IP Library › Granted Patent US 12,680,427
Granted Patent B2
US 12,680,427 · App. 18/523,293 · Granted Jul 14, 2026

Production method with a plunger lift system

Inventors: Bagus Wahyu Setiadi (Dhahran, SA); Gustavo Ariel Alvarez (Dhahran, SA)
Assignee: Saudi Arabian Oil Company
E21B43/121E21B47/008E21B47/09F04B47/12F04B49/065
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,680,427
App. No.
18/523,293
Granted
Jul 14, 2026
Kind
B2
Abstract

A method includes deploying a plunger from a wellhead to a downhole location of a production string fluidly coupled to the wellhead and disposed within a wellbore. The plunger includes a collar detector attached to a body of the plunger and the production string includes a plurality of collar. The method includes detecting, by the collar detector, the plurality of collars as the plunger moves along the string, generating, by a circuitry module of the collar detector, a first plurality of timestamps each associated with a respective collar. The method also includes determining, as a function of the timestamps, at least one parameter of the plunger, and controlling, as a function of the parameter of the plunger, a valve fluidly coupled to the wellhead to control a parameter of a plunger lift cycling operation.

Claims (55)

1 . A method, comprising:

receiving, by a system comprising one or more computers in one or more locations, information from a collar detector attached to a plunger configured to move along a production string to produce hydrocarbons during a plunger lift cycle operation, the production string fluidly coupled to a wellhead comprising a valve, the production string comprising a plurality of collars spaced apart and distributed along a length of the production string, each collar joining two consecutive pipes of the production string, the information comprising a plurality of timestamps each associated with a time at which the collar detector detects a respective collar;

determining, by the system and as a function of the information, a parameter of the plunger during the plunger lift cycle operation; and

controlling, by the system and as a function of the determined parameter, the valve to change at least one parameter of the plunger lift cycle operation;

wherein one of a plurality of spring-loaded pins is a downward facing spring-loaded pin at a lowermost end of the plunger, the downward facing spring-loaded pin configured to retract upon landing at a bottom hole bumper spring of the production spring, and the collar detector is configured to generate, in response to the retraction of the downward facing spring-loaded pin, a timestamp that represents a time at which the plunger landed at the bottom hole bumper spring.

2 . A method, comprising:

deploying a plunger from a wellhead to a downhole location of a production string fluidly coupled to the wellhead and disposed within a wellbore, the plunger comprising a collar detector attached to a body of the plunger and the production string comprising a plurality of collars spaced apart and distributed along a length of the production string, each collar joining two adjacent pipes of the production string to form a joint;

detecting, by the collar detector, the plurality of collars as the plunger moves in a downhole direction, the detecting comprising generating, by a circuitry module of the collar detector, a first plurality of timestamps each associated with a respective collar;

lifting the plunger from the downhole location of the production string to the wellhead to produce hydrocarbons;

detecting, by the collar detector, the plurality of collars as the plunger moves in an uphole direction, the detecting comprising generating, by the circuitry module of the collar detector, a second plurality of timestamps each associated with a respective collar;

determining, as a function of the first and second plurality of timestamps, at least one parameter of the plunger; and

controlling, as a function of the parameter of the plunger, a valve fluidly coupled to the wellhead to control a parameter of a plunger lift cycling operation;

wherein the collar detector comprises an electromechanical collar detector comprising a plurality of spring-loaded pins connected to an electromechanical transducer configured to generate, in response to movement of the plurality of spring-loaded pins, the first plurality of timestamps and store the plurality of timestamps in a memory of the plunger, and detecting the plurality of collars as the plunger moves in a downhole direction comprises axially extending, at an annular section of increased diameter at the respective joint, the plurality of spring-loaded pins as the plunger moves past each collar.

3 . The method of claim 2 , further comprising, before determining the at least one parameter of the plunger, transmitting, by a transmitter of the plunger, the first and second plurality of timestamps to a system comprising one or more computer in one or more location, wherein the determining comprises determining, by the system and as a function of the plurality of timestamps a falling speed of the plunger.

4 . The method of claim 3 , wherein the determining comprises determining the falling speed of the plunger between two consecutive collars, the determining comprising:

determining, by the system, a time period between the two consecutive collars, and

dividing, by the system, a prerecorded distance between the two consecutive collars by the time period.

5 . The method of claim 4 , wherein the determining comprises determining a change of falling speed of the plunger and determining, as a function of the change of falling speed, a fluid level of fluid accumulated at a downhole end of the production string.

