IP Library › Granted Patent US 12,739,727
Granted Patent B2
US 12,739,727 · App. 18/891,785 · Granted Sep 15, 2026

Conditional handover with target master node driven delayed secondary cell group execution

Inventors: Dariusz Palka (Cracow, PL); Halit Murat Gürsu (Munich, DE); Umur Karabulut (Munich, DE); Panagiotis Spapis (Munich, DE); Ahmad Awada (Munich, DE)
Assignee: Nokia Technologies Oy
H04W36/362H04W36/0069H04W36/00725H04W36/0085
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,739,727
App. No.
18/891,785
Granted
Sep 15, 2026
Kind
B2
Abstract

The present invention is about conditional handover (CHO) in telecommunications networks, and a main point is to pass the responsibility to a target Master Node for triggering the UE to rapid access to Primary Secondary Cell after applying target Primary Cell configuration during a CHO-NR-DC handover. The target MN decides whether to wait further to execute CPC. If measurements are hopeful, completion of execution of the primary secondary cell for dual connectivity is postponed, and L3 measurement results are inspected from the UE. There are three variants, when the target MN requests the UE to access the target Secondary Node; namely RRC-based access target SN trigger, PDCCH-order-based variant and DL MCE-based variant.

Claims (95)

1 . A user equipment for enabling conditional handover with delayed dual connectivity, and comprising at least one processor and at least one memory, said at least one memory stored with computer program code thereon, the at least one memory and the computer program code configured to, with the at least one processor, cause the user equipment at least to perform:

receiving configuration information comprising at least a handover execution condition for a primary cell and an execution condition for at least one primary secondary cell with delayed dual connectivity execution enabled;

determining whether the handover execution condition for the primary cell is satisfied and whether the execution condition for an associated primary secondary cell is satisfied; and

if it is determined that the handover execution condition for the primary cell is satisfied but the execution condition for the associated primary secondary cell is not satisfied,

enabling completion of conditional handover to the primary cell and postponing enabling completion of execution of the associated primary secondary cell for dual connectivity,

wherein during postponing,

maintaining the configuration of at least one configured primary secondary cell,

performing measurements related to at least one of the maintained primary secondary cells,

transmitting information related to the performed measurements towards the primary cell, and

when receiving a trigger from the primary cell to access the associated primary secondary cell for which measurement information has been transmitted,

accessing the associated primary secondary cell.

2 . The user equipment according to claim 1 , comprising computer program code configured to cause the user equipment to perform:

obtaining information of the primary cell from a distributed unit of a master node.

3 . The user equipment according to claim 1 , comprising computer program code configured to cause the user equipment to perform:

obtaining information of the primary secondary cell from a distributed unit of a secondary node.

4 . The user equipment according to claim 1 , comprising computer program code configured to cause the user equipment to perform:

the information related to the performed measurements comprises a request to a target master node to check the execution condition for the primary secondary cell based on the performed measurement information and identification of a primary secondary cell fulfilling the execution condition.

5 . The user equipment according to claim 1 , comprising computer program code configured to cause the user equipment to perform:

the trigger from the primary cell to access a primary secondary cell is a Radio Resource Control-based variant, comprising:

receiving a modified Radio Resource Control Reconfiguration with sync message from a target master node distributed unit;

sending a Radio Resource Control Reconfiguration complete to the target master node distributed unit.

6 . The user equipment according to claim 1 , comprising computer program code configured to cause the user equipment to perform:

the trigger from the primary cell to access a primary secondary cell is a physical downlink control channel order-based variant, comprising:

receiving a physical downlink control channel order from a target master node distributed unit.

7 . The user equipment according to claim 1 , comprising computer program code configured to cause the user equipment to perform:

the trigger from the primary cell to access a primary secondary cell is a downlink medium access control control element-based variant, comprising:

receiving an access secondary node downlink medium access control control element from a target master node distributed unit.

8 . The user equipment according to claim 1 , comprising computer program code configured to cause the user equipment to perform:

the trigger from the primary cell to access a primary secondary cell is based on at least one of the following: current amount of downlink data waiting for transmission to the user equipment, current resource availability at a master node, current resource availability at a secondary node.

9 . The user equipment according to claim 8 , comprising computer program code configured to cause the user equipment to perform:

in case that at least two primary secondary cells have been identified fulfilling the respective execution condition,

checking which primary secondary cell is best suited for dual connectivity, based on comparison of current load, and/or resource availability at the identified primary secondary cells.

10 . The user equipment according to claim 1 , comprising computer program code configured to cause the user equipment to perform:

accessing the associated primary secondary cell using a random access channel (RACH) or RACHless procedure, where the RACHless procedure is selected in case timing advance of the associated primary secondary cell is known via an early sync procedure.

11 . The user equipment according to claim 1 , comprising computer program code configured to cause the user equipment to perform:

instead of or in addition to maintaining the configuration of at least one configured primary secondary cell, applying the configuration of at least one configured primary secondary cell; and

sending a confirmation of configuration application.

