IP Library Granted Patent US 7,426,935
Granted Patent B2
US 7,426,935 · App. 11/105,740 · Granted Sep 23, 2008

Method of discharging high pressure storage vessels

Assignee: GM Global Technology Operations, Inc.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,426,935
App. No.
11/105,740
Granted
Sep 23, 2008
Kind
B2
Abstract

A master/slave tank system for storing a compressed hydrogen gas, where the system employs an electrically driven shut-off valve for each tank in the system. The tank system includes a master tank and a slave tank for storing the gas. A first line is coupled to the master tank for providing the gas stored therein to a fuel cell stack. A master tank shut-off valve is positioned in the first line between the master tank and a pressure regulator. A second line is coupled to the slave tank for providing the gas stored therein to the master tank as the pressure difference between the slave tank and the master tank changes. An electrically driven slave tank shut-off valve is positioned within the second line, where the slave tank shut-off valve automatically closes the second line in response to an increase in the differential pressure across the slave tank valve.

Claims (42)

1. A master/slave tank system comprising:

a master tank for storing a gas;

at least one slave tank for storing the gas;

a first line coupled to the master tank for providing the gas stored within the master tank to a gas-using device;

at least one pressure regulator positioned in the first line between the master tank and the gas-using device;

a master tank shut-off valve positioned in the first line between the master tank and the at least one pressure regulator;

a second line for providing the gas stored within the at least one slave tank to the master tank, wherein the at least one slave tank provides the gas to the master tank on the second line as the pressure difference between the slave tank and the master tank changes when the gas is output from the master tank on the first line; and

an electrically driven solenoid slave tank shut-off valve positioned within the second line, wherein a differential pressure across the slave tank shut-off valve is relatively low, said slave tank shut-off valve automatically closing the at least one slave tank in response to an increased differential pressure across the slave tank shut-off valve that overcomes an electrical signal applied to the valve.

2. The system according to claim 1 wherein the at least one pressure regulator is two pressure regulators positioned in the first line, wherein the master tank shut-off valve is positioned in the first line upstream of the pressure regulator closest to the master tank.

3. The system according to claim 1 wherein the at least one slave tank is at least two slave tanks coupled to the second line, wherein each slave tank includes a an electrically driven solenoid slave tank shut-off valve that automatically closes the respective slave tank in response to an increased differential pressure across the slave tank-shut-off valve, wherein the differential pressure across the slave tank shut-off valve is relatively low.

4. The system according to claim 1 further comprising a third line and a fourth line both in fluid communication with the second line, said third line being a refueling line for refueling the master tank through the second line and the fourth line and refueling the at least one slave tank through the second line.

5. The system according to claim 4 further comprising a check valve positioned within a by-pass line provided around the slave tank shut-off valve, said check valve allowing the refueling gas to by-pass the slave tank shut-off valve on the by-pass line during refueling and preventing the gas that supplies the master tank from by-passing the slave tank shut-off valve.

6. The system according to claim 4 wherein the slave tank shut-off valve is part of a shut-off valve assembly that includes a check valve that allows the refueling gas to by-pass the slave tank shut-off valve during refueling and preventing the gas that supplies the master tank from by-passing the slave tank shut-off valve.

7. The system according to claim 1 further comprising a low pressure shut-off valve positioned in the first line between the at least one pressure regulator and the gas-using device.

8. The system according to claim 1 further comprising a first thermal activated pressure relief valve positioned in a third line coupled to the master tank and a second thermal activated pressure relief valve positioned in a fourth line coupled to the at least one slave tank.

9. The system according to claim 1 wherein the gas is compressed hydrogen.

10. The system according to claim 9 wherein the gas-using device is a fuel cell stack.

11. The system according to claim 10 wherein the fuel cell stack in part of a fuel cell system on a vehicle.

12. A master/slave tank system for storing hydrogen gas for a fuel cell stack, said system comprising:

a master tank for storing the gas;

at least one slave tank for storing the gas;

a first line coupled to the master tank for providing the gas stored within the master tank to the fuel cell stack;

a first pressure regulator and a second pressure regulator positioned in the first line between the master tank and the fuel cell stack, said first pressure regulator being closer to the master tank than the second pressure regulator;

an electrically driven master tank shut-off valve positioned in the first line between the master tank and the first pressure regulator, wherein a differential pressure across the master tank shut-off valve could be relatively high based on the tank pressure;

a second line coupled to the at least one slave tank for providing the gas stored within the at least one slave tank to the master tank, wherein the at least one slave tank provides the gas to the master tank on the second line as the pressure difference between the slave tank and the master tank changes when the gas is output from the master tank on the first line; and

an electrically driven slave tank shut-off valve positioned within the second line, wherein a differential pressure across the slave tank shut-off valve is relatively low, said slave tank shut-off valve automatically closing the at least one slave tank in response to an increased differential pressure across the slave tank shut-off valve.

