Offshore LNG processing facility

Inventors: Alapkumar R. Shah (Overland Park, KS); Shawn D. Hoffart (Miami, FL); Christopher Michael Windeler (Bowen Island, CA)
Assignee: NFE Patent Holdings LLC
B63B35/44B63B1/12B63B25/14F17C6/00B63B2035/4433B63B2035/4473B63B2035/4486F17C2221/033F17C2227/0157F17C2265/032F17C2270/0121F25J1/0022
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,246,805
App. No.
18/369,516
Granted
Mar 11, 2025
Kind
B2
Abstract

An offshore LNG processing plant includes a first module including a personnel accommodation facility on a first vessel, a second module including a gas treatment facility on a second vessel, and a third module including a gas liquefaction facility on a third vessel. Each of the first, second, and third modules are assembled on the corresponding vessels, and then transported to an offshore location in a body of water, such as a river, a lake, or a sea. At the offshore location, each vessel deploys legs to the bed of the body of water to raise a hull of each vessel out of the water. The first module is then coupled to the second module, and the second module is coupled to the third module. A fourth module on a fourth vessel is coupled to the third module to provide LNG storage.

Claims (52)

1. A process plant comprising:

a first plant module including a power generation module on a first vessel, the first vessel comprising a first mobile jack-up vessel;

a second plant module including a gas treatment facility on a second vessel, the second vessel comprising a second mobile jack-up vessel; and

a third plant module including a gas liquefaction facility on a third vessel, the third vessel comprising a third mobile jack-up vessel;

wherein:

the second vessel is configured to couple to the first vessel such that the second plant module receives electricity from the power generation facility; and

the third vessel is configured to couple to the second vessel such that the third plant module receives electricity from the power generation facility.

2. The process plant of claim 1 , wherein the first plant module further includes a first local electricity distribution station coupled to the power generation module.

3. The process plant of claim 2 , wherein:

the second plant module further includes a second local electricity distribution station coupled to the gas treatment facility; and

the second local electricity distribution station is coupled to the first local electricity distribution station such that the gas treatment facility receives electricity from the power generation facility via the first and second local electricity distribution stations.

4. The process plant of claim 3 , wherein:

the third plant module further includes a third local electricity distribution station coupled to the gas liquefaction facility; and

the third local electricity distribution station is coupled to the second local electricity distribution station, such that the gas liquefaction facility receives electricity from the power generation facility via the first, second, and third local electricity distribution stations.

5. The process plant of claim 1 , further comprising a fourth plant module including an LNG storage facility on a fourth vessel.

6. The process plant of claim 5 , wherein the fourth plant module further includes a first compressor configured to deliver a first boiloff gas from the LNG storage facility to the third plant module.

7. The process plant of claim 6 , wherein:

the third plant module is configured to combine the first boiloff gas with a second boiloff gas from the gas liquefaction facility into a combined boiloff gas stream; and

the third plant module further includes a second compressor configured to deliver the combined boiloff gas stream into a fuel gas line.

8. The process plant of claim 7 , wherein the third plant module further includes a first local power generator that receives at least a first portion of the first boiloff gas from the fuel gas line.

9. The process plant of claim 8 , wherein the second plant module further includes a second local power generator that receives at least a second portion of the first boiloff gas from the fuel gas line.

10. A process plant comprising:

a first plant module including a utilities facility on a first vessel, the first vessel comprising a first mobile jack-up vessel;

a second plant module including a gas treatment facility on a second vessel, the second vessel comprising a second mobile jack-up vessel; and

a third plant module including a gas liquefaction facility on a third vessel, the third vessel comprising a third mobile jack-up vessel;

wherein:

the second vessel is configured to couple to the first vessel such that the second plant module receives a utility from the utilities facility; and

the third vessel is configured to couple to the second vessel such that the third plant module receives the utility from the utilities facility.

11. The process plant of claim 10 , wherein the utility includes at least one of potable water, nitrogen, instrument air, seawater, hot oil, or diesel.

12. The process plant of claim 10 , further comprising a fourth plant module including an LNG storage facility on a fourth vessel.

13. The process plant of claim 12 , wherein the fourth plant module further includes a first compressor configured to deliver a first boiloff gas from the LNG storage facility to the third plant module.

14. The process plant of claim 13 , wherein:

the third plant module is configured to combine the first boiloff gas with a second boiloff gas from the gas liquefaction facility into a combined boiloff gas stream; and

the third plant module further includes a second compressor configured to deliver the combined boiloff gas stream into a fuel gas line.

