IP Library Granted Patent US 7,140,235
Granted Patent B2
US 7,140,235 · App. 11/060,948 · Granted Nov 28, 2006

Leak detection system for a vehicle fuel tank

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,140,235
App. No.
11/060,948
Granted
Nov 28, 2006
Kind
B2
Abstract

A leak detection system for a vehicle fuel tank includes a sensor that is responsive to a pressure within the fuel tank and that generates a pressure signal based thereon. A control module initiates an engine-off natural vacuum (EONV) test and determines a pressure change based on the pressure signal. The control module pauses the EONV test when the pressure change exceeds a pressure change threshold.

Claims (32)

1. A leak detection system for a vehicle fuel tank, comprising:

a sensor that senses pressure within said fuel tank and that generates a pressure signal based thereon; and

a control module that initiates an engine-off natural vacuum (EONV) test, that determines a pressure change based on said pressure signal, that pauses said EONV test when said pressure change exceeds a pressure change threshold, and that resumes said EONV test when said pressure change is below said pressure change threshold.

2. The leak detection system of claim 1 wherein said control module aborts said EONV test when said pressure change exceeds said pressure change threshold for an abort threshold time.

3. The leak detection system of claim 1 wherein said control module completes said EONV test when said EONV test has run for a complete threshold time.

4. The leak detection system of claim 1 wherein said control module determines said pressure change as a difference between a current pressure and a prior pressure.

5. The leak detection system of claim 4 wherein said prior pressure is updated when said pressure change is below said pressure change threshold.

6. The leak detection system of claim 4 wherein said prior pressure remains constant while said pressure change exceeds said pressure change threshold.

7. A method of monitoring abortive pressure changes during leak detection for a vehicle fuel tank, comprising:

generating a pressure signal based on a pressure within said fuel tank;

initiating an engine-off natural vacuum (EONV) test;

determining a pressure change based on said pressure signal;

pausing said EONV test when said pressure change exceeds a pressure change threshold; and

resuming said EONV test when said pressure change is below said pressure change threshold.

8. The method of claim 7 further comprising aborting said EONV test when said pressure change exceeds said pressure change threshold for an abort threshold time.

9. The method of claim 7 further comprising completing said EONV test when said EONV test has run for a complete threshold time.

10. The method of claim 7 further comprising determining said pressure change as a difference between a current pressure and a prior pressure.

11. The method of claim 10 further comprising updating said prior pressure when said pressure change is below said pressure change threshold.

12. The method of claim 10 further comprising holding said prior pressure constant while said pressure change exceeds said pressure change threshold.

13. A method of monitoring abortive pressure changes during leak detection for a vehicle fuel tank, comprising:

generating a pressure signal based on a pressure within said fuel tank;

initiating an engine-off natural vacuum (EONV) test;

determining a pressure change based on said pressure signal; and

pausing said EONV test and initiating a test abort timer when said pressure change exceeds a pressure change threshold.

14. The method of claim 13 further comprising resuming said EONV test when said pressure change is below said pressure change threshold.

15. The method of claim 13 further comprising incrementing said test abort timer while said pressure change exceeds said pressure change threshold.

16. The method of claim 13 further comprising resetting said test abort timer when said pressure change is below said pressure change threshold.

17. The method of claim 13 further comprising aborting said EONV test when said test abort timer exceeds an abort threshold time.

18. The method of claim 13 further comprising completing said EONV test when said EONV test has run for a complete threshold time.

19. The method of claim 13 further comprising determining said pressure change as a difference between a current pressure and a prior pressure.

20. The method of claim 19 further comprising updating said prior pressure when said pressure change is below said pressure change threshold.

21. The method of claim 19 further comprising holding said prior pressure constant while said pressure change exceeds said pressure change threshold.

Assignments (13)
RELEASE OF SECURITY INTEREST Recorded Nov 7, 2014
From: WILMINGTON TRUST COMPANY
To: GM GLOBAL TECHNOLOGY OPERATIONS LLC
Reel/Frame 034371/0676 →
CHANGE OF NAME Recorded Feb 10, 2011
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: GM GLOBAL TECHNOLOGY OPERATIONS LLC
Reel/Frame 025780/0936 →
SECURITY AGREEMENT Recorded Nov 8, 2010
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: WILMINGTON TRUST COMPANY
Reel/Frame 025327/0001 →
RELEASE OF SECURITY INTEREST Recorded Nov 4, 2010
From: UNITED STATES DEPARTMENT OF THE TREASURY
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 025245/0442 →
RELEASE OF SECURITY INTEREST Recorded Nov 4, 2010
From: UAW RETIREE MEDICAL BENEFITS TRUST
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 025311/0770 →
SECURITY AGREEMENT Recorded Aug 28, 2009
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: UAW RETIREE MEDICAL BENEFITS TRUST
Reel/Frame 023162/0001 →
SECURITY AGREEMENT Recorded Aug 27, 2009
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: UNITED STATES DEPARTMENT OF THE TREASURY
Reel/Frame 023156/0052 →
RELEASE OF SECURITY INTEREST Recorded Aug 21, 2009
From: CITICORP USA, INC. AS AGENT FOR BANK PRIORITY SECURED PARTIES; CITICORP USA, INC. AS AGENT FOR HEDGE PRIORITY SECURED PARTIES
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 023127/0468 →
RELEASE OF SECURITY INTEREST Recorded Aug 20, 2009
From: UNITED STATES DEPARTMENT OF THE TREASURY
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 023124/0429 →
SECURITY AGREEMENT Recorded Apr 16, 2009
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: CITICORP USA, INC. AS AGENT FOR BANK PRIORITY SECURED PARTIES; CITICORP USA, INC. AS AGENT FOR HEDGE PRIORITY SECURED PARTIES
Reel/Frame 022553/0446 →
SECURITY AGREEMENT Recorded Feb 4, 2009
From: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
To: UNITED STATES DEPARTMENT OF THE TREASURY
Reel/Frame 022201/0610 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 14, 2009
From: GENERAL MOTORS CORPORATION
To: GM GLOBAL TECHNOLOGY OPERATIONS, INC.
Reel/Frame 022117/0022 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 7, 2005
From: MC LAIN, KURT D.; PITSCH, MICHAEL J.
To: GENERAL MOTORS CORPORATION
Reel/Frame 016027/0448 →