IP Library › Granted Patent US 12,739,879
Granted Patent B2
US 12,739,879 · App. 18/145,950 · Granted Sep 15, 2026

Apparatus and method of wireless communication

Inventor: Hao Lin (Neuilly-sur-Seine, FR)
Assignee: GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP., LTD.
H04W74/0808H04L1/1887H04W72/12
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,739,879
App. No.
18/145,950
Granted
Sep 15, 2026
Kind
B2
Abstract

An apparatus and a method of wireless communication are provided. The method by a user equipment (UE) includes determining a channel occupancy (CO) according to a first information and transmitting, to a base station (B S), an uplink (UL) transmission in the CO. This can solve issues in the prior art, reduce a signaling overhead, reduce a transmission latency, provide an uplink synchronization for uplink transmission, avoid the base station and the UE misunderstanding, provide a good communication performance, and/or provide high reliability.

Claims (39)

1 . A wireless communication method by a user equipment (UE), comprising:

determining a channel occupancy (CO) according to a first information, wherein the first information comprises a condition, and the CO comprises at least one of a UE initiated CO or a BS initiated CO, wherein the condition comprises an ordering, and the UE selects the UE initiated CO or the BS initiated CO according to the ordering; and

transmitting, to a base station (BS), an uplink (UL) transmission in the CO,

wherein the ordering comprises that the BS initiated CO has a higher priority than the UE initiated CO, and

wherein the UE obtains information about if a BS CO is initiated and when the BS CO is initiated, such that the UE can transmit the UL transmission in the BS initiated CO,

wherein the ordering comprises that the UE is allowed to transmit the UL transmission in the BS initiated CO, if the UL transmission is confined in the BS initiated CO in time domain and/or confined in the BS initiated CO in frequency domain,

wherein the UL transmission confined in the BS initiated CO in the time domain means that the UL transmission comprises a set of symbols in the time domain and the set of symbols are within the BS initiated CO, where the BS initiated CO starts from a beginning of a BS fixed frame period (FFP) period and ends at a maximum CO, where the maximum CO is determined according to a standard specification, and

the UL transmission confined in the BS initiated CO in the frequency domain means that the UL transmission comprises a set of frequency domain resources and the set of frequency domain resources is in one or more resource block (RB) sets of the BS initiated CO.

2 . The method of claim 1 , wherein the first information further comprises at least one of an indication, a pre-defined rule.

3 . The method of claim 2 , wherein the indication comprises that the UE is indicated to transmit, to the BS, the UL transmission in the UE initiated CO or the BS initiated CO.

4 . The method of claim 3 , wherein the indication is transmitted in a medium access control-control element (MAC-CE), a downlink control information (DCI), and/or a system information.

5 . The method of claim 3 , wherein when the UE receives the indication from the BS, the UE determines if the indication is valid.

6 . A wireless communication method by a base station (BS), comprising:

controlling a user equipment (UE) to determine a channel occupancy (CO) according to a first information, wherein the first information comprises a condition, and the CO comprises at least one of a UE initiated CO or a BS initiated CO, wherein the condition comprises an ordering, and the BS controls the UE to select the UE initiated CO or the BS initiated CO according to the ordering; and

receiving, from the UE, an uplink (UL) transmission in the CO,

wherein the ordering comprises that the BS initiated CO has a higher priority than the UE initiated CO, and

wherein the BS controls the UE to obtain information about if a BS CO is initiated and when the BS CO is initiated, such that the BS controls the UE to transmit the UL transmission in the BS initiated CO,

wherein the ordering comprises that the UE is allowed to transmit the UL transmission in the BS initiated CO, if the UL transmission is confined in the BS initiated CO in time domain and/or confined in the BS initiated CO in frequency domain,

wherein the UL transmission confined in the BS initiated CO in the time domain means that the UL transmission comprises a set of symbols in the time domain and the set of symbols are within the BS initiated CO, where the BS initiated CO starts from a beginning of a BS fixed frame period (FFP) period and ends at a maximum CO, where the maximum CO is determined according to a standard specification, and

wherein the UL transmission confined in the BS initiated CO in the frequency domain means that the UL transmission comprises a set of frequency domain resources and the set of frequency domain resources is in one or more resource block (RB) sets of the BS initiated CO.