6 . The method of claim 2 , wherein one of the plurality of spring-loaded pin is a downward facing spring-loaded pin at a lowermost end of the plunger, the downward facing spring-loaded pin configured to retract upon contact with a bottom hole bumper spring of the production spring, the electromechanical transducer configured to generate, in response to the retraction of the downward facing spring-loaded pin, a timestamp that represents a time at which the plunger lands at the bottom hole bumper spring.

7 . The method of claim 2 , wherein the controlling comprises controlling a time that the valve is open to decrease or increase a shut-in time of the plunger lift cycling operation to change a production rate of the wellbore.

8 . The method of claim 2 , wherein the plurality of spring-loaded pins comprise a plurality of spring-loaded plungers.

9 . The method of claim 2 , wherein the at least one parameter of the plunger comprises at least one of a falling velocity of the plunger, a falling acceleration of the plunger, a rising velocity of the plunger, a rising acceleration of the plunger, a location of the plunger along the production string, or a location of the plunger within the wellhead.

10 . The method of claim 2 , wherein the valve comprises a control valve and the parameter of a subsequent plunger lift cycling operation comprises at least one of a shut-in time or an after-flow time, the controlling comprising controlling a time that the control valve is open to change the shut-in time or the after-flow time and thus change the rate of production of the wellbore.

11 . A method, comprising:

receiving, by a system comprising one or more computers in one or more locations, information from a collar detector attached to a plunger configured to move along a production string to produce hydrocarbons during a plunger lift cycle operation, the production string fluidly coupled to a wellhead comprising a valve, the production string comprising a plurality of collars spaced apart and distributed along a length of the production string, each collar joining two consecutive pipes of the production string, the information comprising a plurality of timestamps each associated with a time at which the collar detector detects a respective collar;

determining, by the system and as a function of the information, a parameter of the plunger during the plunger lift cycle operation; and

controlling, by the system and as a function of the determined parameter, the valve to change at least one parameter of the plunger lift cycle operation;

wherein the collar detector comprises:

a housing attached to a downhole end of the plunger;

a memory disposed within the housing;

a transducer disposed within the housing; and

a plurality of spring-loaded pins connected to the transducer and extending through a side wall of the housing, the transducer configured to generate, in response to movement of the plurality of spring-loaded pins, the plurality of timestamps and store the plurality of timestamps in the memory, and detecting the plurality of collars as the plunger moves in a downhole direction comprises axially extending, at an annular section of increased diameter at the respective collar, the plurality of spring-loaded pins as the plunger moves past each collar.

12 . The method of claim 11 , further comprising, before determining the parameter of the plunger, transmitting, by a transmitter of the collar detector, the plurality of timestamps to a system at a terranean surface of the wellbore and comprising one or more computer in one or more location, wherein the determining comprises determining, by the system and as a function of the information, a velocity and velocity distribution of the plunger along the production string.

13 . The method of claim 11 , wherein the determining comprises determining the falling speed of the plunger between two consecutive collars, the determining comprising:

determining, by the system, a time period between the two consecutive collars, and dividing, by the system, a prerecorded distance between the two consecutive collars by the time period.

14 . The method of claim 13 , wherein the determining comprises determining a change of falling speed of the plunger and determining, as a function of the change of falling speed, a fluid level of fluid accumulated at a downhole end of the production string.

15 . The method of claim 11 , wherein the controlling comprises controlling a time that the valve is open to decrease or increase a shut-in time of the plunger lift cycle operation to change a production rate of the wellbore.

16 . A plunger lift system, comprising:

a production string configured to be disposed within a wellbore, the production string made of a plurality of pipes joined by a plurality of collars;

a wellhead configured to reside at a terranean surface of the wellbore and be fluidly coupled to the production string;

a valve configured to be fluidly coupled to the wellhead;

a plunger configured to move along the production string to produce hydrocarbons during a plunger lift cycle operation, the plunger comprising a collar detector; and

a system at or near the terranean surface of the wellbore, the system comprising one or more computers in one or more locations, the system configured to:

receive, from the collar detector, information comprising a plurality of timestamps each representing a time at which the collar detector detected a respective one of the plurality of collars; and

determine, as a function of the information, a parameter of the plunger, the parameter comprising at least one of a speed or location of the plunger along the production string, the parameter usable to control at least one parameter of the plunger lift cycle operation;

wherein the collar detector comprises an electromechanical collar detector comprising a plurality of spring-loaded pins connected to an electromechanical transducer configured to generate, in response to movement of the plurality of spring-loaded pins, the plurality of timestamps and store the plurality of timestamps in a memory of the plunger, the collar detector configured to detect the plurality of collars as the plurality of spring-loaded pins extend at an annular section of increased diameter at the respective joint as the plunger moves past each collar.

