wherein the program or instructions, when executed by the processor, cause the remote UE to perform:

that the remote UE has successfully sent the RRC reconfiguration message to the fourth base station via the first relay UE.

19 . The terminal according to claim 11 , wherein the program or instructions, when executed by the processor, cause the remote UE to further perform:

in a case that the target timer has not expired and the remote UE has not successfully established a PC5 connection to the first relay UE, and/or in a case that the number of PC5 connection attempts initiated by the remote UE has not exceeded a first value and the remote UE has not successfully established a PC5 connection to the first relay UE, performing at least one of the following:

initiating, by the remote UE, a radio resource control (RRC) connection re-establishment procedure; or

initiating, by the remote UE, a relay UE reselection procedure, and/or establishing a PC5 connection to a third relay UE that has been reselected.

20 . The terminal according to claim 11 , wherein the program or instructions, when executed by the processor, cause the remote UE to further perform:

in a case that the reconfiguration message indicates multiple relay UEs, selecting the first relay UE from the multiple relay UEs.

Assignments (2)
CORRECTIVE ASSIGNMENT TO CORRECT THE ASSIGNEE ADDRESS PREVIOUSLY RECORDED AT REEL: 65356 FRAME: 681. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Apr 15, 2026
From: LIANG, JING; ZHENG, QIAN
To: VIVO MOBILE COMMUNICATION CO.,LTD.
Reel/Frame 075415/0388 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 26, 2023
From: LIANG, JING; ZHENG, QIAN
To: VIVO MOBILE COMMUNICATION CO., LTD.
Reel/Frame 065356/0681 →
Priority Claims (1)
CN 202110343630.9 · Mar 30, 2021 · national
Continuity (2)
Continuation PCTCN2022083111 · Mar 25, 2022
Related Publication 20240023189A1 · Jan 18, 2024
References Cited (32)
US 10624146B2 · Ma · 2020 [cited by examiner]
US 10945179B2 · Xu et al. · 2021 [cited by applicant]
US 20180213577A1 · Burbidge · 2018 [cited by examiner]
US 20190387446A1 · Xu · 2019 [cited by examiner]
US 20210051556A1 · Lin et al. · 2021 [cited by applicant]
US 20210144606A1 · Xu · 2021 [cited by examiner]
US 20220361056A1 · Jin · 2022 [cited by examiner]
US 20230077496A1 · Cheng · 2023 [cited by examiner]
US 20230363020A1 · Back · 2023 [cited by examiner]
US 20240023189A1 · Liang · 2024 [cited by examiner]
US 20240064838A1 · Orsino · 2024 [cited by examiner]
US 20240179611A1 · Chen · 2024 [cited by examiner]
CN 109417695B · 2020 [cited by applicant]
CN 112514520A · 2021 [cited by applicant]
CN 111034334B · 2022 [cited by applicant]
JP 2013115465A · 2013 [cited by applicant]
JP 2023554677A · 2023 [cited by applicant]
WO WO2017004720A1 · 2017 [cited by examiner]
WO WO2017219289A1 · 2017 [cited by examiner]
WO 2018006253A1 · 2018 [cited by applicant]
WO 2020259811A1 · 2020 [cited by applicant]
WO 2022042146A1 · 2022 [cited by applicant]
WO 2022136387A1 · 2022 [cited by applicant]
3rd Generation Partnership Project, “Technical Specification Group Access Network, NG-RAN, NG Application Protocol (NGAP) (Release 15)”, 3GPP TS 38.413 V0.9.0 , May 2018. [cited by applicant]
Intel Corporation, “Inter-gNB Path Switching for L2 U2N Relay”, 3GPP TSG RAN WG2 Meeting #113e, e-Meeting, Jan. 25-Feb. 5, 2020, R2-2101300. [cited by applicant]
Qualcomm Incorporated, “Service continuity of L2 U2N relay”, 3GPP TSG RAN WG2 Meeting #114-e, e-Conference, May 19-27, 2021, R2-2104739. [cited by applicant]
Zte Corporation et al., “Discussion on remaining issues on service continuity”, 3GPP TSG RAN WG2 Meeting #116bis electronic, Online, Jan. 17-26, 2022, R2-2201346. [cited by applicant]
Intel Corporation, “Characteristics of L2 and L3-based Sidelink Relaying”, 3GPP TSG-RAN WG2 Meeting #111e, E-Meeting, Aug. 17-28, 2020, R2-2006718. [cited by applicant]
Intel Corporation, “Inter-gNB Path Switching for L2 U2N Relay”, 3GPP TSG RAN WG2 Meeeting #113e, e-Meeting, Jan. 25-Feb. 5, 2020, R2-2101300. [cited by applicant]
LG Electronics Inc., “Service continuity for Remote Ue”, 3GPP TSG-RAN WG2 Meeting #112e, Online Meeting, Nov. 2-13, 2020, R2-2010659. [cited by applicant]
NTT Docomo, Inc., “Summary of email discussion on handover failure handling”, 3GPP TSG RAN WG2 #61, Sorrento, Italy, Feb. 11-15, 2008. [cited by applicant]
Panasonic, “Handover procedure and failure handling”, 3GPP TSG RAN WG2 #61bis, Mar. 31-Apr. 4, 2008, R2-081570. [cited by applicant]