IP Library › Granted Patent US 12,644,379
Granted Patent B2
US 12,644,379 · App. 19/117,651 · Granted Jun 2, 2026

Pressure response test to detect leakage of rotating control device

Inventors: Rodrigo Feliu (Sugar Land, TX); Christopher Scott Del Campo (Sugar Land, TX); Emilio De Matias Salces (Clamart, FR)
Assignee: Schlumberger Technology Corporation
E21B47/117E21B34/025
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,644,379
App. No.
19/117,651
Granted
Jun 2, 2026
Kind
B2
Abstract

A method includes initiating a managed pressure drilling (MPD) operation in an MPD system including a rotating control device (RCD) including at least one sealing element and a plurality of pressures sensors placed relative to the at least one scaling element. The RCD is positioned in the MPD system so as to receive fluid exiting an annulus of a wellbore. Further, the method includes creating a pressure spike in the annulus of the wellbore during the MPD operation, and monitoring a pressure differential between the plurality of pressure sensors to determine whether there is a leakage within the RCD.

Claims (71)

1 . A method, comprising:

initiating a managed pressure drilling operation in a managed pressure drilling system comprising:

a rotating control device comprising:

at least one sealing element; and

a plurality of pressure sensors placed relative to the at least one sealing element,

wherein the rotating control device is positioned in the managed pressure drilling system so as to receive fluid exiting an annulus of a wellbore;

creating a pressure spike in the annulus of the wellbore during the managed pressure drilling operation; and

monitoring a pressure differential between the plurality of pressure sensors to determine whether there is a leakage within the rotating control device,

wherein the managed pressure drilling system further comprises:

a choke manifold connected to the rotating control device via a primary line; and

a backpressure pump having an inlet and an outlet,

wherein the inlet of the backpressure pump is connected to a fluid source,

wherein the outlet of the backpressure pump is connected to a backpressure line,

wherein the backpressure line is fluidly connected to the rotating control device, and

wherein the backpressure line is a dedicated test line that is connected directly to the rotating control device.

2 . The method of claim 1 , further comprising replacing the at least one sealing element when the pressure differential between the plurality of pressure sensors exceeds a predetermined threshold.

3 . The method of claim 1 , wherein the plurality of pressure sensors comprises: a first pressure sensor placed above the at least one sealing element, and a second pressure sensor placed below the at least one sealing element.

4 . The method of claim 1 ,

wherein the at least one sealing element comprises: an upper sealing element; and a lower sealing element,

wherein the plurality of pressure sensors comprises: a first pressure sensor placed above the upper and lower sealing elements; a second pressure sensor placed below the upper and lower sealing elements; and an intermediate pressure sensor placed between the upper and lower sealing elements.

5 . The method of claim 1 , wherein a pump connected to the rotating control device creates the pressure spike in the annulus of the wellbore during the managed pressure drilling operation.

6 . The method of claim 1 , wherein creating the pressure spike in the annulus of the wellbore during the managed pressure drilling operation comprises restricting a flow of the fluid flowing through the choke manifold.

7 . The method of claim 1 , wherein creating the pressure spike in the annulus of the wellbore during the managed pressure drilling operation comprises pumping a backpressure fluid into the backpressure line using the backpressure pump.

8 . The method of claim 1 , wherein the managed pressure drilling system is connected to a drilling fluid circulation system comprising:

at least one tank containing drilling fluid;

at least one drilling fluid pump operable to move the drilling fluid from the at least one tank and into a fluid passage of a drill string disposed in the wellbore via a fluid conduit disposed between the at least one drilling fluid pump and the rotating control device; and

drilling fluid reconditioning equipment located downstream of the choke manifold that cleans or reconditions the drilling fluid before returning the drilling fluid to the tank.

9 . The method of claim 8 , wherein the drilling fluid reconditioning equipment comprises a shaker.

10 . The method of claim 8 , wherein the fluid source connected to the inlet of the backpressure pump is the at least one tank.

11 . The method of claim 1 , wherein the rotating control device is placed on top of a blowout preventer stack in the managed pressure drilling system.

12 . A test system for a managed pressure drilling system comprising:

a rotating control device comprising:

at least one sealing element;

a plurality of pressure sensors placed relative to the at least one sealing element,

wherein the rotating control device is positioned in the managed pressure drilling system so as to receive fluid exiting an annulus of a wellbore; and

a test port;

a pump; and

a choke manifold connected to the rotating control device via a primary line,

wherein at least one of the pump and the choke manifold is configured to create a pressure spike in the annulus of the wellbore during a managed pressure drilling operation,

wherein the plurality of pressure sensors are configured to generate pressure sensor data indicative of a condition of the at least one sealing element as a result of creating the pressure spike in the annulus of the wellbore during the managed pressure drilling operation, and

wherein the pump is configured to direct fluid into the test port of the rotating control device to create the pressure spike in the annulus of the wellbore during the managed pressure drilling operation.