7 . The method of claim 6 , wherein the first information further comprises at least one of an indication, a pre-defined rule.

8 . A base station, comprising:

a memory;

a transceiver; and

a processor coupled to the memory and the transceiver;

wherein the processor is configured to cooperate with the transceiver to implement the method of claim 6 .

9 . A user equipment (UE), comprising:

a memory;

a transceiver; and

a processor coupled to the memory and the transceiver;

wherein the processor is configured to cooperate with the transceiver to:

determine a channel occupancy (CO) according to a first information, wherein the first information comprises a condition, and the CO comprises at least one of a UE initiated CO or a BS initiated CO, wherein the condition comprises an ordering, and the UE selects the UE initiated CO or the BS initiated CO according to the ordering; and

transmit, to a base station (BS), an uplink (UL) transmission in the CO,

wherein the ordering comprises that the BS initiated CO has a higher priority than the UE initiated CO, and

wherein the UE obtains information about if a BS CO is initiated and when the BS CO is initiated, such that the UE can transmit the UL transmission in the BS initiated CO,

wherein the ordering comprises that the UE is allowed to transmit the UL transmission in the BS initiated CO, if the UL transmission is confined in the BS initiated CO in time domain and/or confined in the BS initiated CO in frequency domain,

wherein the UL transmission confined in the BS initiated CO in the time domain means that the UL transmission comprises a set of symbols in the time domain and the set of symbols are within the BS initiated CO, where the BS initiated CO starts from a beginning of a BS fixed frame period (FFP) period and ends at a maximum CO, where the maximum CO is determined according to a standard specification, and

wherein the UL transmission confined in the BS initiated CO in the frequency domain means that the UL transmission comprises a set of frequency domain resources and the set of frequency domain resources is in one or more resource block (RB) sets of the BS initiated CO.