13. The system according to claim 12 wherein the at least one slave tank is at least two slave tanks coupled to the second line, wherein each slave tank includes an electrically driven slave tank shut-off valve that automatically closes in response to an increase in the differential pressure across the slave tank shut-off valve.

14. The system according to claim 12 further comprising a third line and a fourth line in fluid communication with the second line, said third line being a refueling line for refueling the master tank through the second line and the fourth line and refueling the at least one slave tank through the second line.

15. The system according to claim 14 further comprising a check valve positioned within a by-pass line provided around the slave tank shut-off valve, said check valve allowing the refueling gas to by-pass the slave tank shut-off valve on the by-pass line during refueling and preventing the gas that supplies the master tank from the at least one slave tank from by-passing the slave tank shut-off valve.

16. The system according to claim 14 wherein the slave tank shut-off valve is part of a shut-off valve assembly that includes a check valve that allows the refueling gas to by-pass the slave tank shut-off valve during refueling and preventing the gas that supplies the master tank from by-passing the slave tank shut-off valve.

17. The system according to claim 12 further comprising a low pressure shut-off valve positioned in the first line between the second pressure regulator and the fuel cell stack.

18. The system according to claim 12 further comprising a first thermal activated pressure relief valve positioned in a third line coupled to the master tank and a second thermal activated pressure relief valve positioned in a fourth line coupled to the at least one slave tank.

19. A master/slave tank system comprising:

a first tank for storing a gas;

a second tank for storing the gas;

a first line coupled to the first tank for providing the gas stored within the first tank to a gas-using device;

at least one pressure regulator positioned in the first line between the first tank and the gas-using device;

a first electrically driven solenoid shut-off valve positioned in the first line between the first tank and the at least one pressure regulator; and

a second elecrically driven solenoid shut-off valve positioned within a second line proximate to the second tank, wherein a differential pressure across the second shut-off valve is relatively low, said second shut-off valve automatically closing the second line in response to a gas leak and an increased differential pressure across the second shut-off valve that overcomes an elecrical signal applied to the second shut-off valve.

20. The system according to claim 19 further comprising a third line and a fourth line in fluid communication with the second line, said third line being a refueling line for refueling the first tank through the second line and the fourth line and refueling the second tank through the second line.

21. The system according to claim 20 further comprising a check valve positioned within a by-pass line around the second shut-off valve, said check valve allowing the refueling gas to by-pass the second shut-off valve on the by-pass line during refueling.

22. The system according to claim 19 wherein the gas is compressed hydrogen and the gas-using device is a fuel cell stack.

Assignments (12)
RELEASE OF SECURITY INTEREST Recorded Nov 7, 2014
From: WILMINGTON TRUST COMPANY
To: GM GLOBAL TECHNOLOGY OPERATIONS LLC
Reel/Frame 034371/0676 →
CHANGE OF NAME Recorded Feb 10, 2011
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: GM GLOBAL TECHNOLOGY OPERATIONS LLC
Reel/Frame 025780/0936 →
SECURITY AGREEMENT Recorded Nov 8, 2010
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: WILMINGTON TRUST COMPANY
Reel/Frame 025327/0001 →
RELEASE OF SECURITY INTEREST Recorded Nov 4, 2010
From: UNITED STATES DEPARTMENT OF THE TREASURY
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 025245/0442 →
RELEASE OF SECURITY INTEREST Recorded Nov 4, 2010
From: UAW RETIREE MEDICAL BENEFITS TRUST
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 025311/0770 →
SECURITY AGREEMENT Recorded Aug 28, 2009
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: UAW RETIREE MEDICAL BENEFITS TRUST
Reel/Frame 023162/0001 →
SECURITY AGREEMENT Recorded Aug 27, 2009
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: UNITED STATES DEPARTMENT OF THE TREASURY
Reel/Frame 023156/0052 →
RELEASE OF SECURITY INTEREST Recorded Aug 21, 2009
From: CITICORP USA, INC. AS AGENT FOR BANK PRIORITY SECURED PARTIES; CITICORP USA, INC. AS AGENT FOR HEDGE PRIORITY SECURED PARTIES
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 023127/0468 →
RELEASE OF SECURITY INTEREST Recorded Aug 20, 2009
From: UNITED STATES DEPARTMENT OF THE TREASURY
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 023124/0429 →
SECURITY AGREEMENT Recorded Apr 16, 2009
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: CITICORP USA, INC. AS AGENT FOR BANK PRIORITY SECURED PARTIES; CITICORP USA, INC. AS AGENT FOR HEDGE PRIORITY SECURED PARTIES
Reel/Frame 022553/0446 →
SECURITY AGREEMENT Recorded Feb 3, 2009
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: UNITED STATES DEPARTMENT OF THE TREASURY
Reel/Frame 022195/0334 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 14, 2005
From: SCHWAN, MIRKO; WINKELMANN, HOLGER; OELERICH, WOLFGANG
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 016518/0651 →
Continuity (1)
Related Publication 20060231144A1 · Oct 19, 2006