IP Library › Granted Patent US 12,222,144
Granted Patent B2
US 12,222,144 · App. 17/865,002 · Granted Feb 11, 2025

Variable capacity defrost

Inventor: Charles A. Cluff (Zionsville, IN)
Assignee: CARRIER CORPORATION
F25B47/02F24F11/41F25B49/02F25B2700/2103
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,222,144
App. No.
17/865,002
Granted
Feb 11, 2025
Kind
B2
Abstract

A method of performing a defrost operation in a heating, ventilation and air conditioning (HVAC) system having a first heat exchanger and a second heat exchanger, the method including determining that the defrost operation is needed; determining a capacity for the defrost operation in response to one or more prior defrost operations; beginning the defrost operation at the determined capacity; monitoring a defrost parameter; determining if the defrost parameter indicates a need for increased capacity; and increasing the capacity of the defrost operation when the defrost parameter indicates the need for increased capacity.

Claims (32)

1. A method of performing a defrost operation in a heating, ventilation and air conditioning (HVAC) system having a first heat exchanger and a second heat exchanger, wherein the defrost operation is performed on the second heat exchanger, the method comprising:

determining that the defrost operation is needed;

determining a capacity for the defrost operation in response to one or more prior defrost operations;

beginning the defrost operation at the determined capacity;

monitoring a defrost parameter;

determining if the defrost parameter indicates a need for increased capacity; and

increasing the capacity of the defrost operation when the defrost parameter indicates the need for increased capacity.

2. The method of claim 1 , wherein determining the capacity for the defrost operation in response to one or more prior defrost operations includes determining that an increased capacity was used in one or more prior defrost operations.

3. The method of claim 1 , wherein determining the capacity for the defrost operation in response to one or more prior defrost operations includes determining that one or more prior defrost operations was not completed within a defrost cycle time limit.

4. The method of claim 1 , wherein determining the capacity for the defrost operation in response to one or more prior defrost operations includes determining that a rate of change of a temperature of the second heat exchanger was below a threshold in one or more prior defrost operations.

5. The method of claim 1 , wherein determining the capacity for the defrost operation in response to one or more prior defrost operations includes determining that one or more prior defrost operations were completed in less than a defrost cycle time limit.

6. The method of claim 1 , wherein the defrost parameter includes one or more of time elapsed since initiating the defrost operation, a temperature of the second heat exchanger, a rate of change of the temperature of the second heat exchanger and a time remaining until a defrost cycle time limit.

7. The method of claim 6 , wherein increasing the capacity of the defrost operation includes increasing the capacity of the defrost operation when the temperature of the second heat exchanger has not reached a desired level within a predetermined time of the defrost cycle time limit.

8. The method of claim 6 , wherein increasing the capacity of the defrost operation includes increasing the capacity of the defrost operation when the rate of change of the temperature of the second heat exchanger is less than a desired level.

9. A heating, ventilation and air conditioning (HVAC) system comprising:

a first heat exchanger;

a second heat exchanger;

a temperature sensor configured to sense a temperature of the second heat exchanger;

a controller configured to execute defrost operations for the second heat exchanger including:

determining that the defrost operation is needed;

determining a capacity for the defrost operation in response to one or more prior defrost operations;

beginning the defrost operation at the determined capacity;

monitoring a defrost parameter,

determining if the defrost parameter indicates a need for increased capacity; and

increasing the capacity of the defrost operation when the defrost parameter indicates the need for increased capacity.

10. The HVAC system of claim 9 , wherein determining the capacity for the defrost operation in response to one or more prior defrost operations includes determining that an increased capacity was used in one or more prior defrost operations.

11. The HVAC system of claim 9 , wherein determining the capacity for the defrost operation in response to one or more prior defrost operations includes determining that one or more prior defrost operations was not complete within a defrost cycle time limit.

12. The HVAC system of claim 9 , wherein determining the capacity for the defrost operation in response to one or more prior defrost operations includes determining that a rate of change of a temperature of the second heat exchanger was below a threshold in one or more prior defrost operations.

13. The HVAC system of claim 9 , wherein determining the capacity for the defrost operation in response to one or more prior defrost operations includes determining that one or more prior defrost operations completed in less than a defrost cycle time limit.

