IP Library › Granted Patent US 12,216,455
Granted Patent B2
US 12,216,455 · App. 17/584,318 · Granted Feb 4, 2025

Chamber component condition estimation using substrate measurements

Inventors: Chunlei Zhang (Santa Clara, CA); Zhaozhao Zhu (Milpitas, CA); Michael Kutney (Santa Clara, CA)
Assignee: Applied Materials, Inc.
G05B19/41835G05B19/4183H01L21/67276H01L22/26G05B2219/45031
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,216,455
App. No.
17/584,318
Granted
Feb 4, 2025
Kind
B2
Abstract

A substrate processing system includes a process chamber, one or more robot, a substrate measurement system, and a computing device. The process chamber may process a substrate that will comprise a film and/or feature after the processing. The one or more robot, to move the substrate from the process chamber to a substrate measurement system. The substrate measurement system may measure the film and/or feature on the substrate and generate a profile map of the film and/or feature. The computing device may process data from the profile map using a first trained machine learning model, wherein the first trained machine learning model outputs a first chamber component condition estimation for a first chamber component of the process chamber. The computing device may then determine whether to perform maintenance on the first chamber component of the process chamber based at least in part on the first chamber component condition estimation.

Claims (57)

1. A method, comprising:

processing a substrate in a process chamber of a substrate processing system, wherein the substrate comprises at least one of a film or a feature after the processing;

measuring a plurality of locations on the substrate using a substrate measurement system of the substrate processing system;

generating a profile map of at least one of the film or the feature on the substrate based on measurements of the plurality of locations on the substrate;

processing data from the profile map using a first trained machine learning model, wherein the first trained machine learning model outputs a first chamber component condition estimation for a first chamber component of the process chamber;

determining at least one of a deficiency or a degradation of the first chamber component based on the first chamber component condition estimation; and

determining whether to perform maintenance on the first chamber component of the process chamber based on at least one of the deficiency or the degradation of the first chamber component.

2. The method of claim 1 , wherein the first chamber component comprises a substrate support, and wherein the first chamber component estimation comprises at least one of an estimated mesa erosion condition of the substrate support, an estimated seal band erosion condition of the substrate support, or an estimated lift pin location erosion condition of the substrate support.

3. The method of claim 2 , wherein:

the estimated mesa erosion condition comprises an estimation of an amount of erosion for one or more mesas of the substrates support;

the estimated seal band erosion condition comprises an estimation of erosion for one or more portions of the seal band of the substrates support; and

the estimated lift pin location erosion condition comprises an estimation of erosion for each lift pin location of the substrates support.

4. The method of claim 1 , wherein the first chamber component comprises a substrate support, and wherein the first chamber component estimation comprises at least one of an estimation of recesses in a surface of the substrate support, an estimation of a roughness across the surface of the substrate support, an estimation of a planarity of the surface of the substrate support, or an estimation of a concentricity of one or more circular elements of the substrate support.

5. The method of claim 1 , wherein the profile map of the film comprises a thickness profile map of the film.

6. The method of claim 1 , wherein the first chamber component comprises a showerhead, and wherein the first chamber component estimation comprises an estimated gas delivery for each of a plurality of regions of the showerhead.

7. The method of claim 1 , further comprising:

determining a probability that the first chamber component will cause a reduction in product quality based on the first chamber component estimation; and

determining whether to perform the maintenance on the first chamber component of the process chamber further based on the probability that the first chamber component will cause the reduction in the product quality.

8. The method of claim 1 , further comprising:

estimating a time of failure of the first chamber component based at least in part on the first chamber component condition estimation; and

determining when to perform the maintenance on the first chamber component of the process chamber based on the estimated time of failure.

9. The method of claim 1 , further comprising:

processing the data from the profile map using a second trained machine learning model, wherein the second trained machine learning model outputs a chamber component condition estimation for a second chamber component of the process chamber; and

determining whether to perform maintenance on the second chamber component of the process chamber based at least in part on the chamber component condition estimation for the second chamber component.

