IP Library Granted Patent US 6,988,371
Granted Patent B2
US 6,988,371 · App. 10/853,430 · Granted Jan 24, 2006

Automotive HVAC system and method of operating same utilizing evaporator freezing

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 6,988,371
App. No.
10/853,430
Granted
Jan 24, 2006
Kind
B2
Abstract

The present invention concerns a method for cooling a passenger compartment in a hybrid vehicle that operates an engine intermittently during vehicle operation, the hybrid vehicle having an HVAC system including an HVAC duct, a blower adapted to direct a flow of air through the HVAC duct, and an evaporator located within the HVAC duct. The method includes the steps of operating the blower; operating the compressor; allowing a predetermined amount of ice to form on the evaporator during operation of the compressor; turning off the vehicle engine; ceasing operation of the compressor; measuring an indicator corresponding to a remaining amount of the predetermined amount of ice formed on the evaporator; and re-starting the compressor when a predetermined air temp in air duct is reached.

Claims (25)

1. A method for cooling a passenger compartment in a hybrid vehicle that operates an engine intermittently during vehicle operation, the hybrid vehicle having an HVAC system including an HVAC duct, a blower adapted to direct a flow of air through the HVAC duct, and an evaporator located within the HVAC duct, the method comprising the steps of:

a) operating said blower;

b) operating said compressor, whereby refrigerant flows through said evaporator and absorbs heat from air flowing in said air duct;

c) allowing a predetermined amount of ice to form on said evaporator during operation of said compressor;

d) turning off the vehicle engine;

e) performing one of ceasing or significantly reducing the capacity of the compressor;

f) measuring an indicator corresponding to a remaining amount of the predetermined amount of ice formed on the evaporator; and

g) performing one of re-starting or significantly increasing the capacity of the compressor when a predetermined air temperature in air duct is reached.

2. The method according to claim 1 wherein step f) is performed by measuring a pressure drop in airflow across said evaporator.

3. The method according to claim 2 wherein said pressure drop is measured by at least a pair of pressure gauges mounted on opposite sides of said evaporator.

4. The method according to claim 1 wherein step f) is performed by measuring a change in an emissivity value at said predetermined location of said evaporator.

5. The method according to claim 4 wherein said emissivity value is measured by an emissivity measuring device.

6. The method according to claim 1 wherein said ice is formed on a predetermined location of said evaporator and the predetermined location on said evaporator is adjacent a refrigerant outlet of said evaporator.

7. The method according to claim 1 wherein step g) is performed when the indicator measures a predetermined value corresponding to a predetermined amount of remaining ice.

8. The method according to claim 1 wherein step g) is performed until a measured temperature in said air duct is equal to or greater than a measured temperature in said vehicle body.

9. The method according to claim 1 including, after step d), and before step e), actuating a damper in said air duct to provide only air recirculated from a passenger compartment to said air duct.

10. A method for cooling a passenger compartment in a vehicle that operates a HVAC compressor intermittently during vehicle operation, the vehicle having a HVAC system including a HVAC duct, a blower adapted to direct a flow of air through the HVAC duct, and an evaporator located within the HVAC duct, the method comprising the steps of:

a) operating said blower;

b) operating said compressor, whereby refrigerant flows through said evaporator and absorbs heat from air flowing in said air duct;

c) allowing a predetermined amount of ice to form on said evaporator during operation of said compressor;

d) performing one of ceasing or significantly reducing capacity of the compressor;

e) detecting a remaining amount of the predetermined amount of ice formed on the evaporator; and

f) performing one of re-starting or significantly increasing the capacity of the compressor when a predetermined air temperature in air duct is reached.

11. The method according to claim 10 wherein step f) is performed when the remaining amount of the predetermined amount of ice formed on the evaporator is equal to a predetermined value corresponding to a predetermined amount of remaining ice.

12. The method according to claim 10 including, after step d), and before step e), actuating a damper in said air duct to provide only air recirculated from a passenger compartment to said air duct.

Assignments (13)
RELEASE OF SECURITY INTEREST Recorded Nov 7, 2014
From: WILMINGTON TRUST COMPANY
To: GM GLOBAL TECHNOLOGY OPERATIONS LLC
Reel/Frame 034371/0676 →
CHANGE OF NAME Recorded Feb 10, 2011
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: GM GLOBAL TECHNOLOGY OPERATIONS LLC
Reel/Frame 025780/0936 →
SECURITY AGREEMENT Recorded Nov 8, 2010
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: WILMINGTON TRUST COMPANY
Reel/Frame 025327/0001 →
RELEASE OF SECURITY INTEREST Recorded Nov 4, 2010
From: UNITED STATES DEPARTMENT OF THE TREASURY
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 025245/0442 →
RELEASE OF SECURITY INTEREST Recorded Nov 4, 2010
From: UAW RETIREE MEDICAL BENEFITS TRUST
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 025311/0770 →
SECURITY AGREEMENT Recorded Aug 28, 2009
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: UAW RETIREE MEDICAL BENEFITS TRUST
Reel/Frame 023162/0001 →
SECURITY AGREEMENT Recorded Aug 27, 2009
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: UNITED STATES DEPARTMENT OF THE TREASURY
Reel/Frame 023156/0052 →
RELEASE OF SECURITY INTEREST Recorded Aug 21, 2009
From: CITICORP USA, INC. AS AGENT FOR BANK PRIORITY SECURED PARTIES; CITICORP USA, INC. AS AGENT FOR HEDGE PRIORITY SECURED PARTIES
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 023127/0468 →
RELEASE OF SECURITY INTEREST Recorded Aug 20, 2009
From: UNITED STATES DEPARTMENT OF THE TREASURY
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 023124/0429 →
SECURITY AGREEMENT Recorded Apr 16, 2009
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: CITICORP USA, INC. AS AGENT FOR BANK PRIORITY SECURED PARTIES; CITICORP USA, INC. AS AGENT FOR HEDGE PRIORITY SECURED PARTIES
Reel/Frame 022553/0446 →
SECURITY AGREEMENT Recorded Feb 4, 2009
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: UNITED STATES DEPARTMENT OF THE TREASURY
Reel/Frame 022201/0610 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 14, 2009
From: GENERAL MOTORS CORPORATION
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 022092/0886 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 11, 2004
From: SALIM, MUNTHER M.; MAJOR, GREGORY A.; BOZEMAN, JEFFREY A.
To: GENERAL MOTORS CORPORATION
Reel/Frame 015007/0802 →