12 . A method for enabling conditional handover with delayed dual connectivity, the method comprising:

receiving configuration information comprising at least a handover execution condition for a primary cell and an execution condition for at least one primary secondary cell with delayed dual connectivity execution enabled;

determining whether the handover execution condition for the primary cell is satisfied and whether the execution condition for an associated primary secondary cell is satisfied; and

if it is determined that the handover execution condition for the primary cell is satisfied but the execution condition for the associated primary secondary cell is not satisfied,

enabling completion of conditional handover to the primary cell and postponing enabling completion of execution of the associated primary secondary cell for dual connectivity,

wherein during postponing,

maintaining the configuration of at least one configured primary secondary cell,

performing measurements related to at least one of the maintained primary secondary cells,

transmitting information related to the performed measurements towards the primary cell, and

when receiving a trigger from the primary cell to access the associated primary secondary cell for which measurement information has been transmitted,

accessing the associated primary secondary cell.

13 . A target master node for a radio access network for enabling conditional handover with delayed dual connectivity, the target master node comprising at least one processor and at least one memory, said at least one memory stored with computer program code thereon, the at least one memory and the computer program code configured to, with the at least one processor, cause the target master node at least to perform:

preparing configuration information comprising at least a handover execution condition for a primary cell and an execution condition for at least one primary secondary cell with delayed dual connectivity execution enabled, and sending the configuration information towards a user equipment;

if it is determined that the handover execution condition for the primary cell is satisfied but the execution condition for an associated primary secondary cell is not satisfied,

in response to received primary secondary cell related measurement results from the user equipment, deciding whether there is a chance for the execution condition for the associated primary secondary cell to be fulfilled in a predetermined time period; and if there is,

enabling completion of conditional handover to the primary cell and postponing enabling completion of execution of the associated primary secondary cell for dual connectivity,

wherein during postponing,

maintaining the configuration of at least one configured primary secondary cell,

receiving information related to performed measurements related to at least one of the maintained primary secondary cells, from the user equipment,

requesting the user equipment to access the associated primary secondary cell for which measurement information has been received, by sending a trigger to the user equipment, and

enabling the user equipment to access the associated primary secondary cell.

14 . The target master node according to claim 13 , comprising computer program code configured to cause the target master node to perform:

the received information related to the performed measurements comprises a request from the user equipment to check the execution condition for the primary secondary cell based on the performed measurement information and identification of a primary secondary cell fulfilling the execution condition.

15 . The target master node according to claim 13 , comprising computer program code configured to cause the target master node to perform:

the trigger from the primary cell to access a primary secondary cell is a Radio Resource Control-based variant, comprising:

sending a Radio Resource Control Reconfiguration with sync message from a target master node centralized unit to a target master node distributed unit;

sending a modified Radio Resource Control Reconfiguration with sync message from the target master node distributed unit to the user equipment; and

receiving a Radio Resource Control Reconfiguration complete from the user equipment to the target master node distributed unit, and further forwarding the Radio Resource Control Reconfiguration complete to the target master node centralized unit.

16 . The target master node according to claim 13 , comprising computer program code configured to cause the target master node to perform:

the trigger from the primary cell to access a primary secondary cell is a physical downlink control channel order-based variant, comprising:

sending a request to trigger user equipment synchronization to a target secondary node, from a target master node centralized unit to a target master node distributed unit;

sending a physical downlink control channel order from the target master node distributed unit to the user equipment; and

sending a response message that the access request has been sent, from the target master node distributed unit to the target master node centralized unit.

17 . The target master node according to claim 13 , comprising computer program code configured to cause the target master node to perform:

the trigger from the primary cell to access a primary secondary cell is a downlink medium access control control element-based variant, comprising:

sending a request to trigger user equipment synchronization to a target secondary node, from a target master node centralized unit to a target master node distributed unit;

sending an access secondary node downlink medium access control control element from the target master node distributed unit to the user equipment; and

sending a response message that the access request has been sent, from the target master node distributed unit to the target master node centralized unit.

18 . The target master node according to claim 13 , comprising computer program code configured to cause the target master node to perform:

the trigger from the primary cell to access a primary secondary cell is based on at least one of the following: current amount of downlink data waiting for transmission to the user equipment, current resource availability at a master node, current resource availability at a secondary node.

19 . The target master node according to claim 18 , comprising computer program code configured to cause the target master node to perform:

in case that at least two primary secondary cells have been identified fulfilling the respective execution condition,

checking which primary secondary cell is best suited for dual connectivity, based on comparison of current load, and/or resource availability at the identified primary secondary cells.

20 . The target master node according to claim 13 , comprising computer program code configured to cause the target master node to perform:

requesting the user equipment to access the associated primary secondary cell using a random access channel (RACH) or RACHless procedure, where the RACHless procedure is selected in case timing advance of the associated primary secondary cell is known via an early sync procedure.

21 . The target master node according to claim 13 , comprising computer program code configured to cause the target master node to perform:

instead of or in addition to maintaining the configuration of at least one configured primary secondary cell, applying the configuration of at least one configured primary secondary cell; and

sending a confirmation of configuration application.

