IP Library › Granted Patent US 12,354,478
Granted Patent B2
US 12,354,478 · App. 18/460,585 · Granted Jul 8, 2025

Method of determining the total power required to charge multiple vehicles

Inventors: Yu Nagata (Chofu, JP); Toshihiro Nakamura (Shizuoka-ken, JP)
Assignee: TOYOTA JIDOSHA KABUSHIKA KAISHA
G08G1/148B60L53/63B60L58/13B60L2260/54
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,354,478
App. No.
18/460,585
Granted
Jul 8, 2025
Kind
B2
Abstract

A method performed by an information processing apparatus, the method includes, for each of a plurality of vehicles for which charging in a target time period has been applied for, acquiring vehicle information including predicted remaining SOC to be remaining at a start of the target time period and/or predicted consumed SOC to be consumed in a vehicle use period after an end of the target time period, determining, based on the vehicle information, whether each of the plurality of vehicles is a target for charging in the target time period, and determining a charging plan to charge a vehicle being determined to be eligible for charging, among the plurality of vehicles, in the target time period.

Claims (25)

1. A method performed by an information processing apparatus, the method comprising:

for each of a plurality of vehicles for which charging in a target time period has been applied for, acquiring vehicle information including predicted remaining SOC (state of charge) to be remaining at a start of the target time period and/or predicted consumed SOC to be consumed in a vehicle use period after an end of the target time period;

determining, based on the vehicle information, whether each of the plurality of vehicles is eligible for charging in the target time period;

determining a charging plan to charge a vehicle being determined to be eligible for charging, among the plurality of vehicles, in the target time period; and

acquiring supply power information including supply electrical energy to be supplied by a power supply facility for charging vehicles in the target time period,

wherein the information processing apparatus is configured to:

determine whether charging electrical energy required to bring the predicted remaining SOC of all the plurality of vehicles to a predetermined charged state is less than or equal to the supply electrical energy; and

determine all the plurality of vehicles to be eligible for charging when it is determined that the charging electrical energy is less than or equal to the supply electrical energy, and

wherein the supply electrical energy is a sum of commercial supply electrical energy to be supplied by a commercial power source, predicted electrical energy predicted to be supplied by a renewable energy source, and storage battery supply electrical energy to be supplied by a storage battery, each of which is multiplied by a coefficient.

2. A method, performed by an information processing apparatus, the method comprising:

for each of a plurality of vehicles for which charging in a target time period has been applied for, acquiring vehicle information including predicted remaining SOC (state of charge) to be remaining at a start of the target time period and/or predicted consumed SOC to be consumed in a vehicle use period after an end of the target time period;

determining, based on the vehicle information, whether each of the plurality of vehicles is eligible for charging in the target time period; and

determining a charging plan to charge a vehicle being determined to be eligible for charging, among the plurality of vehicles, in the target time period,

wherein the information processing apparatus is configured to:

determine a vehicle whose predicted consumed SOC is greater than or equal to a first threshold, among the plurality of vehicles, as a first candidate for charging;

determine a vehicle whose value subtracting the predicted consumed SOC from the predicted remaining SOC is less than a second threshold, among the first candidate, as a second candidate for charging, when a predetermined condition based on at least the predicted remaining SOC of the vehicle as the first candidate is satisfied; and

determine a vehicle whose time between a predetermined time in the target time period and a start time of the vehicle use period is less than a third threshold, among the second candidate, as a third candidate for charging, when a predetermined condition based on at least the predicted remaining SOC of the vehicle as the second candidate is satisfied.

3. A method performed by an information processing apparatus, the method comprising:

for each of a plurality of vehicles for which charging in a target time period has been applied for, acquiring vehicle information including predicted remaining SOC (state of charge) to be remaining at a start of the target time period and/or predicted consumed SOC to be consumed in a vehicle use period after an end of the target time period;

determining, based on the vehicle information, whether each of the plurality of vehicles is eligible for charging in the target time period;

determining a charging plan to charge a vehicle being determined to be eligible for charging, among the plurality of vehicles, in the target time period;

acquiring supply power information including supply electrical energy to be supplied by a power supply facility for charging vehicles in the target time period;

determining whether charging electrical energy required to bring the predicted remaining SOC of all the plurality of vehicles to a predetermined charged state is less than or equal to the supply electrical energy; and

when it is determined that the charging electrical energy is greater than the supply electrical energy, determining a vehicle whose value subtracting the predicted consumed SOC from the predicted remaining SOC is greater than a reference value, among vehicles having not been determined to be eligible for charging, as a power feeding vehicle,

wherein the information processing apparatus is configured to determine a power feeding plan for the power feeding vehicle to feed power.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 4, 2023
From: NAGATA, YU; NAKAMURA, TOSHIHIRO
To: TOYOTA JIDOSHA KABUSHIKI KAISHA
Reel/Frame 064785/0767 →
Priority Claims (1)
JP 2022-145654 · Sep 13, 2022 · national
Continuity (1)
Related Publication 20240087456A1 · Mar 14, 2024
References Cited (19)
US 11447024B1 · Brannan · 2022 [cited by examiner]
US 12221004B2 · Kim · 2025 [cited by examiner]
US 20140028254A1 · Shane et al. · 2014 [cited by applicant]
US 20160357654A1 · de la Cropte De Chantérac · 2016 [cited by examiner]
US 20210221243A1 · Kawamoto · 2021 [cited by examiner]
US 20210331603A1 · Brombach · 2021 [cited by examiner]
US 20220080852A1 · Yu · 2022 [cited by examiner]
US 20220188710A1 · Nagata · 2022 [cited by examiner]
US 20220266716A1 · Kim · 2022 [cited by examiner]
US 20220305942A1 · Mannepalli · 2022 [cited by examiner]
US 20220348105A1 · Sujan · 2022 [cited by examiner]
US 20230398895A1 · Lu · 2023 [cited by examiner]
CN 106828126A · 2017 [cited by examiner]
CN 115411717A · 2022 [cited by examiner]
CN 116706279A · 2023 [cited by examiner]
JP 2015186391A · 2015 [cited by applicant]
JP 2021191044A · 2021 [cited by applicant]
JP 2022118575A · 2022 [cited by examiner]
WO WO2023283078A1 · 2023 [cited by examiner]