IP Library › Granted Patent US 12,751,244
Granted Patent B2
US 12,751,244 · App. 18/814,094 · Granted Sep 29, 2026

Prevention of contamination of substrates during gas purging

Inventors: Douglas Brian Baumgarten (Round Rock, TX); Russell Kaplan (Sunnyvale, CA); Amitabh Puri (San Jose, CA); Paul B. Reuter (Austin, TX)
Assignee: Applied Materials, Inc.
H10P72/1924C23C16/54H10P72/06H10P72/3406C23C16/4408C23C16/45563C23C16/458C23C16/52H10P72/3408Y10T137/0402
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,751,244
App. No.
18/814,094
Granted
Sep 29, 2026
Kind
B2
Abstract

Disclosed are implementations for efficient purging of substrate carriers (and content held therein) and preventing external contaminants from entering a gas purge apparatus by coupling the gas purge apparatus to a substrate carrier, performing a first gas purging session of an environment of the substrate carrier, receiving a first signal of a first signal type, responsive to receiving the first signal, keeping the gas purge apparatus coupled to the substrate carrier, performing a second gas purging session of the environment of the substrate carrier, receiving a second signal of a second signal type, and, responsive to receiving the second signal, decoupling the purge apparatus from the substrate carrier.

Claims (52)

1 . A purge apparatus comprising:

one or more nozzles; and

a controller to:

cause performance, via the one or more nozzles, of a plurality of gas purging sessions of an environment of a substrate carrier coupled to the one or more nozzles; and

cause, responsive to one or more signals received by the controller and indicating that at least one gas purging session of the plurality of gas purging sessions is yet to be performed, coupling of the one or more nozzles to the substrate carrier to be maintained throughout the plurality of gas purging sessions.

2 . The purge apparatus of claim 1 , wherein to cause performance of the plurality of gas purging sessions, the controller is to:

cause alignment of a gas delivery nozzle of the one or more nozzles with a gas inlet port of the substrate carrier; and

cause alignment of a gas exhaust nozzle of the one or more nozzles with a gas outlet port of the substrate carrier.

3 . The purge apparatus of claim 1 , wherein the environment of the substrate carrier comprises one or more content items, wherein the one or more content items comprise at least one of a substrate or a process kit ring.

4 . The purge apparatus of claim 1 , wherein to cause coupling of the one or more nozzles to the substrate carrier to be maintained throughout the plurality of gas purging sessions, the controller is to:

cause performance of a first gas purging session of the plurality of gas purging sessions of the environment of the substrate carrier;

receive a first signal of the one or more signals;

cause, responsive to receiving the first signal, coupling of the one or more nozzles to the substrate carrier to be maintained;

cause performance of a second gas purging session of the plurality of gas purging sessions of the environment of the substrate carrier;

receive a second signal of the one or more signals; and

cause, responsive to receiving the second signal, decoupling of the one or more nozzles from the substrate carrier.

5 . The purge apparatus of claim 4 , wherein causing performance of the first gas purging session is responsive to coupling the one or more nozzles to the substrate carrier.

6 . The purge apparatus of claim 5 , wherein the first signal indicates that the second gas purging session is upcoming.

7 . The purge apparatus of claim 5 , wherein the second signal indicates that no additional purging session is upcoming.

8 . A system comprising:

a load port assembly comprising a purge apparatus to output a flow of gas through one or more nozzles;

a factory interface coupled to at least one of a load lock chamber, a transfer chamber, or a processing chamber, wherein the factory interface is to operatively couple to a substrate carrier; and

one or more controllers to:

cause performance, via the one or more nozzles, of a plurality of gas purging sessions of an environment of a substrate carrier coupled to the one or more nozzles; and

cause, responsive to one or more signals received by the one or more controllers and indicating that at least one gas purging session of the plurality of gas purging sessions is yet to be performed, coupling of the one or more nozzles to the substrate carrier to be maintained throughout the plurality of gas purging sessions.

9 . The system of claim 8 , wherein to cause performance of the plurality of gas purging sessions, the one or more controllers are to:

cause alignment of a gas delivery nozzle of the one or more nozzles with a gas inlet port of the substrate carrier; and

cause alignment of a gas exhaust nozzle of the one or more nozzles with a gas outlet port of the substrate carrier.

10 . The system of claim 8 , wherein the environment of the substrate carrier comprises one or more content items, wherein the one or more content items comprise at least one of a substrate or a process kit ring.

