IP Library Granted Patent US 6,784,550
Granted Patent Utility
US 6,784,550 · Confirmation No. 2426

THERMAL PROCESSING OF METAL ALLOYS FOR AN IMPROVED CMP PROCESS IN INTEGRATED CIRCUIT FABRICATION

⬇ PDF
Code Description Pages PDF
2005-05-17 COCOUT Certificate of Correction - Post Issue Communication 1 View
2005-02-22 COCIN Request for Certificate of Correction 4 View
2004-07-15 IFEE Issue Fee Payment (PTO-85B) 2 View
2004-04-19 NOA Notice of Allowance and Fees Due (PTOL-85) 3 View
2004-04-19 NOA Notice of Allowance and Fees Due (PTOL-85) 3 View
2004-04-19 1449 List of References cited by applicant and considered by examiner 1 View
2004-04-19 IIFW Issue Information including classification, examiner, name, claim, renumbering, etc. 1 View
2004-04-19 SRFW Search information including classification, databases and other search related notes 1 View
2004-01-30 WFEE Fee Worksheet (SB06) 1 View
2004-01-30 WCLM Claims Worksheet (PTO-2022) 1 View
2003-12-22 IDS Information Disclosure Statement (IDS) Form (SB08) 2 View
2003-12-22 A... Amendment/Request for Reconsideration-After Non-Final Rejection 1 View
2003-12-22 CLM Claims 6 View
2003-12-22 REM Applicant Arguments/Remarks Made in an Amendment 2 View
2003-12-22 XT/ Extension of Time 1 View
2003-12-22 LET. Miscellaneous Incoming Letter 2 View
2003-08-21 CTNF Non-Final Rejection 6 View
2003-08-21 892 List of references cited by examiner 1 View
2003-08-07 SA.. Supplemental Response or Supplemental Amendment 2 View
2003-08-07 CLM Claims 6 View
2003-08-07 REM Applicant Arguments/Remarks Made in an Amendment 2 View
2003-05-30 A... Amendment/Request for Reconsideration-After Non-Final Rejection 1 View
2003-05-30 CLM Claims 5 View
2003-05-30 REM Applicant Arguments/Remarks Made in an Amendment 3 View
2003-02-26 CTNF Non-Final Rejection 4 View
2003-02-26 1449 List of References cited by applicant and considered by examiner 1 View
2002-12-10 IDS Information Disclosure Statement (IDS) Form (SB08) 1 View
2002-12-10 A... Amendment/Request for Reconsideration-After Non-Final Rejection 1 View
2002-12-10 CLM Claims 6 View
2002-12-10 REM Applicant Arguments/Remarks Made in an Amendment 3 View
2002-12-10 XT/ Extension of Time 1 View
2002-09-05 CTNF Non-Final Rejection 5 View
2002-09-05 892 List of references cited by examiner 1 View
2002-09-05 1449 List of References cited by applicant and considered by examiner 1 View
2001-12-07 PEFR Applicant Response to Pre-Exam Formalities Notice 3 View
2001-10-01 PEFN Pre-Exam Formalities Notice 1 View
2001-08-30 TRNA Transmittal of New Application 1 View
2001-08-30 A.PE Preliminary Amendment 6 View
2001-08-30 SPEC Specification 9 View
2001-08-30 CLM Claims 4 View
2001-08-30 ABST Abstract 1 View
2001-08-30 DRW Drawings-only black and white line drawings 3 View
2001-08-30 OATH Oath or Declaration filed 7 View
2001-08-30 IIFW Issue Information including classification, examiner, name, claim, renumbering, etc. 1 View
2001-08-30 SRFW Search information including classification, databases and other search related notes 1 View
2001-08-30 FWCLM Index of Claims 1 View
2001-08-30 TRNA Transmittal of New Application 1 View
2001-08-30 DRW Drawings-only black and white line drawings 3 View
2001-08-30 SPEC Specification 9 View
2001-08-30 CLM Claims 4 View
2001-08-30 ABST Abstract 1 View
2001-08-30 OATH Oath or Declaration filed 7 View
2001-08-30 WFEE Fee Worksheet (SB06) 2 View
2001-08-30 WCLM Claims Worksheet (PTO-2022) 1 View
2001-08-30 IDS Information Disclosure Statement (IDS) Form (SB08) 1 View
2001-08-30 A.PE Preliminary Amendment 1 View
2001-08-30 CLM Claims 4 View
2001-08-30 REM Applicant Arguments/Remarks Made in an Amendment 1 View
2001-08-30 SRNT Examiner's search strategy and results 2 View
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this application's details
Quick Facts
Patent No.
US 6,784,550
App. No.
09/945,536
Filed
2001-08-30
Granted
2004-08-31
Pub. No.
US20020033498A1
Art Unit
2825
PTA
-40 days