15. The process plant of claim 14 , wherein the third plant module further includes a first local power generator that receives at least a first portion of the first boiloff gas from the fuel gas line.

16. The process plant of claim 15 , wherein the second plant module further includes a second local power generator that receives at least a second portion of the first boiloff gas from the fuel gas line.

17. A process plant comprising:

a first plant module including a control room on a first vessel, the first vessel comprising a first mobile jack-up vessel;

a second plant module including a gas treatment facility on a second vessel, the second vessel comprising a second mobile jack-up vessel; and

a third plant module including a gas liquefaction facility on a third vessel, the third vessel comprising a third mobile jack-up vessel;

wherein:

the second vessel is configured to couple to the first vessel such that the control room facilitates control of the second plant module; and

the third vessel is configured to couple to the second vessel such that the control room facilitates control of the third plant module.

18. The process plant of claim 17 , wherein the first plant module further includes a personnel accommodation facility.

19. The process plant of claim 17 , wherein:

the first plant module further includes a power generation facility;

the second vessel is configured to couple to the first vessel such that the second plant module receives electricity from the power generation facility; and

the third vessel is configured to couple to the second vessel such that the third plant module receives electricity from the power generation facility.

20. The process plant of claim 17 , wherein:

the first plant module further includes a utilities facility;

the second vessel is configured to couple to the first vessel such that the second plant module receives a utility from the utilities facility; and

the third vessel is configured to couple to the second vessel such that the third plant module receives the utility from the utilities facility.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 18, 2023
From: SHAH, ALAPKUMAR R.; HOFFART, SHAWN D.
To: NFE PATENT HOLDINGS LLC
Reel/Frame 064939/0184 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 18, 2023
From: WINDELER, CHRISTOPHER MICHAEL
To: WINDELER DESIGN CONSULTANTS LTD
Reel/Frame 064939/0432 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 18, 2023
From: WINDELER DESIGN CONSULTANTS LTD
To: NFE PATENT HOLDINGS LLC
Reel/Frame 064939/0524 →
Continuity (3)
Continuation 18094322 · Jan 6, 2023
Provisional Application 63297496 · Jan 7, 2022
Related Publication 20240002023A1 · Jan 4, 2024
References Cited (31)
US 3766583A · Phelps · 1973 [cited by applicant]
US 4202648A · Kvamsdal · 1980 [cited by applicant]
US 6085528A · Woodall et al. · 2000 [cited by applicant]
US 6298671B1 · Kennelley et al. · 2001 [cited by applicant]
US 6546739B2 · Frimm et al. · 2003 [cited by applicant]
US 6658891B2 · Reijnen et al. · 2003 [cited by applicant]
US 7360367B2 · Hubbard et al. · 2008 [cited by applicant]
US 7461520B2 · Iijima et al. · 2008 [cited by applicant]
US 8037694B2 · Runbalk · 2011 [cited by applicant]
US 8640493B1 · Shivers, III · 2014 [cited by examiner]
US 8683823B1 · Shivers, III · 2014 [cited by examiner]
US 9545980B2 · Morimoto · 2017 [cited by applicant]
US 9574822B2 · Haberberger et al. · 2017 [cited by applicant]
US 10197220B2 · Faka · 2019 [cited by examiner]
US 10240862B2 · Faka · 2019 [cited by examiner]
US 10539361B2 · Byfield · 2020 [cited by examiner]
US 11402152B2 · Christensen · 2022 [cited by examiner]
US 20090208294A1 · Yao · 2009 [cited by examiner]
US 20120230772A1 · Foo · 2012 [cited by examiner]
US 20150321732A1 · Major · 2015 [cited by examiner]
US 20160231050A1 · Faka · 2016 [cited by examiner]
US 20180224204A1 · Faka · 2018 [cited by examiner]
AU 2012207058A1 · 2012 [cited by applicant]
AU 2012207059B2 · 2013 [cited by applicant]
AU 2016259407B2 · 2018 [cited by applicant]
RU 2699160C1 · 2019 [cited by applicant]
WO 2006052896A1 · 2006 [cited by applicant]
WO 2007064209A1 · 2007 [cited by applicant]
WO 2010136444A1 · 2010 [cited by applicant]
YouTube Video “Fast LNG” by New Fortress Energy, uploaded May 27, 2021; https://www.youtube.com/watch?v=ta4Py2WH4kc. [cited by applicant]
International Search Report and Written Opinion in related application PCT/US2023/010299 dated Apr. 5, 2023. [cited by applicant]