Granted Patent
B2
US 12,720,303 · App. 18/414,455 · Granted Aug 25, 2026
Methods, systems, and computer readable media for detecting and processing inter-public land mobile network (PLMN) service-based interface (SBI) messages without 3GPP-Sbi-originating-network-Id headers
View Patent ↗
Loading inventors, assignments & file history…
Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST
Recorded Jan 17, 2024
From: MOHAN RAJ, JOHN NIRMAL; KADYAN, SONIA; SHARMA, ASHISH JYOTI; RAJPUT, JAY
To: ORACLE INTERNATIONAL CORPORATION
Reel/Frame 066151/0923 →
Continuity (1)
References Cited (85)
US 20220095111A1
· Fu
· 2022
[cited by examiner]
US 20220353263A1
· Choyi et al.
· 2022
[cited by applicant]
US 20230291818A1
· Yang
· 2023
[cited by examiner]
US 20230396602A1
· Wu
· 2023
[cited by examiner]
US 20240107299A1
· Wang
· 2024
[cited by examiner]
US 20240381224A1
· Landais
· 2024
[cited by examiner]
US 20250126475A1
· Li
· 2025
[cited by examiner]
US 20250294358A1
· Mohan Raj
· 2025
[cited by examiner]
CN 112003912B
· 2021
[cited by applicant]
CN 120614685A
· 2025
[cited by examiner]
CN 121509976A
· 2026
[cited by examiner]
EP 4152691A1
· 2023
[cited by applicant]
WO WO2024125763A1
· 2024
[cited by applicant]
WO WO2025117125A1
· 2025
[cited by applicant]
Commonly-Assigned, co-pending U.S. Appl. No. 18/523,487 for “Methods, Systems, and Computer Readable Media for Detecting and Mitigating Security Attacks on Producer Network Functions (NFs) Using Mappings Between Dynamic…
[cited by applicant]
Commonly-Assigned, co-pending U.S. Appl. No. 18/523,425 for “Methods, Systems, and Computer Readable Media for Detecting and Mitigating Security Attacks on Producer Network Functions (NFs) Using Access Token to Non-Acce…
[cited by applicant]
Commonly-Assigned, co-pending U.S. Appl. No. 18/523,322 for “Methods, Systems, and Computer Readable Media for Detecting and Mitigating Security Attacks on Producer Network Functions (NFs) Using Error Response Messages”…
[cited by applicant]
“3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; System architecture for the 5G System (5GS); Stage 2 (Release 18)” 3GPP TS 23.501, V18.3.0, pp. 1-696 (Sep. 2023).
[cited by applicant]
“3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Procedures for the 5G System (5GS); Stage 2 (Release 18)” 3GPP TS 23.502, V18.3.0, pp. 1-899 (Sep. 2023).
[cited by applicant]
“3rd Generation Partnership Project; Technical Specification Group Core Network and Terminals; 5G System; Session Management Services; Stage 3 (Release 18)” 3GPP TS 29.502, V18.4.0, pp. 1-355 (Sep. 2023).
[cited by applicant]
3rd Generation Partnership Project; Technical Specification Group Core Network and Terminals; 5G System; Technical Realization of Service Based Architecture; Stage 3 (Release 18) 3GPP TS 29.500 V18.3.0 pp. 1-148 (Sep. 2…
[cited by applicant]
3rd Generation Partnership Project; Technical Specification Group Core Network and Terminals; 5G System; Network Function Repository Services; Stage 3 (Release 18) 3GPP TS 29.510 V18.4.0 pp. 1-373 (Sep. 2023).
[cited by applicant]
3rd Generation Partnership Project; Technical Specification Group Core Network and Terminals; 5G System; Public Land Mobile Network (PLMN) Interconnection; Stage 3 (Release 18) 3GPP TS 29.573 V18.4.0 pp. 1-116 (Sep. 202…
[cited by applicant]
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Security architecture and procedures for 5G system (Release 18) 3GPP TS 33.501 V18.3.0 pp. 1-322 (Sep. 2023).
[cited by applicant]
3rd Generation Partnership Project; Technical Specification Group Core Network and Terminals; 5G System; Technical Realization of Service Based Architecture; Stage 3 (Release 18) 3GPP TS 29.500 V18.4.0 pp. 1-149 (Dec. 2…
[cited by applicant]
3rd Generation Partnership Project; Technical Specification Group Core Network and Terminals; 5G System; Network Function Repository Services; Stage 3 (Release 18) 3GPP TS 29.510 V18.5.0, pp. 1-382 (Dec. 2023).
[cited by applicant]
3rd Generation Partnership Project; Technical Specification Group Core Network and Terminals; 5G System; Public Land Mobile Network (PLMN) Interconnection; Stage 3 (Release 18) 3GPP TS 29.573 V18.5.0 pp. 1-130 (Dec. 202…
[cited by applicant]
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Security architecture and procedures for the 5G System; Stage 2 (Release 18) 3GPP TS 33.501 V18.4.0 pp. 1-326 (Dec. 2023).
[cited by applicant]
Keller et al., “Roaming in the 5G System: the 5GS roaming architecture,” Ericsson Technology Review Articles (Jun. 17, 2021).
[cited by applicant]
5G Roaming Guidelines, Official Document NG.113—GSM Association Version 2.0, pp. 1-36 (May 28, 2020).
[cited by applicant]
Content for TS 33.501 Word version: 18.4.0, pp. 1-8 (Downloaded Jan. 31, 24) https://www.tech-invite.com/3m33/toc/tinv-3gpp-33-501_e.html.
[cited by applicant]
Commonly-Assigned, co-pending U.S. Appl. No. 18/608,071 for “Methods, Systems, and Computer Readable Media for Filtering Inter-Public Land Mobile Network (PLMN) Messages at Security Edge Protection Proxy (SEPP) to Imple…
[cited by applicant]
Non-Final Office Action for U.S. Appl. No. 18/523,425 (Jul. 31, 2025).
[cited by applicant]
Notice of Allowance for U.S. Appl. No. 18/523,322 (Jul. 18, 2025).
[cited by applicant]
3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Security architecture and pocedures, 3GPP Draft: 33501-HAO, 3rd Generation Partnership Project (3GPP) Jun. 22, 2023.
[cited by applicant]
Notification of Transmittal of the International Search Report and the Written Opinion of the International Searching Authority, or the Declaration for International Patent Application Serial No. PCT/US2024/053761 (Feb.…
[cited by applicant]
Notice of Allowance for U.S. Appl. No. 18/523,425 (Dec. 10, 2025).
[cited by applicant]
Tang, “A Systematic Analysis of 5G Networks with a Focus on 5G Core Security”, Feb. 10, 2022, IEEE, pp. 18298-18318 (Year 2022).
[cited by applicant]
Non-Final Office Action for U.S. Appl. No. 18/523,487 (Oct. 23, 2025).
[cited by applicant]
5G; 5G System; Technical Realization of Service Based Architecture; Stage 3, 3GPP TS 29.500, version 17.12.0, Release 17 (Year: 2023).
[cited by applicant]
Non-Final Office Action for U.S. Appl. No. 18/608,071 (May 18, 2026).
[cited by applicant]