IP Library › Granted Patent US 12,264,829
Granted Patent B2
US 12,264,829 · App. 18/303,141 · Granted Apr 1, 2025

Systems and methods for air temperature control including R-32 sensors

Inventors: Douglas Notaro (Cypress, TX); Masahiro Honda (Cypress, TX); Mark Kendall (Tomball, TX); Hiroshi Yoh (Cypress, TX); Yenny Natali Martinez (Houston, TX); Patrick Wang (Katy, TX); Roberto Flores (Cypress, TX); Timmy Ta (Cypress, TX)
Assignee: Goodman Manufacturing Company LP
F24F11/36F24F11/77F24F11/88F24F2110/65
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,264,829
App. No.
18/303,141
Granted
Apr 1, 2025
Kind
B2
Abstract

The present invention provides a system for detecting an amount of R-32 refrigerant in an air temperature controller using an R-32 refrigerant, and a method of installing a configuration of R-32 sensors in the air temperature controller using an R-32 refrigerant. The system includes an R-32 control board, a first R-32 sensor, and a second R-32 sensor. The first R-32 sensor and the second R-32 sensor are coupled in series and electrically coupled to the R-32 control board. Each of the first R-32 sensor and the second R-32 sensor include sensing components configured to detect the amount of R-32 refrigerant.

Claims (79)

1. A system for detecting an amount of R-32 refrigerant in an air temperature controller using an R-32 refrigerant, the system comprising:

an R-32 control board;

a first R-32 sensor electrically coupled to the R-32 control board; and

a second R-32 sensor electrically coupled to the first R-32 sensor;

wherein each of the first R-32 sensor and the second R-32 sensor comprises:

a sensing component configured to detect the amount of R-32 refrigerant;

a bus connector input;

a bus connector output;

a sensor relay electrically disposed between the bus connector input and the bus connector output; and

a sensor feedback port electrically disposed between the sensor relay and the bus connector output;

wherein the first R-32 sensor and the second R-32 sensor are coupled in series to the R-32 control board.

2. The system of claim 1 , wherein:

the first R-32 sensor is configured to close the sensor relay of the first R-32 sensor if the first R-32 sensor passes an internal self-diagnostic test; and

the second R-32 sensor is configured to close the sensor relay of the second R-32 sensor if the second R-32 sensor passes an internal self-diagnostic test.

3. The system of claim 2 , wherein:

the R-32 control board comprises a first sensor connector and a second sensor connector;

the bus connector input of the first R-32 sensor is electrically and communicatively coupled to the first sensor connector of the R-32 control board;

the bus connector output of the first R-32 sensor is electrically and communicatively coupled to the bus connector input of the second R-32 sensor; and

the sensor feedback port of the second R-32 sensor is electrically coupled to the second sensor connector of the R-32 control board.

4. The system of claim 2 , wherein the second R-32 sensor does not receive power to turn on until the first R-32 sensor passes the internal self-diagnostic test and the sensor relay of the first R-32 sensor is closed.

5. The system of claim 4 , wherein:

the R-32 control board is configured to turn on the air temperature controller when it receives a feedback signal from the sensor feedback port of the second R-32 sensor; and

the sensor feedback port of the second R-32 sensor does not receive power to send the feedback signal until the second R-32 sensor passes the internal self-diagnostic test and the sensor relay of the second R-32 sensor is closed.

6. The system of claim 1 , wherein:

a first default status of the sensor relay of the first R-32 sensor is open; and

a second default status of the sensor relay of the second R-32 sensor is open.

7. A method for conditioning air in a building, comprising:

running a first internal self-diagnostic test on a first R-32 sensor;

running a second internal self-diagnostic test on a second R-32 sensor, wherein:

the first R-32 sensor and the second R-32 sensor are electrically coupled in series to an R-32 control board; and

each of the first R-32 sensor and the second R-32 sensor comprises:

a sensing component configured to detect an amount of an R-32 refrigerant;

a bus connector input;

a bus connector output;

a sensor relay electrically disposed between the bus connector input and the bus connector output; and

a sensor feedback port electrically disposed between the sensor relay and the bus connector output; and

turning on an air temperature controller using the R-32 control board when the first R-32 sensor passes the first internal self-diagnostic test, and the second R-32 sensor passes the second internal self-diagnostic test.

8. The method of claim 7 , wherein the R-32 control board includes a first sensor connector and a second sensor connector;

the bus connector input of the first R-32 sensor is electrically and communicatively coupled to the first sensor connector of the R-32 control board;

the bus connector output of the first R-32 sensor is electrically and communicatively coupled to the bus connector input of the second R-32 sensor; and

the sensor feedback port of the second R-32 sensor is electrically coupled to the second sensor connector of the R-32 control board.

9. The method of claim 8 , further comprising:

providing power from the R-32 control board to the first R-32 sensor;

providing power from the first R-32 sensor to the second R-32 sensor when the first R-32 sensor passes the first internal self-diagnostic test;

providing a feedback signal from the sensor feedback port of the second R-32 sensor to the R-32 control board, when the second R-32 sensor passes the second internal self-diagnostic test; and

turning on the air temperature controller using the R-32 control board in response to receiving the feedback signal at the R-32 control board.

