IP Library Granted Patent US 12,309,798
Granted Patent B2
US 12,309,798 · App. 17/759,466 · Granted May 20, 2025

Transmission of uplink data at start of fixed frame period in frame based equipment mode

Inventors: Changlong Xu (Beijing, CN); Jing Sun (San Diego, CA); Xiaoxia Zhang (San Diego, CA)
Assignee: QUALCOMM Incorporated
H04W72/23H04W74/0816H04W74/0866
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,309,798
App. No.
17/759,466
Granted
May 20, 2025
Kind
B2
Abstract

Various aspects of the present disclosure generally relate to wireless communication. In some aspects, a user equipment (UE) may receive, from a base station, an uplink grant message in a first fixed frame period (FFP) in frame based equipment mode, and transmit data to the base station in a first part of a second FFP, based at least in part on information in the uplink grant message. Numerous other aspects are provided.

Claims (40)

1. A method of wireless communication performed by a user equipment (UE), comprising:

receiving, from a base station, an uplink grant message in a first fixed frame period (FFP) in frame based equipment (FBE) mode; and

transmitting data to the base station in a first part of a second FFP, based at least in part on information in the uplink grant message,

wherein the first part of the second FFP is during a processing time for the UE to decode a channel occupancy time (COT) indicator.

2. The method of claim 1 , wherein the first part of the second FFP is a first one or more symbols of the second FFP.

3. The method of claim 1 , wherein said transmitting data to the base station includes transmitting data to the base station based at least in part on receiving a common downlink control message that indicates that the base station will not contend for the second FFP.

4. The method of claim 1 , wherein said receiving the uplink grant message includes receiving the uplink grant message in a last slot of the first FFP.

5. The method of claim 1 , further comprising receiving the COT indicator from the base station and transmitting said data to the base station based at least in part on the COT indicator.

6. The method of claim 1 , wherein said transmitting data to the base station includes performing a listen before talk (LBT) procedure and transmitting data to the base station based at least in part on a determination that the LBT procedure is successful.

7. The method of claim 6 , wherein said performing the LBT procedure includes performing the LBT procedure in an idle period of the first FFP and before the second FFP.

8. A method of wireless communication performed by a base station, comprising:

transmitting an uplink grant message in a first fixed frame period (FFP) to a user equipment (UE) in frame based equipment (FBE) mode;

receiving data from the UE in a first part of a second FFP, based at least in part on information in the uplink grant message;

performing a listen before talk (LBT) procedure in an idle period of the first FFP and before the second FFP; and

receiving data from the UE in the first part of the second FFP based at least in part on a determination that the LBT procedure is successful, wherein the first part of the FFP includes a processing time for decoding a channel occupancy time (COT) indicator of the base station.

9. The method of claim 8 , wherein said transmitting the uplink grant message includes transmitting the uplink grant message in a last slot of the first FFP.

10. The method of claim 8 , wherein the first part of the second FFP is a first one or more symbols of the second FFP.

11. A user equipment (UE) for wireless communication, comprising:

a memory; and

one or more processors coupled to the memory, the memory and the one or more processors configured to:

receive, from a base station, an uplink grant message in a first fixed frame period (FFP) in frame based equipment (FBE) mode; and

transmit data to the base station in a first part of a second FFP, based at least in part on information in the uplink grant message,

wherein the first part of the second FFP is during a processing time for the UE to decode a channel occupancy time (COT) indicator.

12. The UE of claim 11 , wherein the first part of the second FFP is a first one or more symbols of the second FFP.

13. The UE of claim 11 , wherein the memory and the one or more processors are configured to transmit said data to the base station based at least in part on receiving a common downlink control message that indicates that the base station will not contend for the second FFP.

14. The UE of claim 11 , wherein the memory and the one or more processors are configured to receive the uplink grant message in a last slot of the first FFP.

15. The UE of claim 11 , wherein the memory and the one or more processors are configured to receive the COT indicator from the base station and transmit said data to the base station based at least in part on the COT indicator.

16. The UE of claim 11 , wherein the memory and the one or more processors are configured to perform a listen before talk (LBT) procedure and transmit data to the base station based at least in part on a determination that the LBT procedure is successful.

17. The UE of claim 16 , wherein the memory and the one or more processors are configured to perform the LBT procedure in an idle period of the first FFP and before the second FFP.

18. A base station for wireless communication, comprising:

a memory; and

one or more processors coupled to the memory, the memory and the one or more processors configured to:

transmit an uplink grant message in a first fixed frame period (FFP) to a user equipment (UE) in frame based equipment (FBE) mode;

receive data from the UE in a first part of a second FFP, based at least in part on information in the uplink grant message;

perform a listen before talk (LBT) procedure in an idle period of the first FFP and before the second FFP; and

receive data from the UE in the first part of the second FFP based at least in part on a determination that the LBT procedure is successful, wherein the first part of the FFP includes a processing time for decoding a channel occupancy time (COT) indicator of the base station.

