IP Library › Granted Patent US 12,258,887
Granted Patent B2
US 12,258,887 · App. 18/172,794 · Granted Mar 25, 2025

Cooling gas recovered from a well

Inventors: Jeffrey Earl (Hermosa Beach, CA); Archie Andonian (Huntington Beach, CA); Diego Guimaraes Ferreira (Fullerton, CA)
Assignee: Sapphire Technologies, Inc.
F01K27/02F01D17/00F01D17/16F01D17/26H02K7/1823H02K9/14F01D15/10
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,258,887
App. No.
18/172,794
Granted
Mar 25, 2025
Kind
B2
Abstract

Flow from a gas well is conditioned prior to a production pipeline. A flow line is coupled to a gas well to receive the gas and coupled to a production pipeline to direct the received gas away from the production site, the flow line residing at a production site and comprising an electric power generation system. The electric power generation system has a turbine generator. The inlet nozzle and the turbine wheel of the turbine generator is configured to reduce the pressure and temperature of the received gas to conditions associated with the production pipeline.

Claims (21)

1. A system for cooling flow from a gas well prior to a production pipeline, comprising:

an inlet flow line coupled to a wellhead of the gas well to receive gas produced from the gas well; and

a flow line coupled to the inlet flow line to receive the gas and coupled to the production pipeline to direct the received gas away from a production site, the flow line residing at the production site and comprising an electric power generation system,

the electric power generation system comprising:

a turbine wheel configured to receive the gas and rotate in response to expansion of the gas flowing into an inlet of the turbine wheel and out of an outlet of the turbine wheel,

a nozzle configured to direct the gas into the inlet of the turbine wheel,

an electric rotor coupled to the turbine wheel and configured to rotate with the turbine wheel, and

a stationary electric stator, the electric rotor and electric stator defining an electric generator configured to generate current upon rotation of the electric rotor within the electric stator, and

the turbine wheel configured to reduce the temperature of the received gas at an inlet to the production pipeline to at least a specified temperature associated with the production pipeline.

2. The system of claim 1 , where a pressure of the flow from the gas well is expected to decline from an initial pressure over the operating life of the well, and where the nozzle and the turbine wheel characteristics are selected, based on the expected decline, to maintain a temperature of the received gas at the inlet to the production pipeline to be above the specified temperature while the well is producing gas above a specified maximum pressure associated with the production pipeline.

3. The system of claim 1 , where the specified temperature is a specified maximum temperature for gas supplied to the production pipeline.

4. The system of claim 1 , where the nozzle and the turbine wheel are configured to reduce the temperature of the received gas to 38° C. or lower.

5. The system of claim 4 , where the turbine is configured to reduce the temperature of the received gas while maintaining the temperature above a hydrate formation temperature of the gas at the outlet of the turbine wheel.

6. The system of claim 5 , where there is no heater between the turbine wheel and the production pipeline.

7. The system of claim 1 , comprising a second flow line coupled to the inlet flow line to receive the gas and provide an alternate flow path for the gas around the first mentioned flow line, the second flow line comprising a pressure control valve, and where the first mentioned flow line and the second flow line are coupled downstream of the electric power generation system to recombine flow from the first mentioned flow line and the second flow line.

8. The system of claim 7 , where the nozzle and the turbine wheel are configured to, in cooperation with the pressure control valve in the second flow line, maintain a temperature of the received gas at the inlet to the production pipeline to be above a specified minimum temperature associated with the production pipeline while the well is producing gas above a specified maximum pressure associated with the production pipeline.

9. The system of claim 8 , where the nozzle and turbine wheel are configured to, in cooperation with the pressure control valve in the second flow line, maintain a pressure of the received gas at the inlet to the production pipeline to be below the specified maximum pressure associated with the production pipeline.

10. The system of claim 8 , where the nozzle and the turbine wheel characteristics are selected to maximize the amount of power produced by the electric power generation system while, in cooperation with the pressure control valve in the second flow line, maintaining the temperature of the received gas at the inlet to the production pipeline above the specified minimum temperature while the well is producing gas above the specified maximum pressure associated with the production pipeline.

11. The system of claim 1 , comprising a hermetically sealed housing, hermetically sealed from an inlet of the electric power generation system to an outlet of the electric power generation system, the hermetically sealed housing enclosing the turbine wheel, the electric rotor, and the electric stator and hermetically sealed inline in the first mentioned flow line so that received flow flows through the turbine and over the electric stator.

