IP Library › Granted Patent US 10,197,220
Granted Patent B2
US 10,197,220 · App. 14/640,645 · Granted Feb 5, 2019

Integrated storage/offloading facility for an LNG production plant

Inventor: Solomon Aladja Faka (Perth, AU)
Assignee: Woodside Energy Technologies Pty Ltd
F17C5/02B63B27/24F17C1/002F17C3/025F25J1/0022F25J1/0025F25J1/0278B63B25/16F17C2201/052F17C2203/0643F17C2203/0648F17C2205/0355F17C2221/033F17C2223/0161F17C2270/0105F17C2270/0113F17C2270/0123F25J2290/60
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,197,220
App. No.
14/640,645
Granted
Feb 5, 2019
Kind
B2
Abstract

An LNG production plant positioned at a production location adjacent to a body of water is described. The LNG production plant includes a plurality of spaced-apart facilities including a first facility and a second facility, each facility provided with plant equipment related to a pre-determined function associated with the production of LNG, where the first facility is an onshore facility and the second facility is an integrated storage/offloading facility arranged on a gravity-based structure having a base that rests on the seabed at a selected location within the body of water.

Claims (35)

1. An LNG production plant positioned at a production location adjacent to a body of water, the LNG production plant comprising:

a plurality of spaced-apart facilities including a first facility and a second facility, each facility provided with plant equipment related to a pre-determined function associated with the production of LNG, wherein the first facility is an onshore facility and the second facility is an integrated storage/offloading facility arranged on a gravity-based structure having a base that rests on the seabed at a selected location within the body of water; and

a cryogenic pipeline from the onshore facility to the integrated storage/offloading facility;

wherein:

the first facility is a liquefaction facility for receiving a stream of pre-treated gas from a gas processing facility and liquefying the pre-treated gas to produce a product stream of LNG;

the integrated storage/offloading facility includes: a first cryogenic storage tank operatively associated with the liquefaction facility for receiving and storing the product stream of LNG from the liquefaction facility via the cryogenic pipeline, a boil-off gas re-liquefaction facility, and an LNG transfer facility for transferring LNG from the first cryogenic storage tank to a second cryogenic storage tank onboard an LNG Carrier on an as-needs basis;

a subsea pipeline is provided from the integrated storage/offloading facility to the onshore gas processing plant;

boil-off gas is generated during the transfer of the LNG through the cryogenic pipeline to the first cryogenic storage tank of the integrated storage/offloading facility; and

the boil-off gas is: compressed and transferred through the subsea pipeline to the onshore facility, or recycled back to the integrated storage/offloading facility, or liquefied at the re-liquefaction facility at the offshore location.

2. The LNG production plant of claim 1 , wherein the first cryogenic storage tank of the integrated storage/offloading facility stores the LNG at a higher pressure compared with the second cryogenic storage tank of the LNG carrier.

3. The LNG production plant of claim 1 , wherein the integrated storage/offloading facility is a breakwater for the LNG Carrier.

4. The LNG production plant of claim 1 , wherein the cryogenic pipeline is a cryogenic subsea pipeline or a cryogenic pipeline on a trestle and connects to the gravity-based structure at a subsea location.

5. The LNG production plant of claim 1 , wherein the first facility is a gas processing facility for receiving raw hydrocarbons from a producing well and treating the raw hydrocarbons to remove contaminants therefrom to produce a stream of treated gas as a source of feed to the liquefaction facility for receiving the stream of treated gas from a gas processing module and liquefying the natural gas to produce LNG, and wherein the LNG transfer facility is located on the gravity-based structure with the integrated storage/offloading facility.

6. The LNG production plant of claim 1 , wherein the integrated storage/offloading facility is transportable from a construction location to an assembly location by towing or on floating barges.

7. The LNG production plant of claim 1 , wherein the integrated storage/offloading facility is transportable from an assembly location to the production location by towing or on floating barges.

8. The LNG production plant of claim 1 , wherein commissioning of the integrated storage/offloading facility is done at an onshore construction location or an onshore assembly location prior to transportation of integrated storage/offloading facility to the production location.

