IP Library › Granted Patent US 11,274,658
Granted Patent B2
US 11,274,658 · App. 16/986,509 · Granted Mar 15, 2022

Wind turbine tower section

Inventor: Holger Lühn (Salzbergen, DE)
Assignee: General Electric Company
F03D13/20E04H12/085F05B2240/912
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,274,658
App. No.
16/986,509
Granted
Mar 15, 2022
Kind
B2
Abstract

A tower section 12 of a wind turbine is provided, the tower section 12 including an upper segment 100 that includes a lower flange 110 ; a lower segment 200 that includes an upper flange 210 ; a plurality of first bolt connections that include first bolts 310 and first nuts 320 ; a plurality of second bolt connections that include second bolts 410 and second nuts 420 ; wherein the first bolt connections and the second bolt connections connect the lower flange 110 to the upper flange 210 ; and wherein the first bolt 310 and the second bolts 410 have different axial positions with respect to the longitudinal axis of the tower section 12.

Claims (27)

1. A tower section of a wind turbine, the tower section comprising:

an upper segment comprising a lower flange;

a lower segment comprising an upper flange;

a plurality of first bolt connections comprising first bolts and first nuts; and

a plurality of second bolt connections comprising second bolts and second nuts;

wherein the first bolt connections and the second bolt connections connect the lower flange to the upper flange; and,

wherein the first bolts and the second bolts have different axial positions with respect to the longitudinal axis of the tower section,

wherein the first bolts are substantially parallel to the second bolts, and

wherein a separation distance separating one of the plurality of first bolt connections and one of the plurality of second bolt connections is less than a distance required for a tool to tighten the at least one of the plurality of first bolt connections and second bolt connections in a single plane.

2. The tower section of claim 1 , wherein the upper flange and the lower flange each comprise a plurality of bolt-holes for the plurality of first bolt connections and the plurality of second bolt connections.

3. The tower section of claim 1 , wherein the upper flange and the lower flange are made of metal.

4. The tower section of claim 1 , wherein each of the plurality of first bolt connections and the plurality of second bolt connections comprises at least 30% of all bolt connections connecting the lower flange to the upper flange, respectively.

5. The tower section of claim 1 , wherein the first bolt connections are mounted in a first direction and the second bolt connections are mounted in a second direction, wherein the first direction is different from the second direction.

6. The tower section of claim 1 , wherein the plurality of first bolt connections comprises first spacers and the plurality of second bolt connections comprises second spacers, and wherein the first spacers have axial lengths at least equal to a thickness of a head portion of one of the second bolts, and the second spacers have axial lengths at least equal to a thickness of a head portion of one of the first bolts.

7. The tower section of claim 1 , wherein the upper segment is a part of a yaw gearing, and/or wherein the lower segment is a part of a foundation segment.

8. A method for connecting a lower segment to an upper segment of a tower section of a wind turbine, wherein the upper segment comprises a lower flange and the lower segment comprises an upper flange, the method comprising:

mounting a plurality of first bolts and a plurality of first nuts to build a plurality of first bolt connections connecting the lower flange to the upper flange; and,

mounting a plurality of second bolts and a plurality of second nuts to build a plurality of second bolt connections connecting the lower flange to the upper flange;

wherein the first bolts and the second bolts have different axial positions with respect to the longitudinal axis of the tower section,

wherein the first bolts are substantially parallel to the second bolts, and

wherein a separation distance separating one of the plurality of first bolt connections and one of the plurality of second bolt connections is less than a distance required for a tool to tighten the at least one of the plurality of first bolt connections and second bolt connections in a single plane.

9. The tower section of claim 8 , further comprising:

tightening the plurality of first bolt connections from a side above the lower flange; and

tightening the plurality of the second bolt connections from a side below the upper flange.

10. The tower section of claim 8 , wherein:

mounting the plurality of first bolts and the plurality of first nuts comprises mounting a plurality of first spacers on the plurality of first bolts from a side above the lower flange; and,

mounting the plurality of second bolts and the plurality of second nuts comprises mounting a plurality of second spacers on the plurality of second bolts from a side below the upper flange.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 17, 2023
From: GENERAL ELECTRIC COMPANY
To: GE INFRASTRUCTURE TECHNOLOGY LLC
Reel/Frame 065727/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 1, 2022
From: GE WIND ENERGY GMBH
To: GENERAL ELECTRIC COMPANY
Reel/Frame 058845/0793 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 6, 2020
From: LUHN, HOLGER
To: GE WIND ENERGY GMBH
Reel/Frame 053418/0438 →
Priority Claims (1)
EP 19191267 · Aug 12, 2019 · regional
Continuity (1)
Related Publication 20210048001A1 · Feb 18, 2021
Cited By (1)
US 12,655,649