10. The method of claim 1 , further comprising:

training a first machine learning model to produce the first trained machine learning model, wherein the first machine learning model is trained using data from a plurality of process chambers that share a common process chamber type.

11. The method of claim 10 , further comprising:

tuning the first trained machine learning model using additional data from the process chamber prior to processing the data from the profile map.

12. The method of claim 1 , wherein the substrate is a blanket wafer.

13. A substrate processing system comprising:

a process chamber, to process a substrate that will comprise at least one of a film or a feature after the processing;

one or more robot, to move the substrate from the process chamber to a substrate measurement system;

the substrate measurement system, to measure a plurality of locations of at least one of the film or the feature on the substrate and generate a profile map of at least one of the film or the feature based on measurements of the plurality of locations; and

a computing device, to:

process data from the profile map using a first trained machine learning model, wherein the first trained machine learning model outputs a first chamber component condition estimation for a first chamber component of the process chamber;

determine at least one of a deficiency or a degradation of the first chamber component based on the first chamber component condition estimation; and

determine whether to perform maintenance on the first chamber component of the process chamber based on at least one of the deficiency or the degradation of the first chamber component.

14. The substrate processing system of claim 13 , wherein the first chamber component comprises a chuck, wherein the profile map comprises a thickness profile map, and wherein the first chamber component estimation comprises at least one of an estimated mesa erosion condition of the chuck, an estimated seal band erosion condition of the chuck, or an estimated lift pin location erosion condition of the chuck.

15. The substrate processing system of claim 14 , wherein:

the estimated mesa erosion condition comprises an estimation of an amount of erosion for one or more mesas of the chuck;

the estimated seal band erosion condition comprises an estimation of erosion for one or more portions of the seal band of the chuck; and

the estimated lift pin location erosion condition comprises an estimation of erosion for each lift pin location of the chuck.

16. The substrate processing system of claim 13 , wherein the first chamber component comprises a showerhead, and wherein the first chamber component estimation comprises an estimated gas delivery for each of a plurality of regions of the showerhead.

17. The substrate processing system of claim 13 , wherein the computing device is further to:

determine a probability that the first chamber component will cause a reduction in product quality based on the first chamber component estimation; and

determine whether to perform the maintenance on the first chamber component of the process chamber based further on the probability that the first chamber component will cause the reduction in the product quality.

18. The substrate processing system of claim 13 , wherein the computing device is further to:

estimate a time of failure of the first chamber component based at least in part on the first chamber component condition estimation; and

determine when to perform the maintenance on the first chamber component of the process chamber based on the estimated time of failure.

19. The substrate processing system of claim 13 , wherein the computing device is further to:

process the data from the profile map using a second trained machine learning model, wherein the second trained machine learning model outputs a chamber component condition estimation for a second chamber component of the process chamber; and

determine whether to perform maintenance on the second chamber component of the process chamber based at least in part on the chamber component condition estimation for the second chamber component.

20. A non-transitory computer readable medium comprising instructions that, when executed by a processing device, cause the processing device to perform operations comprising:

receiving a thickness profile map of a film on a substrate, the substrate having been processed in a process chamber of a substrate processing system, and the thickness profile map having been generated by a substrate measurement system of the substrate processing system after the substrate was processed in the process chamber based on measurements of a plurality of locations on the substrate;

processing data from the thickness profile map using a first trained machine learning model, wherein the first trained machine learning model outputs a first chamber component condition estimation for a first chamber component of the process chamber;

determining at least one of a deficiency or a degradation of the first chamber component based on the first chamber component condition estimation; and

