US 6091717A
· Honkasalo
· 2000
[cited by applicant]
US 6501745B1
· Turina et al.
· 2002
[cited by applicant]
US 6580720B1
· Francis et al.
· 2003
[cited by applicant]
US 6785232B1
· Kotser et al.
· 2004
[cited by applicant]
US 7418260B2
· Lucidarme
· 2008
[cited by applicant]
US 7447504B2
· Lohr et al.
· 2008
[cited by applicant]
US 7477609B2
· Agir
· 2009
[cited by applicant]
US 7580392B2
· Yang et al.
· 2009
[cited by applicant]
US 7904113B2
· Ozluturk et al.
· 2011
[cited by applicant]
US 7948936B2
· Lohr et al.
· 2011
[cited by applicant]
US 7948958B2
· Vimpari et al.
· 2011
[cited by applicant]
US 8139523B2
· Usuda et al.
· 2012
[cited by applicant]
US 8320340B2
· Sim et al.
· 2012
[cited by applicant]
US 8570952B2
· Terry et al.
· 2013
[cited by applicant]
US 8582514B2
· Moberg et al.
· 2013
[cited by applicant]
US 8861343B2
· Yang et al.
· 2014
[cited by applicant]
US 8873474B2
· Pelletier et al.
· 2014
[cited by applicant]
US 20060104240A1
· Sebire et al.
· 2006
[cited by applicant]
US 20060146761A1
· Kim et al.
· 2006
[cited by applicant]
US 20060280145A1
· Revel et al.
· 2006
[cited by applicant]
US 20060291429A1
· Matusz
· 2006
[cited by applicant]
EP 1507352
· 2005
[cited by applicant]
EP 1633086
· 2006
[cited by applicant]
EP 1689132
· 2006
[cited by applicant]
GB 2401760
· 2004
[cited by applicant]
WO 9941918
· 1999
[cited by applicant]
WO 0163856
· 2001
[cited by applicant]
WO 04042993
· 2004
[cited by applicant]
WO 04098222
· 2004
[cited by applicant]
WO 05078967
· 2005
[cited by applicant]
WO 06034747
· 2006
[cited by applicant]
WO 06067570
· 2006
[cited by applicant]
WO 06121262
· 2006
[cited by applicant]
WO 07024099
· 2007
[cited by applicant]
3GPP Support Team, “Draft2 minutes of the 58bis TSG-RAN WG2 meeting, (Orlando, USA, Jun. 25-29, 2007),” TSG-RAN WG2 meeting #59, R2-073623, Athens, Greece (Aug. 20-24, 2007).
[cited by applicant]
3GPP Support Team, “Draft2 minutes of the 58th TSG-RAN WG2 meeting (Kobe, Japan, May 7-11, 2007),” TSG-RAN WG2 meeting #58bis, R2-072901, Orlando, USA (Jun. 25-29, 2007).
[cited by applicant]
3GPP, 3
[cited by applicant]
3GPP, 3
[cited by applicant]
3GPP, 3
[cited by applicant]
3GPP, 3
[cited by applicant]
3GPP, 3
[cited by applicant]
3GPP, 3
[cited by applicant]
3GPP, 3
[cited by applicant]
3GPP, 3
[cited by applicant]
3GPP, 3
[cited by applicant]
3GPP, 3
[cited by applicant]
3GPP, 3
[cited by applicant]
3GPP, 3
[cited by applicant]
3GPP, 3
[cited by applicant]
3GPP, 3
[cited by applicant]
3GPP, 3
[cited by applicant]
China National Intellectual Property Adminsitration, Examination Decision on Request for Invalidation, Chinese Patent No. 200780031104.7 (Nov. 30, 2020).
[cited by applicant]
China National Intellectual Property Adminsitration, Examination Decision on Request for Invalidation, Chinese Patent No. 201310189815.4 (Nov. 30, 2020).
[cited by applicant]
European Telecommunications Standards Institute, “Universal Mobile Telecommunications System (UMTS); FDD Enhanced Uplink; Overall description; Stage 2 (3GPP TS 25.309 Version 6.1.0 Release 6)”, ETSI TS 125 309 V6.1.0 (D…
[cited by applicant]
European Telecommunications Standards Institute, “Universal Mobile Telecommunications System (UMTS); Medium Access Control (MCA) Protocol Specification (3GPP TS 25.321 Version 6.9.0 Release 6)”, ETSI TS 125 321 V6.9.0 (…
[cited by applicant]
Gozalvez, “First HSUPA Live Demonstrations,” IEEE Vehicular Technology Magazine, vol. 1, No. 4, pp. 60-65 (Dec. 2006).
[cited by applicant]
Holma et al., HSDPA/HSUPA for UMTS: High Speed Radio Access for Mobile Communications, John Wiley & Sons, pp. 176-180, 205-213 (Apr. 2006).
