IP Library Granted Patent US 11,275,427
Granted Patent B2
US 11,275,427 · App. 17/328,275 · Granted Mar 15, 2022

Methods and systems for distributed power control of flexible datacenters

Inventors: Michael T. McNamara (Newport Beach, CA); David J. Henson (Houston, TX); Raymond E. Cline, Jr. (Houston, TX)
Assignee: LANCIUM LLC
G06F1/3234G06F1/324G06F1/329G06F1/3287G06F1/3296
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,275,427
App. No.
17/328,275
Granted
Mar 15, 2022
Kind
B2
Abstract

In an example embodiment, a distributed power control system can include a datacenter and a remote master control system. The datacenter can include (i) computing systems, (ii) a behind-the-meter power input system configured to receive power from a behind-the-meter power source and deliver power to the computing systems, and (iii) a datacenter control system configured to control the computing systems and the behind-the-meter power input system. The remote master control system can be configured to issue instructions to the datacenter that affect an amount of behind-the-meter power consumed by the datacenter. The datacenter control system can receive, from a local station control system configured to at least partially control the behind-the-meter power source, a directive for the datacenter to ramp-down power consumption, and in response to receiving the directive, cause the computing systems to perform a set of predetermined operations correlated with the directive.

Claims (33)

1. A distributed power control system comprising:

a flexible datacenter comprising a plurality of computing systems powered by a power input system, the power input system configured to receive behind-the-meter power from a power generation station prior to the power undergoing step-up transformation for transmission to a grid, and to deliver the power to the plurality of computing systems;

a local station control system associated with the power generation station, the local station control system configured to issue a first operational directive that affects an amount of power consumed by the flexible datacenter;

a remote master control system operated independently of the local station control system and configured to issue a second operational directive that affects the amount of power consumed by the flexible datacenter; and

a datacenter control system associated with the flexible datacenter and operable independently of the local station control system, the datacenter control system configured to control the amount of power consumed by the flexible datacenter by one or more of:

(i) modulating the amount of power consumed by the flexible datacenter in response to the first operational directive;

(ii) modulating the amount of power consumed by the flexible datacenter in response to the second operational directive; and

(iii) modulating the amount of power consumed by the flexible datacenter based on at least one monitored condition.

2. The distributed power control system of claim 1 , wherein the datacenter control system disables delivery of the behind-the-meter power to a computing system of the plurality of computing systems in response to the first operational directive regardless of the second operational directive.

3. The distributed power control system of claim 1 , wherein the datacenter control system further is operable independently of the remote master control system.

4. The distributed power control system of claim 1 , wherein the datacenter control system modulates the amount of power consumed by the flexible datacenter independently from one or both of the first operational directive and the second operational directive.

5. The distributed power control system of claim 1 , wherein the datacenter control system modulates the amount of power consumed by the flexible datacenter collectively with one or both of the first operational directive and the second operational directive.

6. The distributed power control system of claim 1 , wherein the datacenter control system modulates the amount of power consumed by the flexible datacenter independently from the local station control system and the remote master control system.

7. The distributed power control system of claim 1 , wherein the datacenter control system modulates the amount of power consumed by the flexible datacenter collectively with one or both of the local station control system and the remote master control system.

8. The distributed power control system of claim 1 , wherein the local station control system issues the first operational directive to the datacenter control system.

9. The distributed power control system of claim 1 , wherein the local station control system issues the first operational directive to the remote master control system, which in turn issues the first operational directive to the datacenter control system.

10. The distributed power control system of claim 1 , wherein the datacenter control system enables and disables delivery of the behind-the-meter power to a computing system of the plurality of computing systems in response to the first operational directive.

11. The distributed power control system of claim 10 , wherein the datacenter control system further enables and disables delivery of the behind-the-meter power to the computing system of the plurality of computing systems in response to the second operational directive.

12. The distributed power control system of claim 1 , wherein at least one of the first operational objective and the second operational objective is responsive to the at least one monitored condition.

13. The distributed power control system of claim 10 , wherein the at least one monitored condition is related to unutilized power at the power generation station.

14. The distributed power control system of claim 1 , wherein the local station control system at least partially controls the power generation station.

15. The distributed power control system of claim 1 , wherein the remote master control system at least partially controls the power generation station.

16. A system comprising:

a flexible datacenter comprising a plurality of computing systems powered by a power input system, the power input system configured to receive behind-the-meter power from a power generation station prior to the power undergoing step-up transformation for transmission to a grid, and to deliver the power to the plurality of computing systems;

a local station control system configured to issue a first operational directive that affects an amount of power consumed by the flexible datacenter; and configured to issue a second operational directive that affects the amount of power consumed by the flexible datacenter; and

a datacenter control system associated with the flexible datacenter and operated independently of the local station control system and the remote master control system, the datacenter control system configured to control the amount of power consumed by the flexible datacenter by one or more of:

(i) modulating the amount of power consumed by the flexible datacenter in response to the first operational directive; and

(ii) modulating the amount of power consumed by the flexible datacenter in response to monitored conditions.

17. The distributed power control system of claim 16 , wherein the datacenter control system modulates the amount of power consumed by the flexible datacenter independently from the first operational directive.

18. The distributed power control system of claim 16 , wherein the datacenter control system modulates the amount of power consumed by the flexible datacenter collectively with the first operational directive.

19. The distributed power control system of claim 16 , wherein the datacenter control system enables and disables delivery of the behind-the-meter power to a computing system of the plurality of computing systems in response to the first operational directive.

20. The distributed power control system of claim 16 , wherein the first operational objective is responsive to the at least one monitored condition.

21. The distributed power control system of claim 20 , wherein the at least one monitored condition is related to unutilized power at the power generation station.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 4, 2023
From: MCNAMARA, MICHAEL T.; HENSON, DAVID J.; CLINE, RAYMOND E., JR.
To: LANCIUM LLC
Reel/Frame 063542/0210 →
Continuity (2)
Continuation 16132092 · Sep 14, 2018
Related Publication 20210325955A1 · Oct 21, 2021
Cited By (18)
US 12,197,240 US 12,204,945 US 12,206,246 US 12,207,433 US 12,210,911 US 12,253,898 US 12,272,957 US 12,294,217 US 12,307,301 US 12,362,563 US 12,434,586 US 12,437,348 US 12,437,349 US 12,462,312 US 12,494,650 US 12,573,855 US 12,646,939 US 12,711,560