determining whether to perform maintenance on the first chamber component of the process chamber based on at least one of the deficiency or the degradation of the first chamber component.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 9, 2022
From: ZHANG, CHUNLEI; ZHU, ZHAOZHAO; KUTNEY, MICHAEL
To: APPLIED MATERIALS, INC.
Reel/Frame 058943/0969 →
Continuity (1)
Related Publication 20230236583A1 · Jul 27, 2023
References Cited (105)
US 5238354A · Volovich · 1993 [cited by applicant]
US 5427878A · Corliss · 1995 [cited by applicant]
US 5452521A · Niewmierzycki · 1995 [cited by applicant]
US 6162008A · Perkins et al. · 2000 [cited by applicant]
US 6304999B1 · Toprac et al. · 2001 [cited by applicant]
US 6625497B2 · Fairbairn et al. · 2003 [cited by applicant]
US 6708075B2 · Sonderman et al. · 2004 [cited by applicant]
US D605652S · Plaisted et al. · 2009 [cited by applicant]
US 7642102B2 · Funk et al. · 2010 [cited by applicant]
US D618695S · Bennett et al. · 2010 [cited by applicant]
US 7904275B2 · Sugimoto · 2011 [cited by applicant]
US 8072578B2 · Yasuda et al. · 2011 [cited by applicant]
US 8179530B2 · Levy et al. · 2012 [cited by applicant]
US 8257546B2 · Davis et al. · 2012 [cited by applicant]
US D756371S · Bertnick et al. · 2016 [cited by applicant]
US 9347879B2 · Adel et al. · 2016 [cited by applicant]
US D766940S · Napper et al. · 2016 [cited by applicant]
US D767612S · Hemsley · 2016 [cited by applicant]
US D781300S · Rhodes et al. · 2017 [cited by applicant]
US D819066S · Anderson et al. · 2018 [cited by applicant]
US D829749S · Kang et al. · 2018 [cited by applicant]
US 10262910B2 · Feng et al. · 2019 [cited by applicant]
US 10388549B2 · Paul et al. · 2019 [cited by applicant]
US 10490462B2 · Pandev et al. · 2019 [cited by applicant]
US D874481S · Kumar et al. · 2020 [cited by applicant]
US D884015S · Walfridsson et al. · 2020 [cited by applicant]
US D890799S · Heffernan et al. · 2020 [cited by applicant]
US 10727057B2 · Clark et al. · 2020 [cited by applicant]
US 10727142B2 · Gellineau et al. · 2020 [cited by applicant]
US D892143S · Dascola et al. · 2020 [cited by applicant]
US 10886155B2 · Zhu et al. · 2021 [cited by applicant]
US D914703S · Capela et al. · 2021 [cited by applicant]
US 11029673B2 · Honda et al. · 2021 [cited by applicant]
US D928818S · Yuk et al. · 2021 [cited by applicant]
US D937861S · Torrance · 2021 [cited by applicant]
US D938465S · Shen et al. · 2021 [cited by applicant]
US D940169S · Boutros et al. · 2022 [cited by applicant]
US D941851S · Anderson et al. · 2022 [cited by applicant]
US D948543S · Friedland et al. · 2022 [cited by applicant]
US 20020018217A1 · Weber-Grabau et al. · 2002 [cited by applicant]
US 20030020889A1 · Takahashi · 2003 [cited by applicant]
US 20050041255A1 · Hyun · 2005 [cited by examiner]
US 20050187649A1 · Funk et al. · 2005 [cited by applicant]
US 20070134829A1 · Wilke et al. · 2007 [cited by applicant]
US 20080013089A1 · Ishii et al. · 2008 [cited by applicant]
US 20090132078A1 · Sakano · 2009 [cited by applicant]
US 20100332011A1 · Venugopal et al. · 2010 [cited by applicant]
US 20110172952A1 · Ummethala et al. · 2011 [cited by applicant]
US 20110232569A1 · Olgado · 2011 [cited by applicant]
US 20120285621A1 · Tan · 2012 [cited by applicant]
US 20130059403A1 · Lee et al. · 2013 [cited by applicant]
US 20150004721A1 · Akimoto et al. · 2015 [cited by applicant]
US 20160077025A1 · Zhang et al. · 2016 [cited by applicant]
US 20160313658A1 · Marciano et al. · 2016 [cited by applicant]