[cited by applicant]
Huawei, “Periodic triggering of Scheduling Information,” 3GPP TSG-RAN-WG2 Meeting #54, R2-062455, Tallinn, Esthonia (Aug. 28-Sep. 1, 2006).
[cited by applicant]
Infineon, “Further clarifications on Scheduling Information,” 3GPP TSG-RAN WG2 Meeting #47, R2-051267, Athens, Greece (May 9-13, 2005).
[cited by applicant]
[cited by applicant]
[cited by applicant]
[cited by applicant]
[cited by applicant]
[cited by applicant]
[cited by applicant]
[cited by applicant]
[cited by applicant]
[cited by applicant]
[cited by applicant]
[cited by applicant]
[cited by applicant]
[cited by applicant]
[cited by applicant]
[cited by applicant]
[cited by applicant]
[cited by applicant]
[cited by applicant]
[cited by applicant]
[cited by applicant]
[cited by applicant]
Mobile Europe, “First HSUPA call using data card,” available at www.mobileeurope.co.uk/1665 (Oct. 11, 2006).
[cited by applicant]
Nullity Action, Orope Germany GmbH Petition for Invalidity EP 2 421 318 B1 (Jun. 10, 2022).
[cited by applicant]
Panasonic, “Content of E-AGCH,” 3GPP TSG-RAN WG2#46bis meeting, R2-050817, Beijing, China (Apr. 4-8, 2005).
[cited by applicant]
phonearena.com, “Trial HSUPA handset to handset call completed,” available at www.phonearena.com/news/trial-HSUPA-handset-to-handset-call-completed_id1038 (Feb. 9, 2006).
[cited by applicant]
Qualcomm et al., “Rate-request Proposal,” 3GPP TSG-RAN WG2 Meeting #45bis, R2-050179, Sophia Antipolis, France (Jan. 10-14, 2005).
[cited by applicant]
Qualcomm Europe, “Addition of an SI trigger when UE grant <> 0 and at least one process is activated,” 3GPP TSG-RAN WG2 Meeting #59, R2-073822, Athens, Greece (Aug. 20-24, 2007).
[cited by applicant]
Qualcomm Europe, “Handling of insufficient UE grant,” 3GPP TSG-RAN WG2 #59, R2-073430, Athens, Greece (Aug. 20-24, 2007).
[cited by applicant]
Qualcomm, “Qualcomm Paves the Way for Next-Generation Services on HSUPA,” available at www.qualcomm.com/news/releases/2006/05/04/qualcomm-paves-way-next-generation-services-hsupa (May 4, 2006).
[cited by applicant]
Qualcomm, “SI Transmission Triggering Schemes,” 3GPP TSG-RAN WG2 meeting #46bis, R2-050956, Beijing, China (Apr. 4-8, 2005).
[cited by applicant]
Samsung, “Buffer Status Reporting Triggers for EDCH,” 3GPP TSG-RAN2 Meeting #46, R2-050346, Scottsdale, USA (Feb. 14-18, 2005).
[cited by applicant]
Samsung, “Buffer Status Reporting Triggers for EDCH,” 3GPP TSG-RAN2 Meeting #46bis, R2-050835, Beijing, China (Apr. 4-8, 2005).
[cited by applicant]
Third Generation Partnership Project, “ Technical Specification Group Services and System Aspects; Technical Specifications and Technical Reports for a UTRAN-based 3GPP system (Release 6),” 3GPP TS 21.101 V6.4.2 (Apr. 2…
[cited by applicant]
Third Generation Partnership Project, “ Technical Specification Group Services and System Aspects; Technical Specifications and Technical Reports for a UTRAN-based 3GPP system (Release 6),” 3GPP TS 21.101 V6.7.0 (Jun. 2…
[cited by applicant]
Third Generation Partnership Project, “Technical Specification Group Radio Access Network; Feasibility Study for Enhanced Uplink for UTRA FDD (Release 6),” 3GPP TR 25.896 V6.0.0 (Mar. 2004).
[cited by applicant]
Third Generation Partnership Project, “Technical Specification Group Radio Access Networks; User Equipment (UE) radio transmission and reception (FDD) (Release 1999),” 3GPP TS 25.101 V3.18.0 (Sep. 2005).
[cited by applicant]
Third Generation Partnership Project, “Technical Specification Group Radio Access Networks; User Equipment (UE) radio transmission and reception (FDD) (Release 1999),” 3GPP TS 25.101 V3.19.0 (Dec. 2006).
[cited by applicant]
Third Generation Partnership Project, “Technical Specification Group Radio Access Networks; User Equipment (UE) radio transmission and reception (FDD) (Release 4),” 3GPP TS 25.101 V4.12.0 (Sep. 2005).
