IP Library › Granted Patent US 10,018,400
Granted Patent B2
US 10,018,400 · App. 13/965,543 · Granted Jul 10, 2018

Defrost operation management in heat pumps

Inventors: Yi Qu (Coppell, TX); Bruce Perkins (Carrollton, TX); Mark Olsen (Carrollton, TX)
Assignee: Lennox Industries Inc.
F25D21/004F24F11/41F24F11/42F24F11/43F25B30/02F25B47/022F25B47/025F25D21/008F25B2600/01F25B2700/11
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,018,400
App. No.
13/965,543
Granted
Jul 10, 2018
Kind
B2
Abstract

In various implementations, a heat pump may include heating operations and defrost operations. The heat pump may monitor cycle time(s) for one or more of the operations. Defrost operation(s) in the heat pump may be automatically adjusted based at least partially on cycle times.

Claims (52)

1. A method comprising:

initiating one or more operations of a heat pump, wherein the heat pump includes a heating operation and first and second defrost operations;

determining at least one heating operation cycle time associated with at least one heating operation of the heat pump;

determining whether to adjust a termination time of the first defrost operation based at least partially on one or more of the determined heating operation cycle times;

determining whether to adjust a termination temperature of the second defrost operation based at least partially on one or more of the determined heating operation cycle times; and

initiating at least one of the first and second defrost operations;

wherein determining whether to adjust the termination time of the first defrost operation is further based at least partially on comparing a change in temperature over time to a predetermined change in temperature.

2. The method of claim 1 further comprising determining whether to adjust a termination temperature of the first defrost operation.

3. The method of claim 1 wherein the termination temperature of the second defrost or operation comprises a default termination temperature; and further comprising:

receiving a request for alteration of the termination temperature by a user; and

altering the termination temperature based on the received request.

4. The method of claim 1 wherein initiating the at least one of the first and second defrost operations comprises allowing an unaltered defrost operation when a determination is made to not allow an adjustment of the termination time.

5. The method of claim 1 wherein initiating the at least one of the first and second defrost operations comprises allowing an altered defrost operation when a determination is made to allow an adjustment of the termination time.

6. The method of claim 1 wherein determining whether to adjust the termination temperature of the second defrost operation comprises:

comparing at least one of the determined heating operation cycle times to a predetermined cycle time; and

adjusting the termination temperature based on the comparison.

7. The method of claim 1 wherein determining whether to adjust the termination time of the first defrost operation comprises:

comparing at least one of the determined heating operation cycle times to a predetermined cycle time; and

adjusting the termination time when at least one of the determined heating operation cycle times is less than the predetermined cycle time.

8. A method comprising:

initiating one or more operations of a heat pump, wherein the heat pump includes a heating operation and first and second defrost operations;

determining at least one heating operation cycle time associated with at least one heating operation of the heat pump;

determining whether to adjust a termination time of the first defrost operation based at least partially on one or more of the determined heating operation cycle times;

determining whether to adjust a termination temperature of the second defrost operation based at least partially on one or more of the determined heating operation cycle times; and

initiating at least one of the first and second defrost operations;

wherein determining whether to adjust the termination temperature of the second defrost operation comprises:

comparing at least one of the determined heating operation cycle times to a predetermined cycle time; and

adjusting the termination temperature based on the comparison of the at least one of the determined heating cycle times and predetermined cycle time.

9. The method of claim 8 further comprising determining whether to adjust a termination temperature of the first defrost operation.

10. The method of claim 8 wherein the termination temperature of the second defrost operation comprises a default termination temperature, and the method further comprising:

receiving a request for alteration of the termination temperature by a user; and

altering the termination temperature based on the received request.

11. The method of claim 8 wherein initiating the at least one defrost operation comprises allowing an unaltered defrost operation when a determination is made to not allow an adjustment of the termination time.

12. The method of claim 8 wherein initiating the at least one defrost operation comprises allowing an altered defrost operation when a determination is made to allow an adjustment of the termination time.

13. The method of claim 8 wherein determining whether to adjust the termination time of the first defrost operation comprises:

comparing at least one of the determined heating operation cycle times to a predetermined cycle time; and

adjusting the termination time when at least one of the determined heating operation cycle times is less than the predetermined cycle time.

14. A method comprising:

initiating one or more operations of a heat pump, wherein the heat pump includes a heating operation and first and second defrost operations;

determining at least one heating operation cycle time associated with at least one heating operation of the heat pump;

determining whether to adjust a termination time of the first defrost operation based at least partially on one or more of the determined heating operation cycle times;

determining whether to adjust a termination temperature of the second defrost operation based at least partially on one or more of the determined heating operation cycle times; and

initiating at least one of the first and second defrost operation;

wherein determining whether to adjust the termination time of the first defrost operation comprises:

comparing at least one of the determined heating operation cycle times to a predetermined cycle time; and

adjusting the termination time when at least one of the determined heating operation cycle times is less than the predetermined cycle time.

15. The method of claim 14 further comprising determining whether to adjust a termination temperature of the first defrost operation.

16. The method of claim 14 wherein the termination temperature of the second defrost operation comprises a default termination temperature, and the method further comprising:

receiving a request for alteration of the termination temperature by a user; and

altering the termination temperature based on the received request.

17. The method of claim 14 wherein initiating the at least one defrost operation comprises allowing an unaltered defrost operation when a determination is made to not allow an adjustment of the termination time.

18. The method of claim 14 wherein initiating the at least one defrost operation comprises allowing an altered defrost operation when a determination is made to allow an adjustment of the termination time.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 13, 2013
From: QU, YI; PERKINS, BRUCE; OLSEN, MARK
To: LENNOX INDUSTRIES INC.
Reel/Frame 030999/0270 →
Continuity (1)
Related Publication 20150047375A1 · Feb 19, 2015
Cited By (2)
US 12,222,144 US 12,716,630