IP Library › Granted Patent US 11,158,434
Granted Patent B2
US 11,158,434 · App. 16/718,654 · Granted Oct 26, 2021

Radioactive waste repository systems and methods

Inventors: Joe H. Payer (Brecksville, OH); Stefan Finsterle (Kensington, CA); John Apps (Lafayette, CA); Richard A. Muller (Berkeley, CA)
Assignee: Deep Isolation, Inc.
G21F9/36B09B1/008E21B41/005G21F5/015G21F5/06
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,158,434
App. No.
16/718,654
Granted
Oct 26, 2021
Kind
B2
Abstract

A hazardous material repository includes a drillhole formed from a terranean surface into a subterranean zone that includes a geologic formation, where the drillhole includes a vertical portion and a non-vertical portion coupled to the vertical portion by a transition portion, the non-vertical portion includes a storage volume for hazardous waste; a casing installed between the geologic formation and the drillhole, the casing including one or more metallic tubular sections; at least one canister positioned in the storage volume of the non-vertical portion of the drillhole, the at least one canister sized to enclose a portion of hazardous material and including an outer housing formed from a non-corrosive metallic material; and a backfill material inserted into the non-vertical portion of the drillhole to fill at least a portion of the storage volume between the at least one canister and the casing.

Claims (39)

1. A hazardous material repository, comprising:

a drillhole formed from a terranean surface into a subterranean zone that comprises a geologic formation, the drillhole comprising a vertical portion and a non-vertical portion coupled to the vertical portion by a transition portion, the non-vertical portion comprising a storage volume for hazardous waste;

a casing installed between the geologic formation and the drillhole, the casing comprising one or more metallic tubular sections formed of API-5CT L80 steel;

at least one canister positioned in the storage volume of the non-vertical portion of the drillhole, the at least one canister sized to enclose a portion of hazardous material and comprising an outer housing formed from a nickel-chromium-molybdenum alloy;

an engineered filling inserted into the drillhole to fill at least a portion of the storage volume between the at least one canister and the casing, the engineered filling comprising a deaerated bentonite-based slurry; and

a backfill material inserted into the at least one canister to fill a void between the portion of hazardous material and the canister, the backfill material comprising a quartz material.

2. The hazardous material repository of claim 1 , wherein the hazardous material comprises radioactive material waste.

3. The hazardous material repository of claim 2 , wherein the radioactive material waste comprises one or more portions of a spent nuclear fuel assembly.

4. The hazardous material repository of claim 2 , wherein the geologic formation is at a depth in which a hydrostatic pressure at the depth is great enough to prevent boiling of water at a boiling point of about 310° C., or the geologic formation comprises pore water that is highly reducing, or the geologic formation comprises a rock in which pore waters are anoxic, or the geologic formation comprises a fully saturated rock formation.

5. The hazardous material repository of claim 1 , wherein the nickel-chromium-molybdenum alloy comprises Alloy 625.

6. The hazardous material repository of claim 1 , wherein a wall thickness of the at least one canister is between 9.25 mm and 10 mm.

7. The hazardous material repository of claim 6 , wherein a wall thickness of the casing is 12.5 mm.

8. The hazardous material repository of claim 1 , wherein a wall thickness of the casing is 12.5 mm.

9. The hazardous material repository of claim 1 , wherein the bentonite-based slurry is pumped from the terranean surface into the non-vertical portion of the drillhole to fill the portion of the storage volume between the at least one canister and the casing.

10. The hazardous material repository of claim 1 , wherein the geologic formation is at a depth in which a hydrostatic pressure at the depth is great enough to prevent boiling of water at a boiling point of about 310° C., or the geologic formation comprises pore water that is highly reducing, or the geologic formation comprises a rock in which pore waters are anoxic, or the geologic formation comprises a fully saturated rock formation.

11. The hazardous material repository of claim 1 , wherein a thermal load of the hazardous material repository is controlled by spacing of the at least one canister within the storage volume.

12. The hazardous material repository of claim 1 , wherein the nickel-chromium-molybdenum alloy is configured to self-form a passive protective film on an exterior surface of the outer housing of the at least one canister.