[cited by applicant]
Third Generation Partnership Project, “Technical Specification Group Radio Access Networks; User Equipment (UE) radio transmission and reception (FDD) (Release 4),” 3GPP TS 25.101 V4.13.0 (Dec. 2006).
[cited by applicant]
Third Generation Partnership Project, “Technical Specification Group Radio Access Network; User Equipment (UE) radio transmission and reception (FDD) (Release 5),” 3GPP TS 25.101 V5.20.0 (Dec. 2006).
[cited by applicant]
Third Generation Partnership Project, “Technical Specification Group Radio Access Network; User Equipment (UE) radio transmission and reception (FDD) (Release 6),” 3GPP TS 25.101 V6.12.0 (Jun. 2006).
[cited by applicant]
Third Generation Partnership Project, “Technical Specification Group Radio Access Network; User Equipment (UE) radio transmission and reception (FDD) (Release 6),” 3GPP TS 25.101 V6.14.0 (Dec. 2006).
[cited by applicant]
Third Generation Partnership Project, “Technical Specification Group Radio Access Network; User Equipment (UE) radio transmission and reception (FDD) (Release 5),” 3GPP TS 25.101 V5.19.0 (Jun. 2006).
[cited by applicant]
Third Generation Partnership Project, “Technical Specification Group Radio Access Network; User Equipment (UE) radio transmission and reception (FDD) (Release 7),” 3GPP TS 25.101 V7.4.0 (Jun. 2006).
[cited by applicant]
Third Generation Partnership Project, “Technical Specification Group Radio Access Network; User Equipment (UE) radio transmission and reception (FDD) (Release 7),” 3GPP TS 25.101 V7.8.0 (Jun. 2007).
[cited by applicant]
Third Generation Partnership Project, “Technical Specification Group Radio Access Network; Physical Channels and Modulation (Release 8),” 3GPP TS 36.211 V1.2.0 (Jun. 2007).
[cited by applicant]
Third Generation Partnership Project, “Technical Specification Group Radio Access Network; Radio Interface Protocol Architecture (Release 6),” 3GPP TS 25.301 V6.4.0 (Sep. 2005).
[cited by applicant]
Third Generation Partnership Project, “Technical Specification Group Radio Access Network; Radio Interface Protocol Architecture (Release 6),” 3GPP TS 25.301 V7.0.0 (Mar. 2006).
[cited by applicant]
Third Generation Partnership Project, “Technical Specification Group Radio Access Network; Radio Interface Protocol Architecture (Release 6),” 3GPP TS 25.301 V7.2.0 (Jun. 2007).
[cited by applicant]
Third Generation Partnership Project, “Technical Specification Group Radio Access Network; Medium Access Control (MAC) protocol specification (Release 7),” 3GPP TS 25.321 V7.5.0 (Jun. 2007).
[cited by applicant]
Third Generation Partnership Project, “Technical Specification Group Radio Access Network; Medium Access Control (MAC) Protocol Specification (Release 7),” 3GPP TS 25.321, V7.6.0, (Sep. 2007).
[cited by applicant]
Third Generation Partnership Project, Technical Specification Group Radio Access Network; Medium Access Control (MAC) Protocol Specification (Release 7), 3GPP TS 25.321, V6.2.0, (Jun. 2004).
[cited by applicant]
Third Generation Partnership Project, “Technical Specification Group Radio Access Network; Physical channels and mapping of transport channels onto physical channels (FDD) (Release 7),” 3GPP TS 25.211 V7.0.0 (Mar. 2006).
[cited by applicant]
Third Generation Partnership Project, “Technical Specification Group Radio Access Network; Physical channels and mapping of transport channels onto physical channels (FDD) (Release 7),” 3GPP TS 25.211 V7.2.0 (May 2007).
[cited by applicant]
Third Generation Partnership Project, “Technical Specification Group Services and System Aspects; Technical Specifications and Technical Reports for a UTRAN-based 3GPP system (Release 6),” 3GPP TS 21.101 V6.4.1 (Jun. 20…
[cited by applicant]
ZTE Corporation, “Consideration of RG-STEP Size in E-DCH,” 3GPP TSG-RAN WG2#58, R2-071749, Kobe, Japan (May 7-11, 2007).
[cited by applicant]
ZTE Corporation, “Correction of Serving Grant update Procedure in E-DCH (Rel-6),” 3GPP TSG-RAN WG2#58, R2-071747, Kobe, Japan (May 7-11, 2007).
[cited by applicant]
ZTE Corporation, “Correction of Serving Grant update Procedure in E-DCH (Rel-7),” 3GPP TSG-RAN WG2#58, R2-071748, Kobe, Japan (May 7-11, 2007).
[cited by applicant]
ZTE Corporation, “The consideration on Serving Grant update Procedure and RG-STEP Size in E-DCH,” 3GPP TSG-RAN WG2#58bis, R2-072448, Orlando, USA (Jun. 25-29, 2007).
[cited by applicant]