Granted Patent
B2
US 12,720,630 · App. 18/477,037 · Granted Aug 25, 2026
Communication control method
View Patent ↗
Loading inventors, assignments & file history…
Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST
Recorded Sep 28, 2023
From: FUJISHIRO, MASATO; CHANG, HENRY
To: KYOCERA CORPORATION
Reel/Frame 065065/0151 →
Continuity (3)
Continuation
PCTJP2022015026
· Mar 28, 2022
Provisional Application
63167227
· Mar 29, 2021
References Cited (11)
US 20220086749A1
· Ishii
· 2022
[cited by examiner]
US 20230199879A1
· Zhu
· 2023
[cited by examiner]
Intel Corporation, “Discussion on Topology Adaptation Enhancements”, 3GPP TSG RAN WG2 Meeting #113e, Electronic meeting, Jan. 25-Feb. 5, 2020, R2-2100359, total 13 pages.
[cited by applicant]
CATT, “Summary of the email discussion [106#43] [IAB] Backhaul RLF”, 3GPP TSG RAN WG2 Meeting #107, Aug. 26-30, 2019, R2-1908842, total 65 pages. Prague, Czech Republic.
[cited by applicant]
3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; NR and NG-RAN Overall Description; Stage 2 (Release 16); 3GPP TS 38.300 V16.4.0; Dec. 2020; pp. 1-149.
[cited by applicant]
Qualcomm Incorporated (Email discussion rapporteur); “Report from [Post112-e][066][eIAB] Topology Adaptation (QC)”; 3GPP TSG-RAN WG2 Meeting #113e; Online; R2-2102238; Jan. 21, 2021; pp. 1-40.
[cited by applicant]
Futurewei; “RAN2 impacts of Rel.17 IAB topology adaptation enhancements”; 3GPP TSG-RAN WG2 Meeting #113 electronic; R2-2101798; Online; Jan. 25-Feb. 5, 2021; pp. 1-8.
[cited by applicant]