IP Library › Granted Patent US 12,286,953
Granted Patent B2
US 12,286,953 · App. 17/814,597 · Granted Apr 29, 2025

Energy recovery from a gas well

Inventors: Jeffrey Earl (Hermosa Beach, CA); Freddie Sarhan (Anaheim, CA); Diego Guimaraes Ferreira (Fullerton, CA)
Assignee: Sapphire Technologies, Inc.
F03B13/00H02K7/1823H02K21/14F05B2220/7068F05B2240/10F05B2240/24
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,286,953
App. No.
17/814,597
Granted
Apr 29, 2025
Kind
B2
Abstract

An energy recovery system for generating electric power from flow out of a gas well includes a first flow path from a well to a pipeline comprising a turbine wheel coupled to a generator and a second flow path from the well to the pipeline. The second flow path is apart from the first flow path, and includes a valve. The first and second flow paths reside on a production site of the well.

Claims (45)

1. An energy recovery system for generating electric power from flow out of a gas well, comprising:

an inlet flow line coupled to a wellhead of the gas well to receive gas produced from the gas well;

a first flow line coupled to the inlet line to receive the gas and comprising an electric power generation system, the electric power generation system residing on a production site of the well and comprising:

a turbine wheel configured to receive the gas and rotate in response to expansion of the gas flowing into an inlet of the turbine wheel and out of an outlet of the turbine wheel,

an electric rotor coupled to the turbine wheel and configured to rotate with the turbine wheel, and

a stationary electric stator, the electric rotor and electric stator defining an electric generator configured to generate current upon rotation of the electric rotor within the electric stator; and

a second flow line coupled to the inlet line to receive the gas and provide an alternate flow path for the gas around the first flow line, the second flow line comprising a pressure control valve configured to control a pressure of the gas through the first flow line toward the turbine wheel and a pressure of the gas through the second flow line, and where the first flow line and the second flow line are coupled downstream of the electric power generation system to recombine flow from the first and the second flow lines.

2. The energy recovery system of claim 1 , comprising a hermetically sealed housing from an inlet of the electric power generation system to an outlet of the electric power generation system the hermetically sealed housing enclosing the turbine wheel, the electric rotor, and the electric stator and hermetically sealed inline in the first flow line so that received flow flows through the turbine and over the electric stator.

3. The energy recovery system of claim 1 , where the electric rotor comprises a permanent magnet rotor.

4. The energy recovery system of claim 1 , comprising a flow control valve in the first flow line upstream of the electric power generation system.

5. The energy recovery system of claim 1 , where a pressure of the flow from the gas well is expected to decline from an initial pressure over the operating life of the well, and the turbine wheel characteristics are selected based on an efficiency of the turbine wheel at a pressure lower than the initial pressure.

6. The energy recovery system of claim 5 , where the first flow line and the second flow line are coupled upstream of a production pipeline, and the turbine wheel characteristics are selected based on a specified minimum temperature of gas flow in the pipeline to be above an expected specified minimum temperature of the gas produced from the gas well over the operating life of the well.

7. The energy recovery system of claim 1 , where the production site is an offshore platform and the electric power generation system is coupled to supply electric power to the offshore platform.

8. The energy recovery system of claim 1 , where the first and second flow lines are coupled at an outlet flow line that receives flow from the first and second flow lines, and the energy recovery system comprises:

a third flow line and a fourth flow line both coupled to the outlet flow line to receive the recombined flow from the first and second flow lines, the fourth flow line comprising a pressure control valve and the third flow line comprising a second electric power generation system residing on the production site of the well, where the second electric power generation system comprising:

a second turbine wheel configured to receive the gas and rotate in response to expansion of the gas flowing into an inlet of the second turbine wheel and out of an outlet of the second turbine wheel, the second turbine wheel characteristics peak in efficiency at a lower pressure than the first mentioned turbine wheel,

a second electric rotor coupled to the second turbine wheel and configured to rotate with the second turbine wheel, and

a second stationary electric stator, the second electric rotor and second electric stator defining a second electric generator configured to generate current upon rotation of the second electric rotor within the second electric stator.

