IP Library Granted Patent US 10,168,527
Granted Patent B2
US 10,168,527 · App. 14/805,936 · Granted Jan 1, 2019

System and method for simultaneous multi-tube inspection of vertical tube bundles

Inventor: Kishlay Tripathy (Friendswood, TX)
Assignee: Clearwater Downstream Services, LLC
G02B23/24F22B37/003G01N21/8851G01N21/954G06T7/0008G21C17/017G01N2021/8854G01N2021/9542G01N2021/9548G06T2207/10016G06T2207/30108
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,168,527
App. No.
14/805,936
Granted
Jan 1, 2019
Kind
B2
Abstract

A multi-tube inspection system with a reel having a plurality of cameras is placed in the upper header. Each camera is attached to its own lead line and has a light source. An inspector, located in the upper header, aligns each camera with a tube and then operates the reel to simultaneously lower the cameras through their respective tube. As the cameras pass through the tubes, they capture a video image of the interior length of the tube. The video image is stored and relayed to a control center where additional inspectors can review the video image of the interior of the tube. Each video is identified and tied back to the tube in a data base. If a defect is identified, the tube can be taken out of service (blocked off) or scheduled for cleaning. Once cleaned, the tube is then reinspected.

Claims (22)

1. A method for inspecting a vertical tube bundle containing catalyst in a reactor, the method comprising:

taking the reactor out of service;

draining the tube bundle;

placing a multi-tube inspection system and an inspector within the reactor in a header above the tube bundle;

simultaneously lowering a plurality of cameras through a plurality of tubes in the tube bundle, wherein each camera passes through a separate tube; and

capturing a video image of the interior of each tube of the plurality of tubes through which the cameras pass.

2. The method of claim 1 further comprising removing the catalyst from the tube bundle.

3. The method of claim 1 further comprising:

transmitting the video image to a control room where it is reviewed by an inspector; and

identifying defects in the plurality of tubes.

4. The method of claim 3 further comprising:

listing in a database the defects identified; and

correlating the defects identified with a tube in which the defect is located.

5. The method of claim 4 further comprising:

storing the video of the interior of the plurality of the tube;

correlating the video with the tube from which it was taken; and

recording in the database the correlation between the video and the tube.

6. The method of claim 5 further comprising:

blocking off tubes containing defects;

repairing the tube containing the defect;

reinspecting the tube containing the defect; and

recording in the database the defect, tube containing the defect and a final status after reinspecting.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 11, 2024
From: CLEARWATER DOWNSTREAM SERVICES, LLC
To: MILLBROS GROUP, LLC
Reel/Frame 068558/0825 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 22, 2015
From: TRIPATHY, KISHLAY
To: CLEARWATER DOWNSTREAM SERVICES, LLC
Reel/Frame 036159/0988 →
Continuity (2)
Provisional Application 62027480 · Jul 22, 2014
Related Publication 20160025961A1 · Jan 28, 2016
Cited By (1)
US 12,339,073