22 . A method for enabling conditional handover with delayed dual connectivity, the method comprising:

preparing configuration information comprising at least a handover execution condition for a primary cell and an execution condition for at least one primary secondary cell with delayed dual connectivity execution enabled, and sending the configuration information towards a user equipment;

if it is determined that the handover execution condition for the primary cell is satisfied but the execution condition for an associated primary secondary cell is not satisfied,

in response to received primary secondary cell related measurement results from the user equipment, deciding whether there is a chance for the execution condition for the associated primary secondary cell to be fulfilled in a predetermined time period; and if there is,

enabling completion of conditional handover to the primary cell and postponing enabling completion of execution of the associated primary secondary cell for dual connectivity,

wherein during postponing,

maintaining the configuration of at least one configured primary secondary cell,

receiving information related to performed measurements related to at least one of the maintained primary secondary cells, from the user equipment,

requesting the user equipment to access the associated primary secondary cell for which measurement information has been received, by sending a trigger to the user equipment, and

enabling the user equipment to access the associated primary secondary cell.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 26, 2025
From: GÜRSU, HALIT MURAT; KARABULUT, UMUR; SPAPIS, PANAGIOTIS; AWADA, AHMAD
To: NOKIA SOLUTIONS AND NETWORKS GMBH & CO. KG
Reel/Frame 071525/0801 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 26, 2025
From: PALKA, DARIUSZ
To: NOKIA SOLUTIONS AND NETWORKS SP. Z.O.O
Reel/Frame 071525/0805 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 26, 2025
From: NOKIA SOLUTIONS AND NETWORKS GMBH & CO. KG
To: NOKIA TECHNOLOGIES OY
Reel/Frame 071525/0808 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 26, 2025
From: NOKIA SOLUTIONS AND NETWORKS SP. Z.O.O
To: NOKIA TECHNOLOGIES OY
Reel/Frame 071525/0812 →
Priority Claims (1)
FI 20236088 · Sep 29, 2023 · national
Continuity (1)
Related Publication 20250113281A1 · Apr 3, 2025
References Cited (25)
US 10849026B2 · Kubota · 2020 [cited by examiner]
US 12317143B2 · Damnjanovic · 2025 [cited by examiner]
US 20200267789A1 · Tsai · 2020 [cited by applicant]
US 20210258843A1 · Awada et al. · 2021 [cited by applicant]
US 20240155450A1 · Gürsu et al. · 2024 [cited by applicant]
US 20250039847A1 · Lin · 2025 [cited by examiner]
US 20250056364A1 · Liu · 2025 [cited by examiner]
US 20250106702A1 · Liu · 2025 [cited by examiner]
US 20250374137A1 · Wallentin · 2025 [cited by examiner]
WO 2021162870A1 · 2021 [cited by applicant]
WO WO2022028918A1 · 2022 [cited by examiner]
WO 2022058069A1 · 2022 [cited by applicant]
WO 2022151417A1 · 2022 [cited by applicant]
WO WO2024237833A1 · 2024 [cited by examiner]
“Msc-generator”, Sourceforge, Retrieved on Nov. 7, 2024, Webpage available at :https://sourceforge.net/projects/msc-generator/. [cited by applicant]
“3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Multiplexing and channel coding (Release 17)”, 3GPP TS 38.212, V17.5.0, Mar. 2023, pp. 1-203. [cited by applicant]
“3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Medium Access Control (MAC) protocol specification (Release 17)”, 3GPP TS 38.321, V17.5.0, Jun. 2023, pp. 1-253. [cited by applicant]
“3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NG-RAN; F1 application protocol (F1AP) (Release 17)”, 3GPP TS 38.473, V17.5.0, Jun. 2023, pp. 1-662. [cited by applicant]
“3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Radio Resource Control (RRC); Protocol specification (Release 17)”, 3GPP TS 3… [cited by applicant]
“3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; NR and NG-RAN Overall Description; Stage 2 (Release 16)”, 3GPP TS 38.300, V16.6.0, Jun. 2021, pp. 1-152. [cited by applicant]
“3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NG-RAN; Architecture description (Release 16)”, 3GPP TS 38.401, V16.6.0, Jul. 2021, pp. 1-79. [cited by applicant]
“3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Study on new radio access technology: Radio access architecture and interfaces (Release 14)”, 3GPP TR 38.801, V14.0.0, Mar. 2017, … [cited by applicant]
“3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Radio Resource Control (RRC) protocol specification (Release 16)”, 3GPP TS 38.331, V16.5.0, Jun. 2021, pp. 1-959. [cited by applicant]
Office Action received for corresponding Finnish Patent Application No. 20236088, dated Apr. 24, 2024, 11 pages. [cited by applicant]
“Conditional PSCell addition/change”, 3GPP RANWG2 Meeting #108, R2-1914877, Agenda: 6.9.4, InterDigital Inc., Nov. 18-22, 2019, 4 pages. [cited by applicant]