IP Library › Granted Patent US 12,111,303
Granted Patent B2
US 12,111,303 · App. 17/850,866 · Granted Oct 8, 2024

System and method for determining a location of ore in a stockpile

Inventors: Cory A. Demieville (Scottsdale, AZ); Dana Geislinger (Chandler, AZ); Travis Gaddie (Phoenix, AZ); Margaret Alden Tinsley (Titusville, FL); Muneeb Alam (Alexandria, VA); Steven Chad Richardson (Thatcher, AZ); Akaash Sanyal (Boston, MA); Raquel Crossman (Mesa, AZ); Tianfang Ni (Boston, MA); Luke Gerdes (Framingham, MA); Robyn Freeman (Menlo Park, CA); Oleksandr Klesov (Lexington, MA); Luciano Kiniti Issoe (Sao Paulo, BR)
Assignee: FREEPORT MINERALS CORPORATION
G01N33/24G01N15/0227
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,111,303
App. No.
17/850,866
Granted
Oct 8, 2024
Kind
B2
Abstract

The method may comprise receiving historical data (e.g., mineralogy data, irrigation data, raffinate data, heat data, lift height data, geographic data on ore placement and/or blower data); training a predictive model using the historical data to create a trained predictive model; adding future assumption data to the trained predictive model; running the forecast engine for a plurality of parameters to obtain forecast data for a mining production target; comparing the forecast data for the mining production target to the actual data for the mining production target; determining deviations between the forecast data and the actual data, based on the comparing; and changing each of the plurality of parameters from the forecast data to the actual data to determine a contribution to the deviations for each of the plurality of parameters.

Claims (53)

1. A method of mine material tracking comprising:

receiving, by one or more processors, data, wherein the data comprises terrain data, haul truck sensor data, block model data and dispatch data and at least one of load point data, shovel high-precision global positioning system (HPGPS) data for a shovel, provision data or mine system data;

receiving, by the one or more processors, chemical data and mineralogical data of ore at a plurality of blast holes;

interpolating, by the one or more processors, the plurality of blast holes in the block model data;

assigning, by the one or more processors, the plurality of blast holes to a geographic location post-blast;

merging, by the one or more processors, the geographic location post-blast, the dispatch data, the terrain data and the haul truck sensor data with the block model data;

linking, by the one or more processors, the block model data to a truck load based on the merging;

aggregating, by the one or more processors, ore characteristics for the truck load;

capturing, by the one or more processors, images of ore that is placed in the truck load to determine particle size distribution information about the ore;

determining, by the one or more processors, a location of the ore in a stockpile; and

transmitting, by the one or more processors, to the shovel an instruction signal about the location of the ore in the stockpile having optimal of the ore characteristics to obtain metals from the ore,

wherein the shovel obtains at least a portion of the ore from the location of the ore in the stockpile, in response to the instruction signal.

2. The method of claim 1 , further comprising adjusting, by the one or more processors, at least a portion of leaching operations to continue mining production and to optimize the mining production, based on the location of the ore in the stockpile.

3. The method of claim 1 , wherein the data comprises the load point data that includes at least one of HPGPS load points or dig point data.

4. The method of claim 1 , wherein the data comprises the mine system data that includes at least one of mine planning data or the block model data.

5. The method of claim 1 , wherein the dispatch data includes at least one of haulage cycle data or beacon data.

6. The method of claim 1 , wherein the haul truck sensor data provides information about the haul trucks.

7. The method of claim 1 , further comprising transmitting, by the one or more processors, the location of the ore in the stockpile to a stockpile and section mapping tool.