14. The HVAC system of claim 9 , wherein the defrost parameter includes one or more of time elapsed since initiating the defrost operation, a temperature of the second heat exchanger, a rate of change of the temperature of the second heat exchanger and a time remaining until a defrost cycle time limit.

15. The HVAC system of claim 14 , wherein increasing the capacity of the defrost operation includes increasing the capacity of the defrost operation when the temperature of the second heat exchanger has not reached a desired level within a predetermined time of the defrost cycle time limit.

16. The HVAC system of claim 14 , wherein increasing the capacity of the defrost operation includes increasing the capacity of the defrost operation when the rate of change of the temperature of the second heat exchanger is less than a desired level.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 31, 2024
From: CLUFF, CHARLES A.
To: CARRIER CORPORATION
Reel/Frame 069084/0721 →
Continuity (2)
Provisional Application 63223141 · Jul 19, 2021
Related Publication 20230013674A1 · Jan 19, 2023
References Cited (52)
US 4604872A · Miyazaki et al. · 1986 [cited by applicant]
US 4850200A · Sugiyama · 1989 [cited by applicant]
US 4901534A · Nakatsuno et al. · 1990 [cited by applicant]
US 5538072A · Burkhart · 1996 [cited by examiner]
US 6334321B1 · Said et al. · 2002 [cited by applicant]
US 7228692B2 · Concha et al. · 2007 [cited by applicant]
US 8417386B2 · Douglas et al. · 2013 [cited by applicant]
US 9068771B2 · Shah · 2015 [cited by applicant]
US 9829237B2 · Kang et al. · 2017 [cited by applicant]
US 10018400B2 · Qu et al. · 2018 [cited by applicant]
US 10024589B2 · Taki · 2018 [cited by applicant]
US 10041714B2 · Kimura et al. · 2018 [cited by applicant]
US 10215470B2 · Nikaido et al. · 2019 [cited by applicant]
US 10544958B2 · Makino et al. · 2020 [cited by applicant]
US 10739050B2 · Shinozaki et al. · 2020 [cited by applicant]
US 10823482B2 · Chamoun et al. · 2020 [cited by applicant]
US 10889163B2 · Tada · 2021 [cited by applicant]
US 20020139132A1 · Collins · 2002 [cited by examiner]
US 20050189431A1 · Nakayama et al. · 2005 [cited by applicant]
US 20120042667A1 · Fulmer et al. · 2012 [cited by applicant]
US 20120266621A1 · Yokohara · 2012 [cited by examiner]
US 20180238598A1 · Xu · 2018 [cited by examiner]
US 20210348817A1 · Bates · 2021 [cited by examiner]
US 20230013674A1 · Cluff · 2023 [cited by examiner]
US 20230204276A1 · Ito · 2023 [cited by examiner]
CN 201772685U · 2011 [cited by applicant]
CN 102759237A · 2012 [cited by applicant]
CN 102933924A · 2013 [cited by applicant]
CN 103906984A · 2014 [cited by applicant]
CN 105674647A · 2016 [cited by applicant]
CN 106016873A · 2016 [cited by applicant]
CN 106152644A · 2016 [cited by applicant]
CN 106322829A · 2017 [cited by applicant]
CN 106595112A · 2017 [cited by applicant]
CN 107076476A · 2017 [cited by applicant]
CN 107084496A · 2017 [cited by applicant]
CN 107560253A · 2018 [cited by applicant]
CN 108692485A · 2018 [cited by applicant]
CN 109579384A · 2019 [cited by applicant]
CN 109668348A · 2019 [cited by applicant]
CN 209371565U · 2019 [cited by applicant]
CN 209386600U · 2019 [cited by applicant]
CN 209819947U · 2019 [cited by applicant]
CN 110701838A · 2020 [cited by applicant]
CN 209944808U · 2020 [cited by applicant]
CN 111336711A · 2020 [cited by applicant]
CN 111707020A · 2020 [cited by applicant]
CN 112229116A · 2021 [cited by applicant]
CN 112413949A · 2021 [cited by applicant]
EP 2853844A1 · 2015 [cited by applicant]
JP 2822705B2 · 1998 [cited by applicant]
JP 2009287794A · 2009 [cited by applicant]