11 . The system of claim 8 , wherein to cause coupling of the one or more nozzles to the substrate carrier to be maintained throughout the plurality of gas purging sessions, the one or more controllers are to:

cause performance of a first gas purging session of the plurality of gas purging sessions of the environment of the substrate carrier;

receive a first signal of the one or more signals;

cause, responsive to receiving the first signal, coupling of the one or more nozzles to the substrate carrier to be maintained;

cause performance of a second gas purging session of the plurality of gas purging sessions of the environment of the substrate carrier;

receive a second signal of the one or more signals; and

cause, responsive to receiving the second signal, decoupling of the one or more nozzles from the substrate carrier.

12 . The system of claim 11 , wherein causing performance of the first gas purging session is responsive to coupling the one or more nozzles to the substrate carrier.

13 . The system of claim 12 , wherein the first signal indicates that the second gas purging session is upcoming.

14 . The system of claim 12 , wherein the second signal indicates that no additional purging session is upcoming.

15 . The system of claim 12 , wherein the load port assembly comprises a movable receiving plate, wherein the movable receiving plate houses the one or more nozzles.

16 . The system of claim 12 , wherein the one or more controllers are further to:

cause alignment of a gas delivery nozzle with a gas inlet port of the substrate carrier; and

cause alignment of a gas exhaust nozzle with a gas outlet port of the substrate carrier.

17 . The system of claim 12 , wherein the one or more controllers are further to:

cause performance of one or more substrate processing operations.

18 . The system of claim 17 , wherein a first substrate processing operation of the one or more substrate processing operations comprises transferring a substrate from the substrate carrier to the factory interface.

19 . The system of claim 18 , wherein a second substrate processing operation of the one or more substrate processing operations comprises transferring the substrate from the factory interface to a processing chamber.

20 . A system comprising:

a memory device; and

one or more processing devices communicatively coupled to the memory device, to:

cause performance, via one or more nozzles of a gas purge apparatus, of a plurality of gas purging sessions of an environment of a substrate carrier coupled to the one or more nozzles; and

cause, responsive to one or more signals received by the one or more processing devices and indicating that at least one gas purging session of the plurality of gas purging sessions is yet to be performed, coupling of the one or more nozzles to the substrate carrier to be maintained throughout the plurality of gas purging sessions.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 23, 2024
From: BAUMGARTEN, DOUGLAS BRIAN; KAPLAN, RUSSELL; PURI, AMITABH; REUTER, PAUL B.
To: APPLIED MATERIALS, INC.
Reel/Frame 068388/0034 →
Continuity (3)
Continuation 18474116 · Sep 25, 2023
Division 16946872 · Jul 9, 2020
Related Publication 20250038024A1 · Jan 30, 2025
References Cited (22)
US 5988233A · Fosnight · 1999 [cited by examiner]
US 10192765B2 · Koshti · 2019 [cited by examiner]
US 10446428B2 · Reuter · 2019 [cited by examiner]
US 10512948B2 · Iwamoto · 2019 [cited by examiner]
US 10763134B2 · Rice · 2020 [cited by examiner]
US 11171028B2 · Pannese · 2021 [cited by examiner]
US 11244844B2 · Reuter · 2022 [cited by examiner]
US 12074045B2 · Baumgarten · 2024 [cited by examiner]
US 20090129897A1 · Babbs · 2009 [cited by examiner]
US 20100112903A1 · Tu · 2010 [cited by examiner]
US 20130213442A1 · Kaise · 2013 [cited by examiner]
US 20150147873A1 · Moriya · 2015 [cited by examiner]
US 20160118279A1 · Iyer · 2016 [cited by examiner]
US 20160118280A1 · Wood · 2016 [cited by examiner]
US 20170025298A1 · Iwamoto · 2017 [cited by examiner]
US 20190326134A1 · Suzuki · 2019 [cited by examiner]
US 20200095676A1 · Takebayashi · 2020 [cited by examiner]
US 20200114403A1 · Iwamoto · 2020 [cited by examiner]
US 20200168488A1 · Sunugatov · 2020 [cited by examiner]
US 20200201363A1 · Hruzek · 2020 [cited by examiner]
US 20210129170A1 · Wei · 2021 [cited by examiner]
US 20220010427A1 · Baumgarten · 2022 [cited by examiner]