9. The energy recovery system of claim 8 , where the second turbine wheel is configured based on the characteristics of the first mentioned turbine wheel.

10. The energy recovery system of claim 8 , comprising a shut off valve in the first flow line upstream of the first mentioned electric power generation system.

11. The energy recovery system of claim 1 , further comprising a dryer in the inlet flow line upstream of the first flow line, the dryer configured to reduce a moisture content of the received gas.

12. A method of recovering energy and generating power from a flow from a gas well, comprising:

receiving flow from the gas well at a first flow line and a second flow line, the first flow line comprising an electric power generation system residing on a production site of the well and comprising:

a turbine wheel configured to receive the gas and rotate in response to expansion of the gas flowing into an inlet of the turbine wheel and out of an outlet of the turbine wheel,

an electric rotor coupled to the turbine wheel and configured to rotate with the turbine wheel, and

a stationary electric stator, the electric rotor and electric stator defining an electric generator configured to generate current upon rotation of the electric rotor within the electric stator;

flowing a portion of the flow from the gas well through the first flow line and the electric power generation system and a portion of the flow from the gas well through the second flow line, and then recombining the portions downstream of the electric power generation system; and

controlling a pressure of the portion of the gas through the first flow line and a pressure of the portion of the gas through the second flow line with a pressure control valve in the second flow line.

13. The method of claim 12 , where flowing the portion of the flow through the first flow line and the portion of the flow through the second flow line comprises controlling a flow control valve in the first flow line and the pressure control valve in the second flow line.

14. The method of claim 13 , where the electric power generation system comprises a hermetically sealed housing from an inlet of the electric power generation system to an outlet of the electric power generation system, the hermetically sealed housing enclosing the turbine wheel, the electric stator and the electric rotor and hermetically sealed to the remainder of the first flow line and where flowing the portion of the flow from the gas well through the first flow line and the electric power generation system comprises flowing the flow around the electric stator.

15. The method of claim 12 , comprising flowing the portion of the recombined flow through a third flow line comprising a second electric power generation system and a fourth flow line, the second electric power generation system residing on the production site of the well and comprising:

a second turbine wheel configured to receive the gas and rotate in response to expansion of the gas flowing into an inlet of the second turbine wheel and out of an outlet of the second turbine wheel,

a second electric rotor coupled to the second turbine wheel and configured to rotate with the second turbine wheel, and

a second stationary electric stator, the second electric rotor and the second electric stator defining a second electric generator configured to generate current upon rotation of the second electric rotor within the second electric stator; and

flowing the portion of the recombined flow through the third flow line and the second electric power generation system and the portion of the recombined flow through the fourth flow line, and then recombining the portions downstream of the second electric power generation system.

16. The method of claim 15 , operating the first mentioned electric power generation system to produce electricity while operating the second electric power generation system to produce electricity.

17. The method of claim 15 , where the first mentioned turbine wheel is configured to operate at a higher pressure than the second turbine wheel.

18. The method of claim 15 , comprising operating the second electric power generation system to produce electricity while entirely bypassing the first mentioned electric power generation system by closing a valve in the first flow line.

19. A system, comprising:

a first flow path from a well to a pipeline comprising a turbine wheel coupled to a generator; and

a second flow path from the well to the pipeline, apart from the first flow path, and comprising a valve configured to control a pressure of a gas through the first flow path toward the turbine wheel and a pressure of the gas through the second flow path, the first and second flow paths residing on a production site of the well.

20. The system of claim 19 , wherein the turbine wheel and generator reside in a hermetic housing defining a portion of the flow path.