12. The system of claim 1 , where the electric rotor comprises a permanent magnet rotor.

13. The system of claim 1 , comprising a flow control valve in the flow line upstream of the electric power generation system.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 8, 2023
From: EARL, JEFFREY; ANDONIAN, ARCHIE; FERREIRA, DIEGO GUIMARAES
To: SAPPHIRE TECHNOLOGIES, INC.
Reel/Frame 062925/0222 →
Continuity (2)
Continuation In Part 17814597 · Jul 25, 2022
Related Publication 20240026803A1 · Jan 25, 2024
References Cited (101)
US 3508090A · Crampton et al. · 1970 [cited by applicant]
US 3667215A · Rao · 1972 [cited by examiner]
US 3808794A · Wood · 1974 [cited by applicant]
US 3895243A · Amend · 1975 [cited by examiner]
US 5689175A · Hanson et al. · 1997 [cited by applicant]
US 5924847A · Scaringe et al. · 1999 [cited by applicant]
US 6073447A · Kawakami et al. · 2000 [cited by applicant]
US 6378330B1 · Minta et al. · 2002 [cited by applicant]
US 6560988B2 · Kimble et al. · 2003 [cited by applicant]
US 6727617B2 · McMullen et al. · 2004 [cited by applicant]
US 6751985B2 · Kimble et al. · 2004 [cited by applicant]
US 7608935B2 · Scherzer · 2009 [cited by examiner]
US 7638892B2 · Myers · 2009 [cited by applicant]
US 7841306B2 · Myers et al. · 2010 [cited by applicant]
US 7861548B2 · Shibata et al. · 2011 [cited by applicant]
US 7966840B2 · Shibata et al. · 2011 [cited by applicant]
US 8146360B2 · Myers et al. · 2012 [cited by applicant]
US 8226358B2 · Matsuo et al. · 2012 [cited by applicant]
US 8384232B2 · Myers et al. · 2013 [cited by applicant]
US 8400005B2 · Huber et al. · 2013 [cited by applicant]
US 8564281B2 · Filatov · 2013 [cited by applicant]
US 8680704B1 · Rooney · 2014 [cited by examiner]
US 8739538B2 · Myers et al. · 2014 [cited by applicant]
US 8839622B2 · Myers et al. · 2014 [cited by applicant]
US 9316433B2 · Mak · 2016 [cited by applicant]
US 9568242B2 · Mak · 2017 [cited by applicant]
US 9932843B2 · Narehood et al. · 2018 [cited by applicant]
US 10280796B2 · Dall'Ara et al. · 2019 [cited by applicant]
US 10815882B2 · Marcucci et al. · 2020 [cited by applicant]
US 10895165B2 · Son · 2021 [cited by applicant]
US 11280169B1 · Bean et al. · 2022 [cited by applicant]
US 11781530B2 · Sharma · 2023 [cited by examiner]
US 20030014981A1 · Kimble et al. · 2003 [cited by applicant]
US 20030177785A1 · Kimble et al. · 2003 [cited by applicant]
US 20050217259A1 · Turchetta · 2005 [cited by applicant]
US 20070000267A1 · Shibata et al. · 2007 [cited by applicant]
US 20080246281A1 · Agrawal et al. · 2008 [cited by applicant]
US 20080252077A1 · Myers · 2008 [cited by applicant]
US 20090110485A1 · Cripps · 2009 [cited by examiner]
US 20090126377A1 · Shibata et al. · 2009 [cited by applicant]
US 20090165461A1 · Klassen et al. · 2009 [cited by applicant]
US 20090220335A1 · Matsuo et al. · 2009 [cited by applicant]
US 20100011809A1 · Mak · 2010 [cited by applicant]
US 20100150713A1 · Stankovic · 2010 [cited by examiner]
US 20100187822A1 · Bivins · 2010 [cited by examiner]
US 20100237619A1 · Pozivil et al. · 2010 [cited by applicant]
US 20100301840A1 · Filatov · 2010 [cited by applicant]
US 20100314880A1 · Cripps · 2010 [cited by examiner]
US 20110239701A1 · Kaart et al. · 2011 [cited by applicant]
US 20110283702A1 · Huber et al. · 2011 [cited by applicant]
US 20110289922A1 · Myers et al. · 2011 [cited by applicant]
US 20120013125A1 · Myers et al. · 2012 [cited by applicant]