10 . The UE of claim 9 , wherein the first information further comprises at least one of an indication, a pre-defined rule.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 23, 2024
From: OROPE FRANCE SARL
To: GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP., LTD.
Reel/Frame 066217/0741 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 23, 2022
From: LIN, HAO
To: OROPE FRANCE SARL
Reel/Frame 062194/0137 →
Priority Claims (1)
WO PCT/IB2020/000922 · Oct 23, 2020 · international
Continuity (2)
Continuation PCTIB2021059602 · Oct 19, 2021
Related Publication 20230135241A1 · May 4, 2023
References Cited (41)
US 12389452B2 · Lei · 2025 [cited by examiner]
US 20200053798A1 · Tsai · 2020 [cited by examiner]
US 20200245353A1 · Tsai · 2020 [cited by examiner]
US 20200275483A1 · Li · 2020 [cited by examiner]
US 20200280971A1 · Moon · 2020 [cited by examiner]
US 20200305184A1 · Kim · 2020 [cited by examiner]
US 20200351941A1 · Aldana · 2020 [cited by examiner]
US 20210092763A1 · Li · 2021 [cited by examiner]
US 20220210827A1 · Wang · 2022 [cited by examiner]
US 20220272754A1 · Lei · 2022 [cited by examiner]
US 20220303781A1 · Ye · 2022 [cited by examiner]
US 20220304058A1 · Wang · 2022 [cited by examiner]
US 20220304059A1 · Lei · 2022 [cited by examiner]
US 20220377790A1 · Awadin · 2022 [cited by examiner]
US 20220377813A1 · Wang · 2022 [cited by examiner]
US 20220408461A1 · Lei · 2022 [cited by examiner]
US 20230118130A1 · Tao · 2023 [cited by examiner]
US 20230156788A1 · Lunttila · 2023 [cited by examiner]
US 20230199833A1 · Xu · 2023 [cited by examiner]
US 20230239928A1 · Oteri · 2023 [cited by examiner]
US 20230254893A1 · Shibaike · 2023 [cited by examiner]
US 20230269772A1 · Chen · 2023 [cited by examiner]
US 20230284261A1 · Xu · 2023 [cited by examiner]
US 20230328785A1 · Zhang · 2023 [cited by examiner]
US 20230413320A1 · Singh · 2023 [cited by examiner]
US 20240098781A1 · Tsai · 2024 [cited by examiner]
US 20240237068A1 · Guo · 2024 [cited by examiner]
WO 2022079700A1 · 2022 [cited by applicant]
Xiaomi: “Enhancement for unlicensed band URLLC/IIoT” 3GPP Draft; R1-2005736, 3RD Generation Partnership Project (3GPP), Mobile Competence Centre; 650, Route Des Lucioles. F-06921 Sophia-Antipolis Cedex•France, vol. RAN … [cited by applicant]
LG Electronics: “Discussion on unlicensed band URLLC/IIot” 3GPP Draft R1-2006316 3RD Generation Partnership Project (3GPP), Mobile Competence Centre; 650, Route Des Lucioles; F-06921 Sophia-Antipolis Cedex; France, vol.… [cited by applicant]
Oppo: “Enhancements for unlicensed band URLLC/IIoT” 3GPP Draft; R1-2006060, 3RD Generation Partnership Project (3GPP), Mobile Competence Centre; 650, Route Des Lucioles•F-06921 Sophia-Antipolis Cedex•France, vol. RAN WG… [cited by applicant]
Ericsson: “Enhancements for IIoT/URLLC on Unlicensed Band” 3GPP Draft R1-2005515 3RD Generation Partnership Project (3GPP), Mobile Competence Centre; 650, Route Des Lucioles· F-06921 Sophia-Antipolis Cedex•France, vol. … [cited by applicant]
Spreadtrum Communications:“Discussion on enhancements for unlicensed band URLLCIIoT”, 3GPP Draft; R1-2006277 3RD Generation Partnership Project (3GPP), Mobile Competence Centre; 650, Route Des Lucioles• F-06921 Sophia-A… [cited by applicant]
Qualcomm Incorporated: “uplink enhancements for URLLC in unlicensed controlled environments”, 3GPP Draft; R1-2006801, 3RD Generation Partnership Project (3GPP), Mobile Competence Centre; 650, Route Deslucioles; F-06921 … [cited by applicant]
Apple Inc: “URLLC uplink enhancements for unlicensed spectrum”, 3GPP Draft; R1-2006516, 3RD Generation Partnership Project (3GPP), Mobile Competence Centre· 650 Route Des Lucioles F-06921 Sophiaantipolis Cedex; France, … [cited by applicant]
Ericsson: “Views on WID objective for IIOT/URLLC operation over shared spectrum”, 3GPP Draft; RP-200626, 3RD Generation Partnership Project (3GPP), Mobile Competence Centre•650 Route Des Lucioles• F-06921 Sophia-Antipol… [cited by applicant]
Ericsson: “Channel access procedures”, 3GPP Draft; R1-1912709, 3RD Generation Partnership Project (3GPP), Mobile Competence Centre; 650, Route Des Lucioles F-06921 Sophia-Antipolis Cedex• France vol. RAN WG1, No. Reno, … [cited by applicant]
International Search Report in the international application No. PCT/IB2021/059602, mailed on Jan. 28, 2022—5 pages. [cited by applicant]
Written Opinion of the International Search Authority in the international application No. PCT/IB2021/059602, mailed on Jan. 28, 2022—10 pages. [cited by applicant]
3GPP TS 37.213 V16.3.0, “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Physical layer procedures for shared spectrum channel access (Release 16)”, Technical Specification, (Sep.… [cited by applicant]
First Office Action of the European application No. 21801999.0, issued on Nov. 6, 2025, 8 pages. [cited by applicant]