21. The system of claim 19 , where the first and second flow paths converge upstream of the pipeline and the system comprising:

a third flow path downstream of the convergence to the pipeline, the third flow path comprising a second turbine wheel and a second generator, the second turbine wheel being of a different flow characteristic than the first mentioned turbine wheel; and

a fourth flow path downstream of the convergence to the pipeline, apart from the third flow path and comprising a second valve.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 25, 2022
From: EARL, JEFFREY; SARHAN, FREDDIE; FERREIRA, DIEGO GUIMARAES
To: SAPPHIRE TECHNOLOGIES, INC.
Reel/Frame 060608/0474 →
Continuity (1)
Related Publication 20240026851A1 · Jan 25, 2024
References Cited (100)
US 3508090A · Crampton et al. · 1970 [cited by applicant]
US 3667215A · Rao · 1972 [cited by examiner]
US 3808794A · Wood · 1974 [cited by applicant]
US 3895243A · Amend · 1975 [cited by examiner]
US 5689175A · Hanson et al. · 1997 [cited by applicant]
US 5924847A · Scaringe et al. · 1999 [cited by applicant]
US 6073447A · Kawakami et al. · 2000 [cited by applicant]
US 6378330B1 · Minta et al. · 2002 [cited by applicant]
US 6560988B2 · Kimble et al. · 2003 [cited by applicant]
US 6727617B2 · McMullen et al. · 2004 [cited by applicant]
US 6751985B2 · Kimble et al. · 2004 [cited by applicant]
US 7608935B2 · Scherzer · 2009 [cited by examiner]
US 7638892B2 · Myers · 2009 [cited by applicant]
US 7841306B2 · Myers et al. · 2010 [cited by applicant]
US 7861548B2 · Shibata et al. · 2011 [cited by applicant]
US 7966840B2 · Shibata et al. · 2011 [cited by applicant]
US 8146360B2 · Myers et al. · 2012 [cited by applicant]
US 8226358B2 · Matsuo et al. · 2012 [cited by applicant]
US 8384232B2 · Myers et al. · 2013 [cited by applicant]
US 8400005B2 · Huber et al. · 2013 [cited by applicant]
US 8564281B2 · Filatov · 2013 [cited by applicant]
US 8680704B1 · Rooney · 2014 [cited by examiner]
US 8739538B2 · Myers et al. · 2014 [cited by applicant]
US 8839622B2 · Myers et al. · 2014 [cited by applicant]
US 9316433B2 · Mak · 2016 [cited by applicant]
US 9568242B2 · Mak · 2017 [cited by applicant]
US 9932843B2 · Narehood et al. · 2018 [cited by applicant]
US 10280796B2 · Dall'Ara et al. · 2019 [cited by applicant]
US 10815882B2 · Marcucci et al. · 2020 [cited by applicant]
US 10895165B2 · Son · 2021 [cited by applicant]
US 11280169B1 · Bean et al. · 2022 [cited by applicant]
US 11781530B2 · Sharma · 2023 [cited by examiner]
US 20030014981A1 · Kimble et al. · 2003 [cited by applicant]
US 20030177785A1 · Kimble et al. · 2003 [cited by applicant]
US 20050217259A1 · Turchetta · 2005 [cited by applicant]
US 20070000267A1 · Shibata et al. · 2007 [cited by applicant]
US 20080246281A1 · Agrawal et al. · 2008 [cited by applicant]
US 20080252077A1 · Myers · 2008 [cited by applicant]
US 20090110485A1 · Cripps · 2009 [cited by examiner]
US 20090126377A1 · Shibata et al. · 2009 [cited by applicant]
US 20090165461A1 · Klassen et al. · 2009 [cited by applicant]
US 20090220335A1 · Matsuo et al. · 2009 [cited by applicant]
US 20100011809A1 · Mak · 2010 [cited by applicant]
US 20100150713A1 · Stankovic · 2010 [cited by examiner]
US 20100187822A1 · Bivins · 2010 [cited by examiner]
US 20100237619A1 · Pozivil et al. · 2010 [cited by applicant]
US 20100301840A1 · Filatov · 2010 [cited by applicant]
US 20100314880A1 · Cripps · 2010 [cited by examiner]
US 20110239701A1 · Kaart et al. · 2011 [cited by applicant]
US 20110283702A1 · Huber et al. · 2011 [cited by applicant]