13 . The test system of claim 12 , wherein the plurality of pressure sensors comprises: a first pressure sensor placed above the at least one sealing element, and a second pressure sensor placed below the at least one sealing element.

14 . The test system of claim 12 ,

wherein the at least one sealing element comprises: an upper sealing element; and a lower sealing element,

wherein the plurality of pressure sensors comprises: a first pressure sensor placed above the upper and lower sealing elements; a second pressure sensor placed below the upper and lower sealing elements; and an intermediate pressure sensor placed between the upper and lower sealing elements.

15 . The test system of claim 12 , wherein the pump is a backpressure pump having an inlet and an outlet,

wherein the inlet of the backpressure pump is connected to a fluid source, and

wherein the outlet of the backpressure pump is connected to a backpressure line, and

wherein the backpressure line is fluidly connected to the rotating control device.

16 . The test system of claim 15 , wherein the backpressure line is connected to the primary line at a location upstream of the choke manifold.

17 . The test system of claim 15 , further comprising:

a drilling fluid circulation system comprising:

at least one tank containing drilling fluid;

at least one drilling fluid pump operable to move the drilling fluid from the at least one tank and into a fluid passage of a drill string disposed in the wellbore via a fluid conduit disposed between the at least one drilling fluid pump and the rotating control device; and

drilling fluid reconditioning equipment located downstream of the choke manifold that cleans or reconditions the drilling fluid before returning the drilling fluid to the tank.

18 . The test system of claim 17 , wherein the fluid source connected to the inlet of the backpressure pump is the at least one tank.

19 . The test system of claim 12 , wherein the rotating control device is placed on top of a blowout preventer stack in the managed pressure drilling system.

20 . A test system for a managed pressure drilling system comprising:

a rotating control device comprising:

at least one sealing element;

a plurality of pressure sensors placed relative to the at least one sealing element, wherein the rotating control device is positioned in the managed pressure drilling system so as to receive fluid exiting an annulus of a wellbore; and

a test port;

a pump; and

a choke manifold connected to the rotating control device via a primary line,

wherein at least one of the pump and the choke manifold is configured to create a pressure spike in the annulus of the wellbore during a managed pressure drilling operation,

wherein the plurality of pressure sensors are configured to generate pressure sensor data indicative of a condition of the at least one sealing element as a result of creating the pressure spike in the annulus of the wellbore during the managed pressure drilling operation, and

wherein the pump is a backpressure pump having an inlet and an outlet,

wherein the inlet of the backpressure pump is connected to a fluid source, and

wherein the outlet of the backpressure pump is connected to a backpressure line, and

wherein the backpressure line is fluidly connected to the rotating control device, and

wherein the backpressure line is fluidly connected to the rotating control device via the test port.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 15, 2026
From: FELIU, RODRIGO; DEL CAMPO, CHRISTOPHER SCOTT; DE MATIAS SALCES, EMILIO
To: SCHLUMBERGER TECHNOLOGY CORPORATION
Reel/Frame 073476/0308 →
Continuity (2)
Provisional Application 63379523 · Oct 14, 2022
Related Publication 20260009325A1 · Jan 8, 2026
References Cited (26)
US 7040394B2 · Bailey · 2006 [cited by applicant]
US 7487837B2 · Bailey · 2009 [cited by applicant]
US 7743823B2 · Hughes · 2010 [cited by applicant]
US 8033335B2 · Orbell · 2011 [cited by applicant]
US 8347983B2 · Hoyer · 2013 [cited by applicant]
US 8636087B2 · Hannegan · 2014 [cited by applicant]
US 9371697B2 · Gray et al. · 2016 [cited by applicant]
US 9702210B2 · Dirksen · 2017 [cited by applicant]
US 10240426B2 · Grace · 2019 [cited by applicant]
US 10612336B2 · Lewis · 2020 [cited by applicant]
US 10781657B2 · Hardt · 2020 [cited by applicant]
US 11885213B2 · Mammadov · 2024 [cited by applicant]
US 12398604B2 · Katanguri · 2025 [cited by applicant]
US 20090152006A1 · Leduc · 2009 [cited by examiner]
US 20100008190A1 · Gray et al. · 2010 [cited by applicant]
US 20100288507A1 · Duhe et al. · 2010 [cited by applicant]
US 20140299316A1 · Needham et al. · 2014 [cited by applicant]
US 20160168911A1 · Karigan · 2016 [cited by applicant]
US 20190078429A1 · Zheng · 2019 [cited by examiner]
US 20190093445A1 · Kulkarni et al. · 2019 [cited by applicant]
US 20200362651A1 · Fraczek · 2020 [cited by examiner]
US 20200362659A1 · Fraczek · 2020 [cited by examiner]
US 20220381105A1 · Wilson · 2022 [cited by examiner]
WO 2014105077A1 · 2014 [cited by applicant]
WO 2015060836A1 · 2015 [cited by applicant]
International Search Report and Written Opinion of International Patent Application No. PCT/US2023/034830 dated on Feb. 7, 2024, 12 pages. [cited by applicant]