IP Library › Granted Patent US 12,410,704
Granted Patent B2
US 12,410,704 · App. 18/519,939 · Granted Sep 9, 2025

Predicting wellbore diameters

Inventors: Salahaldeen Saleh Almasmoom (Dammam, SA); Husain Abdulhadi Alyousif (Saihat, SA)
Assignee: Saudi Arabian Oil Company
E21B47/085G01V1/50E21B33/13E21B43/25
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,410,704
App. No.
18/519,939
Filed
Nov 27, 2023
Granted
Sep 9, 2025
Kind
B2
Art Unit
3674
USPC
166/250.01
Abstract

Drilling operations can include: drilling a wellbore in a formation; generating a synthetic diameter wellbore log for the wellbore in the formation based on estimates of wellbore diameter as a function of severity impact ratings associated with drilling activities; and completing the wellbore in the formation based at least in part on the synthetic diameter wellbore log. In some cases, one or more first wellbores are drilled with a BHA that includes a LWD ultrasonic caliper. A diameter of the first wellbores is recorded during a plurality of drilling activities with a severity impact rating assigned to each of the plurality of drilling activities based on the diameter of the first wellbores recorded during that drilling activity.

Claims (28)

1. A method for drilling operations, the method comprising:

drilling one or more first wellbores in a formation using a drill string with a bottom hole assembly (BHA) that includes a logging while drilling (LWD) ultrasonic caliper;

recording a diameter of the first wellbores during a plurality of drilling activities;

assigning a severity impact rating to each of the plurality of drilling activities based on an increase in wellbore diameter during the associated drilling activity;

drilling a second wellbore in the formation;

generating a synthetic diameter wellbore log for the second wellbore in the formation based on synthetic wellbore diameters calculated as a function of the severity impact ratings and the diameter of the first wellbores; and

completing the second wellbore in the formation based at least in part on the synthetic diameter wellbore log.

2. The method of claim 1 , wherein the synthetic diameter wellbore log is generated as the second wellbore is being drilled.

3. The method of claim 2 , wherein parameters of drilling operations are adjusted during drilling based on the synthetic diameter wellbore log.

4. The method of claim 3 , wherein the parameters of drilling operations being adjusted includes at least one of drilling rate, direction of drilling, or rotation of the drill string.

5. The method of claim 1 , wherein completing the second wellbore in the formation based at least in part on the synthetic diameter wellbore log comprises performing cementing operations based at least in part on the synthetic diameter wellbore log.

6. The method of claim 1 , wherein completing the second wellbore in the formation based at least in part on the synthetic diameter wellbore log comprises performing stimulation operations based at least in part on the synthetic diameter wellbore log.

7. The method of claim 1 , wherein the LWD ultrasonic caliper has at least 100 sectors.

8. The method of claim 7 , wherein the LWD ultrasonic caliper has between 160 and 200 sectors.

9. The method of claim 1 , wherein assigning the severity impact rating for each of the plurality of drilling activities comprises increasing the severity impact rating of each of the plurality of drilling activities by 1 for each percent increase in wellbore diameter recorded during the associated drilling activity.

10. The method of claim 1 , wherein the first wellbores and the second wellbore have the same nominal diameter.

11. The method of claim 1 , wherein drilling and recording are performed while drilling a plurality of second wellbores in the formation.

12. The method of claim 11 , wherein assigning a severity impact rating to each of the plurality of drilling activities based on the diameter of the wellbore recorded during that drilling activity for the first wellbores.

13. A method for drilling operations, the method comprising:

drilling a wellbore in a formation;

recording a diameter of a wellbore during a plurality of drilling activities;

assigning a severity impact rating to each of the plurality of drilling activities based on an increase in wellbore diameter during the associated drilling activity;

generating a synthetic diameter wellbore log for the wellbore in the formation based on synthetic wellbore diameters calculated as a function of the severity impact ratings and the diameter of the wellbore; and

completing the wellbore in the formation based at least in part on the synthetic diameter wellbore log.

14. The method of claim 13 , wherein the synthetic diameter wellbore log is generated as a second wellbore is being drilled.

15. The method of claim 14 , wherein parameters of drilling operations are adjusted during drilling based on the synthetic diameter wellbore log.

16. The method of claim 13 , further comprising completing a second wellbore in the formation based at least in part on the synthetic diameter wellbore log, wherein completing the second wellbore comprises performing cementing operations based at least in part on the synthetic diameter wellbore log.

17. The method of claim 13 , further comprising completing a second wellbore in the formation based at least in part on the synthetic diameter wellbore log, wherein completing the second wellbore comprises performing stimulation operations based at least in part on the synthetic diameter wellbore log.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 1, 2024
From: ALMASMOOM, SALAHALDEEN SALEH; ALYOUSIF, HUSAIN ABDULHADI
To: SAUDI ARABIAN OIL COMPANY
Reel/Frame 066330/0185 →
Continuity (1)
Related Publication 20250172066A1 · May 29, 2025
References Cited (10)
US 5900733A · Wu et al. · 1999 [cited by applicant]
US 5963036A · Wu et al. · 1999 [cited by applicant]
US 7279677B2 · Ellis et al. · 2007 [cited by applicant]
US 11604303B2 · Galford · 2023 [cited by applicant]
US 12147005B2 · Hori · 2024 [cited by examiner]
US 20020165670A1 · Ellis et al. · 2002 [cited by applicant]
US 20120037422A1 · Rasheed · 2012 [cited by applicant]
US 20130098685A1 · Collares · 2013 [cited by examiner]
US 20210355814A1 · Shetty et al. · 2021 [cited by applicant]
slb.com [online], “TerraSphere,” retrieved on Jun. 25, 2024, retrieved from URL <https://www.slb.com/products-and-services/innovating-in-oil-and-gas/well-construction/measurements/logging-while-drilling-services/terrasp… [cited by applicant]