10. The method of claim 9 , further comprising:

closing the sensor relay of the first R-32 sensor when the first R-32 sensor passes the first internal self-diagnostic test; and

closing the sensor relay of the second R-32 sensor when the second R-32 sensor passes the second internal self-diagnostic test.

11. The method of claim 7 , wherein:

a first default status of the sensor relay of the first R-32 sensor is open; and

a second default status of the sensor relay of the second R-32 sensor is open.

12. An air temperature controller for conditioning air inside a building, comprising:

an indoor unit disposed inside the building, the indoor unit having a heat exchanger that uses an R-32 refrigerant;

an outdoor unit disposed outside the building, wherein the outdoor unit is electrically coupled to the indoor unit;

an R-32 control board electrically coupled to one or more of the indoor unit and the outdoor unit;

a first R-32 sensor disposed within the indoor unit and electrically coupled to the R-32 control board;

a second R-32 sensor disposed within the indoor unit and electrically coupled to the R-32 control board, wherein:

the first R-32 sensor and the second R-32 sensor are coupled in series to the R-32 control board; and

each of the first R-32 sensor and the second R-32 sensor comprises:

a sensor component configured to detect an amount of the R-32 refrigerant in the air temperature controller;

a bus connector input;

a bus connector output;

a sensor relay electrically disposed between the bus connector input and the bus connector output; and

a sensor feedback port electrically disposed between the sensor relay and the bus connector output.

13. The air temperature controller of claim 12 , wherein the R-32 control board is configured to:

receive a feedback signal from one of the first R-32 sensor and the second R-32 sensor indicating that both the first R-32 sensor and the second R-32 sensor have passed respective self-diagnostic tests; and

in response to receiving the feedback signal, turn on one or more of the indoor unit and the outdoor unit.

14. The air temperature controller of claim 12 , wherein:

the first R-32 sensor is configured to close the sensor relay of the first R-32 sensor if the first R-32 sensor passes an internal self-diagnostic test; and

the second R-32 sensor is configured to close the sensor relay of the second R-32 sensor if the second R-32 sensor passes an internal self-diagnostic test.

15. The air temperature controller of claim 12 , wherein:

the R-32 control board comprises a first sensor connector and a second sensor connector;

the bus connector input of the first R-32 sensor is electrically and communicatively coupled to the first sensor connector of the R-32 control board;

the bus connector output of the first R-32 sensor is electrically and communicatively coupled to the bus connector input of the second R-32 sensor; and

the sensor feedback port of the second R-32 sensor is electrically coupled to the second sensor connector of the R-32 control board.

16. The air temperature controller of claim 15 , wherein:

the R-32 control board is configured to turn on one or more of the indoor unit and the outdoor unit of the air temperature controller in response to receiving a feedback signal from the sensor feedback port of the second R-32 sensor; and

the sensor feedback port of the second R-32 sensor does not receive power to send the feedback signal until the second R-32 sensor passes the internal self-diagnostic test and the sensor relay of the second R-32 sensor is closed.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 19, 2023
From: NOTARO, DOUGLAS; HONDA, MASAHIRO; KENDALL, MARK; YOH, HIROSHI; MARTINEZ, YENNY NATALI; WANG, PATRICK; FLORES, ROBERTO; TA, TIMMY
To: GOODMAN MANUFACTURING COMPANY LP
Reel/Frame 063377/0405 →
Continuity (2)
Continuation 17164618 · Feb 1, 2021
Related Publication 20230250981A1 · Aug 10, 2023
References Cited (24)
US 10852044B1 · Elliott · 2020 [cited by applicant]
US 10914482B2 · Yamamoto et al. · 2021 [cited by applicant]
US 11104457B1 · Brosh · 2021 [cited by examiner]
US 11125457B1 · Alfano · 2021 [cited by examiner]
US 11408624B2 · Hovardas · 2022 [cited by applicant]
US 20040153870A1 · Konz · 2004 [cited by examiner]
US 20070131784A1 · Garozzo · 2007 [cited by applicant]
US 20190390876A1 · Matsuda et al. · 2019 [cited by applicant]
US 20200248919A1 · Green et al. · 2020 [cited by applicant]
US 20200263891A1 · Noor · 2020 [cited by examiner]
US 20220042698A1 · Butler · 2022 [cited by applicant]
US 20220243938A1 · Notaro · 2022 [cited by applicant]
US 20220243939A1 · Notaro · 2022 [cited by applicant]
US 20220243941A1 · Notaro · 2022 [cited by applicant]
US 20220404048A1 · Delgoshaei · 2022 [cited by examiner]
US 20230282851A1 · Beaufrere · 2023 [cited by examiner]
CN 206593243U · 2017 [cited by applicant]
JP H06309579A · 1994 [cited by applicant]
JP 2020198220A · 2020 [cited by applicant]
WO 2017149625A1 · 2017 [cited by applicant]
WO 2020021661A1 · 2020 [cited by applicant]
International Search Report and Written Opinion issued in related PCT Application No. PCT/US2022/014611 mailed May 10, 2022, 11 pages. [cited by applicant]
Office action mailed Aug. 31, 2022, U.S. Appl. No. 17/164,575, filed Feb. 1, 2022. [cited by applicant]
Office action mailed Sep. 9, 2022, U.S. Appl. No. 17/164,598, filed Feb. 1, 2022. [cited by applicant]