IP Library › Granted Patent US 12,193,091
Granted Patent B2
US 12,193,091 · App. 17/629,845 · Granted Jan 7, 2025

Radio access network node, user equipment, and methods thereof

Inventors: Hisashi Futaki (Tokyo, JP); Sadafuku Hayashi (Tokyo, JP)
Assignee: NEC CORPORATION
H04W76/15H04W72/27H04W76/34H04W88/085
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,193,091
App. No.
17/629,845
Granted
Jan 7, 2025
Kind
B2
Abstract

A master node ( 1 ) requests a conditional PSCell addition (CPA), via an SN ADDITION REQUEST message ( 301 ), to a candidate secondary node ( 2 ). The master node ( 1 ) also requests the candidate secondary node ( 2 ) to configure an SN terminated MCG bearer via the SN ADDITION REQUEST message ( 301 ). This can, for example, contribute to mitigating a communication continuity problem caused by a Conditional PSCell Addition (CPA) failure.

Claims (36)

1. A first Radio Access Network (RAN) node configured to operate as a master node associated with a Master Cell Group (MCG) in dual connectivity for a User Equipment (UE), the first RAN node comprising:

at least one memory; and

at least one processor coupled to the at least one memory and configured to:

request a conditional Primary Secondary Cell (PSCell) addition, via an SN ADDITION REQUEST message, to a candidate secondary node; and

request the candidate secondary node, via the SN ADDITION REQUEST message, to configure an SN terminated MCG bearer, the SN terminated MCG bearer being a radio bearer terminated at the candidate secondary node and using radio resources of the MCG but not using radio resources of a Secondary Cell Group (SCG) associated with the candidate secondary node,

wherein the conditional PSCell addition requested by the SN ADDITION REQUEST message involves a bearer type change of the SN terminated MCG bearer to an SN terminated split bearer or an SN terminated SCG bearer.

2. The first RAN node according to claim 1 , wherein the at least one processor is configured to:

receive an SN ADDITION REQUEST ACKNOWLEDGE message from the candidate secondary node after sending the SN ADDITION REQUEST message, wherein the SN ADDITION REQUEST ACKNOWLEDGE message contains a radio bearer configuration regarding the SN terminated MCG bearer and an SCG configuration of the SCG including a candidate PSCell for the conditional PSCell addition; and

transmit an MN Radio Resource Control (RRC) Reconfiguration message to the UE in response to receiving the SN ADDITION REQUEST ACKNOWLEDGE message, wherein the MN RRC Reconfiguration message contains an execution condition for the conditional PSCell addition, the radio bearer configuration, and the SCG configuration.

3. The first RAN node according to claim 2 , wherein the at least one processor is configured to:

receive an MN RRC Reconfiguration Complete message from the UE after transmitting the MN RRC Reconfiguration message; and

send an SN RECONFIGURATION COMPLETE message to the candidate secondary node in response to receiving the MN RRC Reconfiguration Complete message, to implicitly inform that the UE has successfully established the SN terminated MCG bearer.

4. The first RAN node according to claim 3 , wherein the at least one processor is configured to:

after receiving the MN RRC Reconfiguration Complete message, receive a UL Information Transfer MRDC message that is transmitted from the UE in response satisfaction of the execution condition, the UL Information Transfer MRDC message containing an SN RRC response message; and

forward the SN RRC response message to the candidate secondary node.

5. The first RAN node claim 1 , wherein the SN ADDITION REQUEST message indicates that the SN terminated MCG bearer is to be changed to the SN terminated split bearer or the SN terminated SCG bearer upon execution of the conditional PSCell addition.

6. The first RAN node according to claim 1 , wherein the at least one processor is configured to transmit an MN Radio Resource Control (RRC) Reconfiguration message to the UE,

wherein the MN RRC Reconfiguration message includes an execution condition for the conditional Primary Secondary Cell (PSCell) addition, a radio bearer configuration of the SN terminated MCG bearer, an SCG configuration of the SCG including a candidate PSCell for the conditional PSCell addition, and a radio bearer configuration of an SN terminated bearer to be added when the execution condition is satisfied.

7. The first RAN node according to claim 1 , wherein the at least one processor is configured to maintain the SN terminated MCG bearer when a failure of the conditional PSCell addition occurs.

8. The first RAN node according to claim 7 , wherein the at least one processor is configured to change the SN terminated split bearer or the SN terminated SCG bearer back to the SN terminated MCG bearer when the failure of the conditional PSCell addition occurs.

9. A User Equipment (UE) comprising:

at least one memory; and

at least one processor coupled to the at least one memory and configured to:

receive an MN Radio Resource Control (RRC) Reconfiguration message from a serving Radio Access Network (RAN) node, wherein the MN RRC Reconfiguration message contains an execution condition for a conditional Primary Secondary Cell (PSCell) addition, a radio bearer configuration of an SN terminated MCG bearer, and a Secondary Cell Group (SCG) configuration of an SCG including a candidate PSCell for the conditional PSCell addition; and

establish the SN terminated MCG bearer and start evaluating the execution condition in response to receiving the MN RRC Reconfiguration message.