19. An apparatus for wireless communication, comprising:

means for receiving, from a base station, an uplink grant message in a first fixed frame period (FFP) in frame based equipment (FBE) mode; and

means for transmitting data to the base station in a first part of a second FFP, based at least in part on information in the uplink grant message,

wherein the first part of the second FFP is during a processing time for the UE to decode a channel occupancy time (COT) indicator.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 26, 2022
From: XU, CHANGLONG; SUN, JING; ZHANG, XIAOXIA
To: QUALCOMM INCORPORATED
Reel/Frame 060626/0449 →
Continuity (1)
Related Publication 20230055275A1 · Feb 23, 2023
References Cited (49)
US 10791569B2 · Salem · 2020 [cited by examiner]
US 11324016B2 · Sun · 2022 [cited by examiner]
US 11638224B2 · Myung · 2023 [cited by examiner]
US 11864230B2 · Yang · 2024 [cited by examiner]
US 12058734B2 · Lu · 2024 [cited by examiner]
US 12108445B2 · Yang · 2024 [cited by examiner]
US 20160192396A1 · Ng · 2016 [cited by examiner]
US 20180103458A1 · Tooher et al. · 2018 [cited by applicant]
US 20190075581A1 · Salem · 2019 [cited by examiner]
US 20190373636A1 · Yerramalli et al. · 2019 [cited by applicant]
US 20200037336A1 · Sun · 2020 [cited by examiner]
US 20210297969A1 · Myung · 2021 [cited by examiner]
US 20210385863A1 · Fan · 2021 [cited by examiner]
US 20220110152A1 · Lim · 2022 [cited by examiner]
US 20220116995A1 · Lu · 2022 [cited by examiner]
US 20220132569A1 · Salah · 2022 [cited by examiner]
US 20220210827A1 · Wang · 2022 [cited by examiner]
US 20220217708A1 · Li · 2022 [cited by examiner]
US 20220272754A1 · Lei · 2022 [cited by examiner]
US 20220295558A1 · Lei · 2022 [cited by examiner]
US 20220304059A1 · Lei · 2022 [cited by examiner]
US 20230051760A1 · Xu · 2023 [cited by examiner]
US 20230055275A1 · Xu · 2023 [cited by examiner]
US 20230064829A1 · Yang · 2023 [cited by examiner]
US 20230156791A1 · Yang · 2023 [cited by examiner]
US 20230189338A1 · Singh · 2023 [cited by examiner]
US 20230284273A1 · Singh · 2023 [cited by examiner]
US 20240098781A1 · Tsai · 2024 [cited by examiner]
CN 105991272A · 2016 [cited by examiner]
CN 107079494A · 2017 [cited by applicant]
CN 109314967A · 2019 [cited by applicant]
CN 113179675A · 2021 [cited by examiner]
CN 114982332A · 2022 [cited by examiner]
CN 114982332B · 2024 [cited by examiner]
EP 3836721A1 · 2021 [cited by examiner]
EP 4195855A1 · 2023 [cited by examiner]
EP 3895497B1 · 2024 [cited by examiner]
KR 20210029278A · 2021 [cited by examiner]
WO WO2016127648A1 · 2016 [cited by examiner]
WO WO2020023475A1 · 2020 [cited by examiner]
WO 2020027533A1 · 2020 [cited by applicant]
WO WO2020032725A1 · 2020 [cited by examiner]
WO WO2021214730A1 · 2021 [cited by examiner]
WO WO2022030945A1 · 2022 [cited by examiner]
International Search Report and Written Opinion—PCT/CN2020/075017—ISA/EPO—Nov. 17, 2020. [cited by applicant]
Spreadtrum Communications: “Discussion on DL Signals and Channels for NR-U”, 3GPP TSG RAN WG1 #99, R1-1912561, Nov. 22, 2019 (Nov. 22, 2019), 5 pages, section 2.1, 2.2. [cited by applicant]
Qualcomm Incorporated: “DL Signals and Channels for NR-U”, R1-1912936, 3GPP TSG RAN WG1 Meeting #98bis, 3rd Generation Partnership Project, Mobile Competence Centre, 650, Route Des Lucioles, F-06921, Sophia-Antipolis, C… [cited by applicant]
Supplementary European Search Report—EP20918485—Search Authority—The Hague—Oct. 4, 2023. [cited by applicant]
Spreadtrum Communications: “Discussion on DL Signals and Channels for NR-U”, 3GPP TSG RAN WG1 #99, R1-1912561, Reno, USA, Nov. 18, 2019-Nov. 22, 2019, Nov. 8, 2019, 5 pages, Section 2. [cited by applicant]