US 20110289922A1 · Myers et al. · 2011 [cited by applicant]
US 20120013125A1 · Myers et al. · 2012 [cited by applicant]
US 20120090351A1 · Van De Lisdonk et al. · 2012 [cited by applicant]
US 20120248786A1 · Madison · 2012 [cited by applicant]
US 20130015669A1 · Favilli et al. · 2013 [cited by applicant]
US 20130039740A1 · Hawkins · 2013 [cited by applicant]
US 20130286591A1 · Myers et al. · 2013 [cited by applicant]
US 20130300120A1 · Podrog · 2013 [cited by applicant]
US 20130341929A1 · Ho · 2013 [cited by examiner]
US 20140265328A1 · Van Blerk · 2014 [cited by examiner]
US 20150204603A1 · Sheng et al. · 2015 [cited by applicant]
US 20160187058A1 · Mak · 2016 [cited by applicant]
US 20160230586A1 · King et al. · 2016 [cited by applicant]
US 20160338225A1 · Joshi et al. · 2016 [cited by applicant]
US 20160341014A1 · Flight et al. · 2016 [cited by applicant]
US 20170292350A1 · Weflen · 2017 [cited by applicant]
US 20180030855A1 · Dall'Ara et al. · 2018 [cited by applicant]
US 20180171832A1 · Kubo et al. · 2018 [cited by applicant]
US 20180195427A1 · Pandit · 2018 [cited by examiner]
US 20180306109A1 · Marcucci et al. · 2018 [cited by applicant]
US 20190055899A1 · Munevar et al. · 2019 [cited by applicant]
US 20190101061A1 · DiBenedetto · 2019 [cited by applicant]
US 20190153952A1 · Niergarth et al. · 2019 [cited by applicant]
US 20190366803A1 · Harris · 2019 [cited by applicant]
US 20200059179A1 · Pearson · 2020 [cited by applicant]
US 20200124021A1 · Reil · 2020 [cited by examiner]
US 20210156308A1 · Jones · 2021 [cited by applicant]
US 20220074653A1 · Hoffman · 2022 [cited by applicant]
US 20220154568A1 · Fink et al. · 2022 [cited by applicant]
US 20220195848A1 · Olson et al. · 2022 [cited by applicant]
US 20220268143A1 · Fink et al. · 2022 [cited by applicant]
US 20220268515A1 · Nataraj · 2022 [cited by examiner]
US 20220286020A1 · Sharma · 2022 [cited by applicant]
US 20240026803A1 · Earl et al. · 2024 [cited by applicant]
US 20240027128A1 · Earl et al. · 2024 [cited by applicant]
CN 103104812 · 2013 [cited by applicant]
CN 105401990 · 2016 [cited by applicant]
EP 2096264 · 2009 [cited by applicant]
GB 2084653 · 1982 [cited by applicant]
JP 2004303649 · 2004 [cited by applicant]
WO WO2010142698 · 2010 [cited by applicant]
WO WO2022076846 · 2022 [cited by applicant]
WO WO2023196589 · 2023 [cited by applicant]
Maghon et al., “50-Hz Heavy Duty Gas Turbines—Experience and Evolution,” Siemens Power Generation (PG), upon information and belief, available no later than Jun. 8, 2021, retrieved on May 20, 2022, 10 pages. [cited by applicant]
Giardinella et al., “Improve Energy Efficiency Using Expanders,” Chemical Engineering, Apr. 1, 2021, 131(4):28-39. [cited by applicant]
International Search Report and Written Opinion in International Appln. No. PCT/US2023/028467, mailed on Apr. 25, 2024, 17 pages. [cited by applicant]
International Search Report and Written Opinion in International Appln. No. PCT/US2024/016867, mailed on Jun. 24, 2024, 13 pages. [cited by applicant]
International Search Report and Written Opinion in International Appln. No. PCT/US2024/016874, mailed on Jun. 14, 2024, 13 pages. [cited by applicant]
Ristanovic et al., “Turbo-Expander Generators for Supplemental Power Generation in LNG Liquefaction Plants,” IEEE Transactions on Industry Applications, Dec. 2020, 56(6):6094-6103. [cited by applicant]
Sidorov et al., “Numerical Simulation of the Gas Expansion Process in a Turboexpander Unit by the Finite Volume Method,” Thermal Engineering, Aug. 1, 2021, 68(8):604-611. [cited by applicant]