10. The UE according to claim 9 , wherein the at least one processor is configured to transmit an MN RRC Reconfiguration Complete message to the serving RAN node in response to establishment of the SN terminated MCG bearer.

11. The UE according to claim 10 , wherein the at least one processor is configured to, in response to satisfaction of the execution condition after transmitting the MN RRC Reconfiguration Complete message, transmit a UL Information Transfer MRDC message containing an SN RRC response message to the serving RAN node and start random access to the candidate PSCell.

12. The UE according to claim 9 , wherein the MN RRC Reconfiguration message indicates that the SN terminated MCG bearer is to be changed to an SN terminated split bearer or an SN terminated SCG bearer upon execution of the conditional PSCell addition.

13. The UE according to claim 12 , wherein the at least one processor is configured to maintain the SN terminated MCG bearer when a failure of the conditional PSCell addition occurs.

14. The UE according to claim 13 , wherein the at least one processor is configured to change the SN terminated split bearer or the SN terminated SCG bearer back to the SN terminated MCG bearer when the failure of the conditional PSCell addition occurs.

15. The UE according to claim 9 , wherein the conditional PSCell addition involves a bearer type change of the SN terminated MCG bearer to an SN terminated split bearer or an SN terminated SCG bearer.

16. A method performed by a first Radio Access Network (RAN) node configured to operate as a master node associated with a Master Cell Group (MCG) in dual connectivity for a User Equipment (UE), the method comprising:

requesting a conditional Primary Secondary Cell (PSCell) addition, via an SN ADDITION REQUEST message, to a candidate secondary node; and

requesting the candidate secondary node, via the SN ADDITION REQUEST message, to configure an SN terminated MCG bearer, the SN terminated MCG bearer being a radio bearer terminated at the candidate secondary node and using radio resources of the MCG but not using radio resources of a Secondary Cell Group (SCG) associated with the candidate secondary node,

wherein the conditional PSCell addition requested by the SN ADDITION REQUEST message involves a bearer type change of the SN terminated MCG bearer to an SN terminated split bearer or an SN terminated SCG bearer.

17. The method according to claim 16 , wherein the SN ADDITION REQUEST message indicates that the SN terminated MCG bearer is to be changed to the SN terminated split bearer or the SN terminated SCG bearer upon execution of the conditional PSCell addition.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 25, 2022
From: FUTAKI, HISASHI; HAYASHI, SADAFUKU
To: NEC CORPORATION
Reel/Frame 058755/0614 →
Priority Claims (1)
JP 2020-133305 · Aug 5, 2020 · national
Continuity (1)
Related Publication 20230363026A1 · Nov 9, 2023
References Cited (23)
US 20190166646A1 · Shih · 2019 [cited by examiner]
US 20200053815A1 · Teyeb · 2020 [cited by examiner]
US 20200169906A1 · Tsuboi et al. · 2020 [cited by applicant]
US 20200260325A1 · Futaki et al. · 2020 [cited by applicant]
US 20200336364A1 · Takahashi et al. · 2020 [cited by applicant]
US 20210352543A1 · Purkayastha · 2021 [cited by examiner]
US 20220295571A1 · Da Silva · 2022 [cited by examiner]
US 20220361060A1 · Wallentin · 2022 [cited by examiner]
US 20220386191A1 · Wu · 2022 [cited by examiner]
US 20220386195A1 · Ishii · 2022 [cited by examiner]
US 20220408325A1 · Da Silva · 2022 [cited by examiner]
US 20230071268A1 · Xu · 2023 [cited by examiner]
US 20230097891A1 · Zhang · 2023 [cited by examiner]
US 20240049071A1 · Hesse · 2024 [cited by examiner]
WO 2019030981A1 · 2019 [cited by applicant]
WO 2019031216A1 · 2019 [cited by applicant]
WO 2019097610A · 2019 [cited by applicant]
Extended European Search Report for EP Application No. 21844606.0 dated on Oct. 14, 2022. [cited by applicant]
LG Electronics Inc: “Transaction ID Issue in CPC”, 3GPP Draft; R2-2001536, Feb. 14, 2020, pp. 1-3. [cited by applicant]
International Search Report for PCT Application No. PCT/JP2021/019544, mailed on Jul. 27, 2021. [cited by applicant]
R2-1915985, CATT, “Draft stage-2 CR for Conditional PSCell Addition/Change”, 3GPP TSG-RAN2 Meeting #108, Reno, USA, Nov. 18-22, 2019, pp. 1-30. [cited by applicant]
R3-196728, CATT, “TP for TS36423 BLCR Conditional SN Addition&Change Procedure”,3GPP TSG-RAN WG3 Meeting #106, Reno, USA, Nov. 18-22, 2019, pp. 1-76. [cited by applicant]
R3-196975, NTT Docomo, Inc., “(TP for NR_Mob_enh-Core BL CR for TS 36.423) Conditional PScell addition”, 3GPP TSG-RAN WG3 Meeting #106, Reno, USA, Nov. 18-22, 2019, pp. 1-36. [cited by applicant]