9. The LNG production plant of claim 1 , wherein the integrated storage/offloading facility includes a ballast storage compartment, and the integrated storage/offloading facility is settled into the selected location by way of addition of a ballasting material to the ballast storage compartment.

10. The LNG production plant of claim 9 , wherein the ballast storage compartment is arranged around the periphery of the integrated storage/offloading facility or arranged toward the base of the integrated storage/offloading facility for ballasting.

11. The LNG production plant of claim 9 , wherein the ballast storage compartment is at least partially filled with one or both of a solid ballasting material or a liquid ballasting material.

12. The LNG production plant of claim 11 , wherein the solid ballasting material is iron ore or sand.

13. The LNG production plant of claim 11 , wherein the liquid ballasting material is one or more of: water, condensate, monoethylene glycol (MEG), methanol, diesel, demineralised water, diesel, or, LPG.

14. The LNG production plant of claim 1 , wherein the integrated storage/offloading facility includes a boil-off gas reliquefaction facility.

15. The LNG production plant of claim 1 , wherein the integrated storage/offloading facility has at least one lateral side which has a length of a sufficient size to allow an LNG Carrier to be moored along alongside the gravity-based structure without overhang of the LNG Carrier beyond an end of the gravity-based structure.

16. The LNG production plant of claim 1 , wherein the integrated storage/offloading facility has a lee side, whereby, in use, the LNG Carrier approaches the integrated storage/offloading facility from the lee side of integrated storage/offloading facility.

17. The LNG production plant of claim 1 , wherein the integrated storage/offloading facility has a longitudinal axis aligned substantially parallel to the direction of a predominant current for bi-directional berthing of an LNG Carrier.

18. The LNG production plant of claim 1 , wherein the integrated storage/offloading facility comprises a plurality of similarly-sized sub-facilities, which are integrated at a construction location, the production location, or at an independent assembly location.

19. The LNG production plant of claim 18 , wherein the sub-facilities are constructed at a plurality of construction locations and towed to a common assembly location for integration.

20. The LNG production plant of claim 18 , wherein the sub-facilities are assembled to form the integrated storage/offloading facility at the assembly location and testing or commissioning of the sub-facilities is conducted a construction or assembly location before transportation of the integrated storage/offloading facility to the production location.

21. The LNG production plant of claim 1 , wherein the integrated storage/offloading facility is movable from a first production location to a second production location.

22. The LNG production plant of claim 1 , wherein a portion of boil off gas is a source of fuel for a first power generation system which forms part of the integrated storage/offloading facility or a second power generation facility onboard the LNG Carrier.

23. The LNG production plant of claim 1 , wherein a first portion of the LNG produced by the liquefaction facility is transferred directly into a second cryogenic storage tank onboard an LNG Carrier and a second portion of the LNG produced by the liquefaction facility is stored in the first cryogenic storage tank of the integrated storage/offloading facility.

24. The LNG production plant of claim 1 , wherein the integrated storage/offloading facility has a multilateral footprint in plan view.

25. The LNG production plant of claim 24 , wherein the footprint is triangular, rectangular, square, pentagonal or hexagonal such that, in use, a first LNG Carrier berths at a first lateral side of the integrated storage/offloading facility while a second LNG Carrier berths at a second lateral side of the integrated storage/offloading facility.

26. The LNG production plant of any claim 1 , further comprising a breakwater facility positioned adjacent to the integrated storage/offloading facility at the selected location.

27. The LNG production plant of claim 1 , wherein a first breakwater facility is located towards a first end of the integrated storage/offloading facility and a second breakwater facility is located towards a second end of the integrated storage/offloading facility.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 6, 2015
From: FAKA, SOLOMON ALADJA
To: WOODSIDE ENERGY TECHNOLOGIES PTY LTD.
Reel/Frame 035104/0781 →
Priority Claims (1)
AU 2012904129 · Sep 21, 2012 · national
Continuity (2)
Continuation PCTAU2013000258 · Mar 15, 2013
Related Publication 20150176765A1 · Jun 25, 2015
Cited By (1)
US 12,246,805