8. The method of claim 7 , wherein the stockpile and section mapping tool provides data to an ore map.

9. The method of claim 8 , wherein the ore map provides data to a forecast model input table.

10. The method of claim 7 , wherein the stockpile and section mapping tool provides data to a predictive model.

11. An article of manufacture including one or more non-transitory, tangible computer readable storage mediums having instructions stored thereon that, in response to execution by one or more processors, cause the one or more processors processor to perform operations comprising:

receiving, by the one or more processors, data, wherein the data comprises terrain data, haul truck sensor data, block model data and dispatch data and at least one of load point data, shovel high-precision global positioning system (HPGPS) data for a shovel, provision data or mine system data;

receiving, by the one or more processors, chemical data and mineralogical data of ore at a plurality of blast holes;

interpolating, by the one or more processors, the plurality of blast holes in the block model data;

assigning, by the one or more processors, the plurality of blast holes to a geographic location post-blast;

merging, by the one or more processors, the geographic location post-blast, the dispatch data, the terrain data and the haul truck sensor data with the block model data; linking, by the one or more processors, the block model data to a truck load based on the merging;

aggregating, by the one or more processors, ore characteristics for the truck load; capturing, by the one or more processors, images of ore that is placed in the truck load to determine particle size distribution information about the ore;

determining, by the one or more processors, a location of the ore in a stockpile; and

transmitting, by the one or more processors, to the shovel an instruction signal about the location of the ore in the stockpile having optimal of the ore characteristics to obtain metals from the ore,

wherein the shovel obtains at least a portion of the ore from the location of the ore in the stockpile, in response to the instruction signal.

12. A system comprising:

one or more processors; and

one or more tangible, non-transitory memories configured to communicate with the one or more processors,

the one or more tangible, non-transitory memories having instructions stored thereon that, in response to execution by the one or more processors, cause the one or more processors to perform operations comprising:

receiving, by the one or more processors, data, wherein the data comprises terrain data, haul truck sensor data, block model data and dispatch data and at least one of load point data, shovel high-precision global positioning system (HPGPS) data for a shovel, provision data or mine system data;

receiving, by the one or more processors, chemical data and mineralogical data of ore at a plurality of blast holes;

interpolating, by the one or more processors, the plurality of blast holes in the block model data;

assigning, by the one or more processors, the plurality of blast holes to a geographic location post-blast;

merging, by the one or more processors, the geographic location post-blast, the dispatch data, the terrain data and the haul truck sensor data with the block model data;

linking, by the one or more processors, the block model data to a truck load based on the merging;

aggregating, by the one or more processors, ore characteristics for the truck load;

capturing, by the one or more processors, images of ore that is placed in the truck load to determine particle size distribution information about the ore;

determining, by the one or more processors, a location of the ore in a stockpile; and transmitting, by the one or more processors, to the shovel an instruction signal about the location of the ore in the stockpile having optimal of the ore characteristics to obtain metals from the ore,

wherein the shovel obtains at least a portion of the ore from the location of the ore in the stockpile, in response to the instruction signal.

13. The system of claim 12 , wherein the data comprises the load point data that includes HPGPS load points.

14. The system of claim 12 , wherein the data comprises the load point data that includes dig point data.

15. The system of claim 12 , wherein the data comprises the mine system data that includes at least one of mine planning data or the block model data.

16. The system of claim 12 , wherein the dispatch data includes at least one of haulage cycle data or beacon data.

17. The system of claim 12 , wherein the haul truck sensor data provides information about the haul trucks.

18. The system of claim 12 , further comprising transmitting, by the one or more processors, the location of the ore in the stockpile to a stockpile and section mapping tool.

19. The system of claim 18 , wherein the stockpile and section mapping tool provides data to an ore map.

20. The system of claim 19 , wherein the ore map provides data to a forecast model input table.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 13, 2022
From: DEMIEVILLE, CORY A.; GEISLINGER, DANA; GADDIE, TRAVIS; TINSLEY, MARGARET ALDEN; ALAM, MUNEEB; RICHARDSON, STEVEN CHAD; SANYAL, AKAASH; CROSSMAN, RAQUEL; NI, TIANFANG; GERDES, LUKE; FREEMAN, ROBYN; KLESOV, OLEKSANDR; ISSOE, LUCIANO KINITI
To: FREEPORT MINERALS CORPORATION
Reel/Frame 063648/0698 →
Continuity (1)
Related Publication 20230417724A1 · Dec 28, 2023
Cited By (5)
US 12,288,170 US 12,400,155 US 12,518,223 US 12,619,924 US 12,731,087