US 20160341544A1 · Foad · 2016 [cited by applicant]
US 20160345384A1 · Zhang · 2016 [cited by examiner]
US 20170038201A1 · Bozdog · 2017 [cited by examiner]
US 20170053819A1 · Richardson · 2017 [cited by applicant]
US 20170213750A1 · Khaja et al. · 2017 [cited by applicant]
US 20180150052A1 · Cherian · 2018 [cited by applicant]
US 20190064751A1 · Ohmori et al. · 2019 [cited by applicant]
US 20190121928A1 · Wu et al. · 2019 [cited by applicant]
US 20190147127A1 · Su et al. · 2019 [cited by applicant]
US 20190286075A1 · Yennie et al. · 2019 [cited by applicant]
US 20190347527A1 · Bhaviripudi et al. · 2019 [cited by applicant]
US 20200050180A1 · Kou et al. · 2020 [cited by applicant]
US 20200083070A1 · Clark et al. · 2020 [cited by applicant]
US 20200083080A1 · Clark · 2020 [cited by examiner]
US 20200110341A1 · Mossavat et al. · 2020 [cited by applicant]
US 20200110390A1 · Banna · 2020 [cited by examiner]
US 20200243359A1 · Hao et al. · 2020 [cited by applicant]
US 20200294836A1 · Criminale · 2020 [cited by examiner]
US 20210166121A1 · Tsutsui · 2021 [cited by applicant]
US 20220026817A1 · Ummethala et al. · 2022 [cited by applicant]
US 20220028716A1 · Ummethala et al. · 2022 [cited by applicant]
US 20220066411A1 · Ummethala et al. · 2022 [cited by applicant]
US 20220111529A1 · Pehlivan et al. · 2022 [cited by applicant]
US 20220165593A1 · Panda et al. · 2022 [cited by applicant]
CN 305860013 · 2020 [cited by applicant]
CN 306604020 · 2021 [cited by applicant]
EP 1959489A2 · 2008 [cited by applicant]
JP 2006157029A · 2006 [cited by applicant]
JP 2018037559A · 2018 [cited by applicant]
JP D1644619S · 2019 [cited by applicant]
JP 2020004817A · 2020 [cited by applicant]
JP D1651220S · 2020 [cited by applicant]
JP D1659894S · 2020 [cited by applicant]
JP D1664109S · 2020 [cited by applicant]
KR 101910268B1 · 2018 [cited by applicant]
TW 202004359A · 2020 [cited by applicant]
WO 0229393A1 · 2002 [cited by applicant]
WO 2012099907A1 · 2012 [cited by applicant]
WO 2019200015A1 · 2019 [cited by applicant]
WO 2020094325A1 · 2020 [cited by applicant]
WO 2021021501A1 · 2021 [cited by applicant]
WO 2021067239A1 · 2021 [cited by applicant]
WO 2021061541A1 · 2022 [cited by applicant]
International Search Report and Written Opinion mailed on Apr. 12, 2023, on application No. PCT/US2022/051285. [cited by applicant]
“Production-centric Yield Management for Wafer Manufacturing” Jan. 5, 2018, Synopisis, site visited Jan. 6, 2022: https://www.synopsys.com/content/dam/synopsys/silicon/datasheets/odyssey-ds .pdf (Year: 2018). [cited by applicant]
Ronald L. Allen et al., “Application of neural networks to plasma etch end point detection”, Journal of Vacuum Science & Technology B: Microelectronics and Nanometer Structures Processing, Measurement, and Phenomena 14,… [cited by applicant]
PCT International Search Report and Written Opinion for International Application No. PCT/US2021/042646 mailed Nov. 2, 2021,10 pages. [cited by applicant]
PCT International Search Report and Written Opinion for International Application No. PCT/US2021/042639 mailed Nov. 11, 2021,10 pages. [cited by applicant]
PCT International Search Report and Written Opinion for International Application No. PCT/US2021/042643 mailed Nov. 11, 2021,9 pages. [cited by applicant]
PCT International Search Report and Written Opinion for International Application No. PCT/US2021/048061 mailed Dec. 17, 2021,9 pages. [cited by applicant]
Taiwan Search report of Taiwan Application No. 110300382 dated Sep. 27, 2021, 7 pages. [cited by applicant]