17 . The plunger lift system of claim 16 , wherein the system comprises a controller configured to control, as a function of the determined speed of the plunger, the valve to change at least one of a shut-in period or an after-flow period of the plunger lift cycle operation.

18 . A method, comprising:

deploying a plunger from a wellhead to a downhole location of a production string fluidly coupled to the wellhead and disposed within a wellbore, the plunger comprising a collar detector attached to a body of the plunger and the production string comprising a plurality of collars spaced apart and distributed along a length of the production string, each collar joining two adjacent pipes of the production string to form a joint;

detecting, by the collar detector, the plurality of collars as the plunger moves in a downhole direction, the detecting comprising generating, by a circuitry module of the collar detector, a first plurality of timestamps each associated with a respective collar;

lifting the plunger from the downhole location of the production string to the wellhead to produce hydrocarbons;

detecting, by the collar detector, the plurality of collars as the plunger moves in an uphole direction, the detecting comprising generating, by the circuitry module of the collar detector, a second plurality of timestamps each associated with a respective collar;

determining, as a function of the first and second plurality of timestamps, at least one parameter of the plunger; and

controlling, as a function of the parameter of the plunger, a valve fluidly coupled to the wellhead to control a parameter of a plunger lift cycling operation;

wherein the determining comprises determining a change of falling or rising speed of the plunger and a location of the falling or rising speed of the plunger and determining, as a function of the change and location of the falling or rising speed, a sealing performance of the plunger.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 24, 2024
From: SETIADI, BAGUS WAHYU; ALVAREZ, GUSTAVO ARIEL
To: SAUDI ARABIAN OIL COMPANY
Reel/Frame 066227/0516 →
Continuity (1)
Related Publication 20250172057A1 · May 29, 2025
References Cited (37)
US 2676547A · Knox · 1954 [cited by applicant]
US 5429190A · Kilgore · 1995 [cited by examiner]
US 6571868B2 · Victor · 2003 [cited by applicant]
US 6634426B2 · McCoy · 2003 [cited by examiner]
US 7954545B2 · Hearn et al. · 2011 [cited by applicant]
US 8286717B2 · Giroux et al. · 2012 [cited by applicant]
US 9109424B2 · Jefferies et al. · 2015 [cited by applicant]
US 9587444B2 · Agarwal · 2017 [cited by applicant]
US 9915256B2 · Bebak et al. · 2018 [cited by applicant]
US 9976399B2 · Tolman · 2018 [cited by examiner]
US 10697287B2 · Romer et al. · 2020 [cited by applicant]
US 12371977B2 · Setiadi · 2025 [cited by examiner]
US 20100038071A1 · Scott et al. · 2010 [cited by applicant]
US 20150275633A1 · Tolman et al. · 2015 [cited by applicant]
US 20170044882A1 · Casey et al. · 2017 [cited by applicant]
US 20170183946A1 · Tolman et al. · 2017 [cited by applicant]
US 20180058191A1 · Romer et al. · 2018 [cited by applicant]
US 20180196005A1 · Fanini et al. · 2018 [cited by applicant]
US 20220372852A1 · Schmidt et al. · 2022 [cited by applicant]
CA 2164145 · 1996 [cited by applicant]
CA 2527012 · 2005 [cited by applicant]
CN 2336113 · 1999 [cited by applicant]
CN 201314221 · 2009 [cited by applicant]
CN 203035167 · 2013 [cited by applicant]
CN 203603854 · 2014 [cited by applicant]
CN 205189837 · 2016 [cited by applicant]
CN 109209305 · 2019 [cited by applicant]
CN 216406782 · 2022 [cited by applicant]
EP 0651132A2 · 1995 [cited by applicant]
EP 2142755 · 2016 [cited by applicant]
GB 2257185 · 1993 [cited by applicant]
GB 2409691 · 2007 [cited by applicant]
GB 2452370 · 2009 [cited by applicant]
WO WO2015167895 · 2015 [cited by applicant]
WO WO2016057011 · 2016 [cited by applicant]
Gray, “Well-Performance Diagnostics Using Smart Plunger Technology,” SPE 120596-MS, SPE International, SPE Production and Operations Symposium, Oklahoma City, Oklahoma, Apr. 2009, 10 pages. [cited by applicant]
International Search Report and Written Opinion in International Appln. No. PCT/US2024/057022, mailed on Feb. 10, 2025, 15 pages. [cited by applicant]