13. The hazardous material repository of claim 1 , further comprising one or more expansion absorbers placed at predetermined locations in the casing.

14. The hazardous material repository of claim 1 , wherein the deaerated bentonite-based slurry is pumped from the terranean surface into the non-vertical portion of the drillhole to fill the portion of the storage volume between the at least one canister and the casing to a level that extends uphole to at or near a drillhole seal that is positioned to isolate an entry of the drillhole at a terranean surface from the storage volume.

15. The hazardous material repository of claim 1 , wherein the deaerated bentonite-based slurry comprises an insulator and a radioactive energy absorber between the at least one canister and the casing.

16. A method for forming an engineered barrier system for a hazardous material repository, comprising:

forming a drillhole from a terranean surface into a subterranean zone that comprises a geologic formation, the drillhole comprising a vertical portion and a non-vertical portion coupled to the vertical portion by a transition portion, the non-vertical portion comprises a storage volume for hazardous waste;

installing a casing between the geologic formation and the drillhole, the casing comprising one or more metallic tubular sections formed of API-5CT L80 steel;

positioning at least one canister in the storage volume of the non-vertical portion of the drillhole, the at least one canister enclosing a portion of hazardous material and comprising an outer housing formed from a nickel-chromium-molybdenum alloy, the outer housing defining a volume that encloses the portion of the hazardous material and a backfill material that comprises a quartz material; and

inserting an engineered filling into the drillhole to fill at least a portion of the storage volume between the at least one canister and the casing, the engineered filling comprising a deaerated bentonite-based slurry.

17. The method of claim 16 , wherein the hazardous material comprises radioactive material waste.

18. The method of claim 17 , wherein the radioactive material waste comprises one or more portions of a spent nuclear fuel assembly.

19. The method of claim 16 , wherein the nickel-chromium-molybdenum alloy comprises Alloy 625.

20. The method of claim 16 , wherein a wall thickness of the at least one canister is between 9.25 mm and 10 mm.

21. The method of claim 20 , wherein a wall thickness of the casing is 12.5 mm.

22. The method of claim 16 , wherein a wall thickness of the casing is 12.5 mm.

23. The method of claim 16 , wherein inserting the engineered filling into the drillhole comprises pumping the bentonite-based slurry from the terranean surface into the non-vertical portion of the drillhole to fill the portion of the storage volume between the at least one canister and the casing.

24. The method of claim 16 , wherein the geologic formation is at a depth in which a hydrostatic pressure at the depth is great enough to prevent boiling of water at a boiling point of about 310° C., or the geologic formation comprises pore water that is highly reducing, or the geologic formation comprises a rock in which pore waters are anoxic, or the geologic formation comprises a fully saturated rock formation.

25. The method of claim 16 , wherein positioning the at least one canister in the storage volume of the non-vertical portion of the drillhole comprises:

positioning a first canister in the storage volume of the non-vertical portion of the drillhole; and

positioning a second canister in the storage volume of the non-vertical portion of the drillhole apart from the first canister a specified distance based on a thermal load of the hazardous material repository.

26. The method of claim 16 , further comprising, subsequent to the inserting the engineered filling into the drillhole, sealing the vertical portion of the drillhole from the terranean surface.

27. The method of claim 16 , further comprising inserting one or more expansion absorbers at predetermined locations in the casing.

28. The method of claim 16 , further comprising forming a passive protective film on an exterior surface of the outer housing by the nickel-chromium-molybdenum alloy.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 28, 2020
From: PAYER, JOE H.; FINSTERLE, STEFAN; APPS, JOHN; MULLER, RICHARD A.
To: DEEP ISOLATION, INC.
Reel/Frame 052779/0565 →
Continuity (4)
Provisional Application 62781337 · Dec 18, 2018
Provisional Application 62784991 · Dec 26, 2018
Provisional Application 62840216 · Apr 29, 2019
Related Publication 20200194140A1 · Jun 18, 2020
Cited By (4)
US 12,469,612 US 12,595,718 US 12,614,643 US 12,665,100