US 20120090351A1 · Van De Lisdonk et al. · 2012 [cited by applicant]
US 20120248786A1 · Madison · 2012 [cited by applicant]
US 20130015669A1 · Favilli et al. · 2013 [cited by applicant]
US 20130039740A1 · Hawkins · 2013 [cited by applicant]
US 20130286591A1 · Myers et al. · 2013 [cited by applicant]
US 20130300120A1 · Podrog · 2013 [cited by applicant]
US 20130341929A1 · Ho · 2013 [cited by examiner]
US 20140265328A1 · Van Blerk · 2014 [cited by examiner]
US 20150204603A1 · Sheng et al. · 2015 [cited by applicant]
US 20160187058A1 · Mak · 2016 [cited by applicant]
US 20160230586A1 · King et al. · 2016 [cited by applicant]
US 20160338225A1 · Joshi et al. · 2016 [cited by applicant]
US 20160341014A1 · Flight et al. · 2016 [cited by applicant]
US 20170292350A1 · Weflen · 2017 [cited by applicant]
US 20180030855A1 · Dall'Ara et al. · 2018 [cited by applicant]
US 20180171832A1 · Kubo et al. · 2018 [cited by applicant]
US 20180195427A1 · Pandit · 2018 [cited by examiner]
US 20180306109A1 · Marcucci et al. · 2018 [cited by applicant]
US 20190055899A1 · Munevar et al. · 2019 [cited by applicant]
US 20190101061A1 · DiBenedetto · 2019 [cited by applicant]
US 20190153952A1 · Niergarth et al. · 2019 [cited by applicant]
US 20190366803A1 · Harris · 2019 [cited by applicant]
US 20200059179A1 · Pearson · 2020 [cited by applicant]
US 20200124021A1 · Reil · 2020 [cited by examiner]
US 20210156308A1 · Jones · 2021 [cited by applicant]
US 20220074653A1 · Hoffman · 2022 [cited by applicant]
US 20220154568A1 · Fink et al. · 2022 [cited by applicant]
US 20220195848A1 · Olson et al. · 2022 [cited by applicant]
US 20220268143A1 · Fink et al. · 2022 [cited by applicant]
US 20220268515A1 · Nataraj · 2022 [cited by examiner]
US 20220286020A1 · Sharma · 2022 [cited by applicant]
US 20240026851A1 · Earl et al. · 2024 [cited by applicant]
US 20240027128A1 · Earl et al. · 2024 [cited by applicant]
CN 103104812 · 2013 [cited by applicant]
CN 105401990 · 2016 [cited by applicant]
EP 2096264 · 2009 [cited by applicant]
GB 2084653 · 1982 [cited by applicant]
JP 2004303649 · 2004 [cited by applicant]
WO WO2010142698 · 2010 [cited by applicant]
WO WO2022076846 · 2022 [cited by applicant]
WO WO2023196589 · 2023 [cited by applicant]
WO WO2024072535 · 2024 [cited by applicant]
Giardinella et al., “Improve Energy Efficiency Using Expanders,” Chemical Engineering, Apr. 1, 2021, 131(4):28-39. [cited by applicant]
International Search Report and Written Opinion in International Appln. No. PCT/US2023/028467, mailed on Apr. 25, 2024, 17 pages. [cited by applicant]
International Search Report and Written Opinion in International Appln. No. PCT/US2024/016867, mailed on Jun. 24, 2024, 13 pages. [cited by applicant]
International Search Report and Written Opinion in International Appln. No. PCT/US2024/016874, mailed on Jun. 14, 2024, 13 pages. [cited by applicant]
Ristanovic et al., “Turbo-Expander Generators for Supplemental Power Generation in LNG Liquefaction Plants,” IEEE Transactions on Industry Applications, Dec. 2020, 56(6):6094-6103. [cited by applicant]
Sidorov et al., “Numerical Simulation of the Gas Expansion Process in a Turboexpander Unit by the Finite Volume Method,” Thermal Engineering, Aug. 1, 2021, 68(8):604-611. [cited by applicant]
Maghon et al., “50-Hz Heavy Duty Gas Turbines—Experience and Evolution,” Siemens Power Generation (PG), upon information and belief, available no later than Jun. 8, 2021, retrieved on May 20, 2022, 10 pages. [cited by applicant]